Repair and Replacement Methodology for Electrical Equipment Used in Nuclear Power Plants (원자력발전소 전기기기의 보수, 교체 방법론)

  • Park, Chulhee;Park, Wan-gyu;Lee, Manbok;Kim, Choon-sam
    • Proceedings of the KIPE Conference
    • /
    • 2018.07a
    • /
    • pp.177-179
    • /
    • 2018
  • After Fukushima nuclear accident at 2011, nuclear industrial has been focused on operation and maintenance phase, not design and construction phase. Continued good operating performance of nuclear power plants has been the best critical issue to nuclear utilities. Replacement for complete components as well as parts of components is being procured because nuclear utilities must maintain safety and reliability of operating nuclear power plants. However, many suppliers and manufacturers are giving up a nuclear quality assurance program under reduction in new construction of nuclear power plants. It is able to be increased difficulty in procuring spare parts to support operations and maintenance of nuclear power plants. Over 20% of nuclear power plant equipment in some countries is obsolete. Owing to obsolescence of nuclear safety-related items and/or withdrawing a nuclear quality assurance program of suppliers and manufactures, some replacement item and part might be procured to the item not covered by appendix B to USNRC 10 CFR Part 50. Under various methods of the nuclear repair and replacement methodology, utilities are supposed to establish a typical program for a repair and replacement of an electrical equipment and its parts in conjunction with a nuclear quality assurance. Concerning this typical program, this study suggests the repair and replacement methodology of electrical equipments used in nuclear power plants by procurement of a power supply, based on nuclear regulations, codes, standards, guidelines, specific and general technical information, etc..

  • PDF

Deployment of Radioactive Waste Disposal Facility with the Introduction of Nuclear Power Plants (NPP) in Kenya

  • Shadrack, A.;Kim, C.L.
    • Journal of Nuclear Fuel Cycle and Waste Technology
    • /
    • v.1 no.1
    • /
    • pp.37-47
    • /
    • 2013
  • This paper describes basic plans for the development of a radioactive waste disposal facility with the introduction of Nuclear Power Plants (NPPs) for Kenya. The specific objective of this study was to estimate the total projected waste volumes of low- and intermediate-level radioactive waste (LILW) expected to be generated from the Kenyan nuclear power programme. The facility is expected to accommodate LILW to be generated from operation and decommissioning of nuclear power plants for a period of 50 years. An on-site storage capacity of 700 $m^3$ at nuclear power plant sites and a final disposal repository facility of more than 7,000 $m^3$ capacity were derived by considering Korean nuclear power programme radioactive waste generation data, including Kori, Hanbit, and APR 1400 nuclear reactor data. The repository program is best suited to be introduced roughly 10 years after reactor operation. This study is important as an initial implementation of a national LILW disposal program for Kenya and other newcomer countries interested in nuclear power technology.

Design and analysis of a free-piston stirling engine for space nuclear power reactor

  • Dai, Zhiwen;Wang, Chenglong;Zhang, Dalin;Tian, Wenxi;Qiu, Suizheng;Su, G.H.
    • Nuclear Engineering and Technology
    • /
    • v.53 no.2
    • /
    • pp.637-646
    • /
    • 2021
  • The free-piston Stirling engine (FPSE) has been widely used in aerospace owing to its advantages of high efficiency, high reliability, and self-starting ability. In this paper, a 20-kW FPSE is proposed by analyzing the requirements of space nuclear power reactor. A code was developed based on an improved simple analysis method to evaluate the performance of the proposed FPSE. The code is benchmarked with experimental data, and the maximum relative error of the output power is 17.1%. Numerical results show that the output power is 21 kW, which satisfies the design requirements. The results show that: a) reducing the pressure shell's thickness can improve the output power significantly; b) the system efficiency increases with the wire porosity, while the growth of system efficiency decreases when the porosity is higher than 80%, and system efficiency exhibits a linear relationship with the temperatures of the cold and hot sides; c) the system efficiency increases with the compression ratio; the compression ratio increases by 16.7% while the system efficiency increases by 42%. This study can provide valuable theoretical support for the design and analysis of FPSEs for space nuclear power reactors.

