• Title/Summary/Keyword: nonconformance report

Search Result 2, Processing Time 0.015 seconds

ICT-BIM based Quality Nonconformity Control Method for Construction Project (ICT-BIM 기반 건설프로젝트 품질부적합 관리 시스템)

  • Son, Sang-Hyuk;Lee, Hyung-Guk;Bae, Sang-Hee;Lee, Dong-Eun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2016.05a
    • /
    • pp.76-77
    • /
    • 2016
  • This paper presents an automated construction quality nonconformity control method. Existing quality control process are confined attributed to the dependence on human quality personnels. They are inefficiency for continuos quality improvements and may cause project schedule delays when any nonconformity is handled timely fashion. For sure, It is important to identify the add hoc quality nonconformity control processes and to implement them into an automated system that controls its' work-flow. It would be desirable to develop the construction project quality nonconformity control system using Building information modeling(BIM) and Information and Communications Technologies(ICT). It may provide an effective platform to prevent quality issues that exist in the existing quality management practice.

  • PDF

Wolsong 3&4 Steam Generator Tube Inspection (월성 3,4호기 증기발생기 전열관 검사)

  • Jang, Kyoung-Sik;Kwon, Dong-Ki;Choi, Jin-Hyuk;Son, Tai-Bong
    • Proceedings of the KSME Conference
    • /
    • 2001.11b
    • /
    • pp.859-866
    • /
    • 2001
  • During the Pre-service Inspection for Wolsong Unit 3&4 in 1997/1998 respectively, 17 Distorted Roll Transition indications(over expanded beyond tubesheet secondary face) were identified at the Unit 4 (S/G B, D). Six(6) tubes out of these tubes were plugged in 1998. However the first Periodic Inspection identified additional 110 indications in 1999 and 2000. The additionally identified 110 indication call, not reported at the Pre-service Inspection, are; 2 Not-Finally-Expanded-Tubes and 108 Distorted Roll Transition tubes. Design limit of each Steam Generator tube Plugging is 6.4%. Plugging was performed by the Steam Generator manufacturer under the warranty. When Distorted Roll Transition indications were first identified on the Unit 4 in 1998 the degree of Over-expansion was measured using an inner dial-gage to make the disposition of Nonconformance report. 2 Not-Finally-Expanded-Tubes were plugged and 10 tubes out of 108 Distorted Roll Transition Tubes were also plugged as a preventive measure.

  • PDF