The Study on the Satisfaction Factors of the Support Projects for the Adjacent Residents to Multipurpose Dams (다목적 댐주변지역지원사업 고객만족에 미치는 영향 요인 연구)

  • Kim, Shang Moon;Lee, Byungchul
    • Journal of Korea Water Resources Association
    • /
    • v.46 no.4
    • /
    • pp.335-343
    • /
    • 2013
  • Multi-purpose dams are regarded to contribute to the Korean society not only positive affects but also negative ones. Especially, negative considerations are usually prevailed around multi-purpose dam sites and their vicinities even though the Government adopted "act on dam construction and assistance, etc. to neighborhood area" in 1989 and has supported many various projects since 1990. Nevertheless, many arguments and controversies about effects of multi-purpose dams and support projects to vicinities" have happened so frequently and sometimes brought a suit against government. These situations imply that support projects are not so sufficient to fulfil peoples' expectations. Therefore, this research figured out the key factors that affected residents' satisfaction about multi-purpose dams and support projects. The results of the research are as follows: 1) 'social necessity of dams', 'rationality of the process in supporting project' and 'appropriateness of supporting project', were statistically significant to 'customer satisfaction'; 2) among these factors, 'rationality of the process in supporting project' was the most related to 'customer satisfaction': 3) 'appropriateness of supporting project', 'social necessity of dams' were also revealed as second third factors that relate to the satisfaction.

An algorithm for resolution of resource conflicts in scheduling

  • Han, Jaemin
    • Korean Management Science Review
    • /
    • v.9 no.1
    • /
    • pp.119-137
    • /
    • 1992
  • A two phase heuristic algorithm has been developed for the resolution of resource conflicts in a single project scheduling problem. Phase 1 of the algorithm generates a feasible schedule by repairing resource conflicts. Phase 2 finds local improvements in the schedule found in phase 1. Then, the algorithm has been applied to multi project and job shop scheduling. Computational results are compared with those of dispatching procedures. Index Terms-disjunctive constraints, heuristic algorithm, project scheduling, job-shop scheduling.

  • PDF

RESEARCH AND DEVELOPMENT OF PROGRAM MANAGEMENT SUPPORTING SYSTEM

  • Tetsuya Yamada;Shigehiko Tanabe
    • International conference on construction engineering and project management
    • /
    • 2007.03a
    • /
    • pp.480-489
    • /
    • 2007
  • Program management is a concept to deal with huge and complex business activities from social, economical, cultural and environmental points of view and increase their value for client and society. The aim of this study is to establish a framework of program management process and develop a supporting system for program management. In this paper we propose a framework and a proto type supporting system based on case studies and report the result of application to an urban redevelopment using partially implemented software.

  • PDF

Data-Driven Approaches for Evaluating Countries in the International Construction Market

  • Lee, Kang-Wook;Han, Seung H.
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.496-500
    • /
    • 2015
  • International construction projects are inherently more risky than domestic projects with multi-dimensional uncertainties that require complementary risk management at both the country and project levels. However, despite a growing need for systematic country evaluations, most studies have focused on project-level decisions and lack country-based approaches for firms in the construction industry. Accordingly, this study suggests data-driven approaches for evaluating countries using two quantitative models. The first is a two-stage country segmentation model that not only screens negative countries based on country attractiveness (macro-segmentation) but also identifies promising countries based on the level of past project performance in a given country (micro-segmentation). The second is a multi-criteria country segmentation model that combines a firm's business objective with the country evaluation process based on Kraljic's matrix and fuzzy preference relations (FPR). These models utilize not only secondary data from internationally reputable institutions but also performance data on Korean firms from 1990 to 2014 to evaluate 29 countries. The proposed approaches enable firms to enhance their decision-making capacity for evaluating and selecting countries at the early stage of corporate strategy development.