Study on Market Prospects, Financing Challenges and Alternative Solutions in New Nuclear Power Projects (신규 원전의 시장전망 및 금융조달의 과제와 대안)

  • Lee, Jang-pyo
    • KEPCO Journal on Electric Power and Energy
    • /
    • v.2 no.1
    • /
    • pp.133-141
    • /
    • 2016
  • Although construction of any new nuclear power projects had not been launched since mid-1970s until recently in the USA, many new nuclear power plants have been constructed in many countries with the support of their governments mainly as part of their national energy security and electric source diversification policies. For many reasons, the nuclear power industry seemed to reclaim their renaissance from the beginning of this century and the investment in the nuclear power projects draw positive concern from the private financial sector. But the global financial crisis in 2008 and subsequent economic slow-down together with tighter bank credit regulations caused commercial banks, the main source of financing, to lose appetite for investing in new nuclear power projects. But the nuclear power economics shows that the nuclear power is viable in terms of the environmental benefit and long-term average cost compared to other power generation sources. Also doubt about nuclear power safety was much mitigated due to technology development and reinforced safety-related tests and monitoring. Therefore, the prospect for nuclear power market expansion remains positive although there are comparatively big differences among different scenarios. After Korea Electric Power Corp. won the UAE nuclear power project in December of 2009, the competition in nuclear power markets is undergoing huge changes. Competitors backed by the support of their own governments are now entering the market with many aggressive and innovative financing packages to win bids of new nuclear power projects. This report analyzed the nuclear power market prospects, competitive edges of nuclear power, risk management measures, and financing challenges and recommends alternative solutions to promote competitive edges in winning bids of new nuclear power projects.

Seismic Response Analysis of Nuclear Power Plant Structures and Equipment due to the Pohang Earthquake (포항지진에 대한 원자력발전소 구조물 및 기기의 지진응답분석)

  • Eem, Seung-Hyun;Choi, In-Kil
    • Journal of the Earthquake Engineering Society of Korea
    • /
    • v.22 no.3
    • /
    • pp.113-119
    • /
    • 2018
  • The probabilistic seismic safety assessment is one of the methodology to evaluate the seismic safety of the nuclear power plants. The site characteristics of the nuclear power plant should be reflected when evaluating the seismic safety of the nuclear power plant. The Korea seismic characteristics are strong in high frequency region and may be different from NRC Regulatory Guide 1.60, which is the design spectrum of nuclear power plants. In this study, seismic response of a nuclear power plant structure by Pohang earthquake (2017.11.15. (KST)) is investigated. The Pohang earthquake measured at the Cheongsong seismic observation station (CHS) is scaled to the peak ground acceleration (PGA) of 0.2 g and the seismic acceleration time history curve corresponding to the design spectrum is created. A nuclear power plant of the containment building and the auxiliary buildings are modeled using OPENSEES to analyze the seismic response of the Pohang earthquake. The seismic behavior of the nuclear power plant due to the Pohang earthquake is investigated. And the seismic performances of the equipment of a nuclear power plant are evaluated by the HCLPF. As a result, the seismic safety evaluation of nuclear power plants should be evaluated based on site-specific characteristics of nuclear power plants.

Preventing cascading failure of electric power protection systems in nuclear power plant

  • Moustafa, Moustafa Abdelrahman Mohamed Mohamed;Chang, Choong-koo
    • Nuclear Engineering and Technology
    • /
    • v.53 no.1
    • /
    • pp.121-130
    • /
    • 2021
  • Cascading failure is the main cause of large blackouts in electrical power systems; this paper analyzes a cascading failure in Hanbit nuclear power plant unit two (2) caused by a circuit breaker (CB) operation failure. This malfunction has been expanded to the loss of offsite power (LOOP). In this study, current practices are reviewed and then the methodologies of how to prevent cascading failures in protection power systems are introduced. An overview on the implementation of IEC61850 GOOSE messaging-based zone selective interlocking (ZSI) scheme as key solution is proposed. In consideration of ZSI blocking time, all influencing factors such as circuit breaker opening time, relay I/O response time and messages travelling time in the communication network should be taken into account. The purpose of this paper is to elaborate on the effect of cascading failure in NPP electrical power protection system and propose preventive actions for this failures. Finally, the expected advantages and challenges are elaborated.