• Title/Summary/Keyword: number of coupler thread

Search Result 1, Processing Time 0.018 seconds

Current Status and Appropriate Check Method of Construction Quality Control for Rebar Coupler Splice (철근 커플러이음의 시공품질 확인 현황 및 적정 시공품질 확인 방안)

  • Kim, Ju-Yong;Kim, Jin-Dong;Lee, Young-Do;Kim, Gwang-Hee
    • Journal of the Korea Institute of Building Construction
    • /
    • v.22 no.6
    • /
    • pp.531-542
    • /
    • 2022
  • As buildings become taller, the strength of structural materials must increase and the amount of rebar reinforcement also increases while the application of an appropriate rebar splice method in the construction process become one of the essential factors. In this research, the current status of quality check for rebar coupler is identified by an expert questionnaire and an appropriate quality check method is proposed through a quality test on specimens similar to actual on-site construction. In the test results, it was revealed that, among the quality check methods for rebar coupler joints, the coupler tightening method and face to face degree of between upper and lower rebar did not affect the strength the specimen. Therefore, it is considered to be an appropriate way to check the coupler quality check to check whether the threads are completely assembled during on-site construction through manufacture the number of threads of rebar and coupler with a margin beyond the calculated thread number.