  • PDF

FUZZY APPROACH TO PROJECT DELIVERY SYSTEM SELECTION

  • F. Nasirzadeh;N. Naderpajouh;A. Afshar;A. Etesami
    • International conference on construction engineering and project management
    • /
    • 2007.03a
    • /
    • pp.662-671
    • /
    • 2007
  • Since variety of construction projects with their individual specifications could be handled through different procurement systems, selection of the most appropriate project delivery system is a vital step towards more efficient project execution. The appropriate selection of project delivery system may also ensure more competent management of the project. Its impacts are not only limited to the first stages of the project, as it could also influence pre-construction, construction and operational phases of the project. Among different approaches exerted for this purpose, none has taken uncertainty into account, despite the fact that during first stages of the project most of the selection factors are still uncertain and not clearly defined. This paper, hence, aims to provide a fuzzy insight into the project delivery system selection. Through this approach more tangible model of the evaluation process may be presented. Proposed fuzzy method is indeed a multi criteria decision making model, based on the group of criteria, assigned for the evaluation procedure. A case study is also conducted, based on the opinion of an invented group of the experts.

  • PDF

Prioritizing Technology Elements in New Product Development Using QFD and Taguchi Method (신제품 개발 프로젝트에서의 요소기술 중요도 결정 방안 : QFD와 다구치 방법의 적용)

  • Yang, Jong-Seo;Yun, Myung-Hwan;Yoon, Il-Bae;Park, Yong-Tae
    • Journal of Technology Innovation
    • /
    • v.12 no.3
    • /
    • pp.111-134
    • /
    • 2004
  • Current technology innovation or new product development project is composed of various process elements that conduct researches on fundamental technologies. However, with the effects of PERT and CPM, the greater part of the existing project management researches have only focused on the resource allocation and scheduling. But in the multi-project environment, priorities between technology elements need to be considered. Furthermore, a disagreement of opinion between project managers and researchers should be considered. In this study, technology element priority was determined using modified QFD and Taguchi method. Outcome of each method was compared to analyze the difference between project managers and researchers. As a result, QFD method showed relatively high level of consistency between project managers and researchers.

  • PDF

A Study on the Elevation and Facade Design of the Multi-family Housing in Paris - A Survey of the Winning Projects in the Multi-family Housing Project Competition in Paris in 2011 - (파리 집합주거 입면계획 경향에 관한 연구 - 2011년 파리 집합주거 공모전 당선작을 중심으로 -)

  • Seok, Jeong-Ho
    • Journal of the Korean housing association
    • /
    • v.24 no.5
    • /
    • pp.17-26
    • /
    • 2013
  • This study is aimed to investigate the characteristics of the elevations in the contemporary multi-family residential buildings in Paris. The survey was performed by studying 30 buildings which had won the multi-family residential project competitions, held in Paris in 2011. Since 30 buildings in the survey will be constructed in Paris in a couple of years, current trends of the elevations of the multi-family residential buildings can be extracted. Historically and also currently, in France, the multi-family housing has been studied to solve the various social problems; especially in Paris where the historical buildings and the modern and the contemporary buildings stand together in perfect harmony. The uniform elevations of the multi-family residential buildings in Korea, have been consist problems in the country. By studying the building elevations in Paris, the solutions to solve the current problems and to improve the situation, can be found. The study will be discussed in three different categories. First of all, the volume and the mass of building in the survey buildings, will be analyzed. Secondly, the openings in the facade, such as the windows and the balconies of the survey projects, will be analyzed. Finally, the materials and the colors of the facade will be discussed. By analyzing the elevations of the multi-family residential building projects, which had won the competitions, and are soon to be built in Paris, the various experiments and the attempts in building elevations, currently happening in Paris which is mostly known as a Haussmann style city, can be presumed, as well as the willingness of the city to reserve the historic buildings in the city.

Multi-dimensional Utilization of a Railway Facility Site and the Need for Institutional Support: The Multi-dimensional Project of the Gyeongbu Line (철도시설 부지 입체적 활용 및 제도적 지원의 필요성 - 경부선 철도 입체화 사업을 대상으로 -)

  • Shin, Eun ho;Kim, Jong gu;Kang, Youn won;Keum, Yun geon;Kwon, Young soo
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.42 no.6
    • /
    • pp.879-885
    • /
    • 2022
  • Of increasing global popularity is the multi-dimensional use and development of cities to address land use and urban issues caused by high urban density and challenging topography. In Korea, the city of Busan has a large proportion of mountainous areas, and the Gyeongbu Line that runs through the city's center has been interrupting this urban area for over 117 years. Because a lack of usable land is hindering the development of the city, introducing a multi-dimensional approach to urban development is seen as important. Accordingly, the Gyeongbu Line underground project is attempting to solve the problem of disconnection of Busan's city center and increase the amount of usable land for varied multi-dimensional use. In this study, by conducting a preference survey among those who live near the underground project sites of the Gyeongbu Line stations in Busan, the planned use of each available land arearesulting from the multi-dimensional development of railroadsand railway stations was investigated. However, in order to further the results of the survey, legal and institutional support is needed. There are limits to the multi-dimensional use of land, such as the lack of interconnection between individual laws and the lack of specific guidelines for multi-dimensional development.

A Study on the Improving the Accuracy of Cost Estimating through Analyzing Influence Factors in Apartment (공동주택 공사비 영향요인 분석을 통한 개산견적의 정확성 향상방안 연구)

  • Yun, Ji-Yeong;Jeong, Kyeong-Tae;Lee, Dong-Hoon
    • Journal of the Korea Institute of Building Construction
    • /
    • v.20 no.2
    • /
    • pp.183-190
    • /
    • 2020
  • Currently, the multi-unit houses are the largest in the ratio of housing types, and the number of households in multi-unit houses is steadily increasing. As the multi-family housing project continues, the accuracy of estimates for decision-making and feasibility assessment are required in the early stages of the project. Therefore, this study selected the influential factors affecting the estimated estimate and showed the relative importance of each factor through weight analysis and suggested the method of calculating the estimated estimate to improve the accuracy. The calculation plan presented through this study will be used as a useful data for project feasibility review and is expected to make a great contribution in preventing the economic loss of the client.

ACTIVITY-BASED STRATEGIC WORK PLANNING AND CREW MANAGEMENT IN CONSTRUCTION: UTILIZATION OF CREWS WITH MULTIPLE SKILL LEVELS

  • Sungjoo Hwang;Moonseo Park;Hyun-Soo Lee;SangHyun Lee;Hyunsoo Kim
    • International conference on construction engineering and project management
    • /
    • 2013.01a
    • /
    • pp.359-366
    • /
    • 2013
  • Although many research efforts have been conducted to address the effect of crew members' work skills (e.g., technical and planning skills) on work performance (e.g., work duration and quality) in construction projects, the relationship between skill and performance has generated a great deal of controversy in the field of management (Inkpen and Crossan 1995). This controversy can lead to under- or over-estimations of the overall project schedule, and can make it difficult for project managers to implement appropriate managerial policies for enhancing project performance. To address this issue, the following aspects need to be considered: (a) work performances are determined not only by individual-level work skill but also by the group-level work skill affected by work team members, each member's role, and any working behavior pattern; (b) work planning has significant effects on to what extent work skill enhances performance; and (c) different types of activities in construction require different types of work, skill, and team composition. This research, therefore, develops a system dynamics (SD) model to analyze the effects of both individual-and group-level (i.e., multi-level) skill on performances by utilizing the advantages of SD in capturing a feedback process and state changes, especially in human factors (e.g., attitude, ability, and behavior). The model incorporates: (a) a multi-level skill evolution and relevant behavior development mechanism within a work group; (b) the interaction among work planning, a crew's skill-learning, skill manifestation, and performances; and (c) the different work characteristics of each activity. This model can be utilized to implement appropriate work planning (e.g., work scope and work schedule) and crew management policies (e.g., work team composition and decision of each worker's role) with an awareness of crew's skill and work performance. Understanding the different characteristics of each activity can also support project managers in applying strategic work planning and crew management for a corresponding activity, which may enhance each activity's performance, as well as the overall project performance.

  • PDF