• 제목/요약/키워드: moving train load

검색결과 71건 처리시간 0.037초

고속철도 교량의 속도별 주행시험을 통한 교량/열차 상호작용해석의 검증 (Verification Study of Train/Bridge Interaction Analysis through Field Tests of a High Speed Railway Bridge)

  • 김성일;이주범;김현민;이희업
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2011년도 정기총회 및 추계학술대회 논문집
    • /
    • pp.1555-1561
    • /
    • 2011
  • The dynamic behavior of a bridge under moving loads has been investigated over many years. Especially, with the introduction of High Speed Railway, numerous theoretical studies on the interaction problem between bridges and trains are carried out. In the present study, advanced bridge/train interaction analyses are performed and compared with field tests of a simply-supported 40m long PSC box girder bridge of Kyung-Bu High Speed Railway. Vertical displacements and vertical accelerations of a bridge with increasing speeds are analyzed. In addition, wheel load reduction rates and accelerations of a car-body of the train are investigated for a study of appropriateness of traffic safety criteria of bridge design specification.

  • PDF

열차 증속에 따른 콘크리트 궤도 노반의 동적 응력 변화 (Dynamic Change of Stresses in Subsoil under Concrete Slab Track Subjected to Increasing Train Speeds)

  • 이태희;최찬용;;정영훈
    • 한국지반공학회논문집
    • /
    • 제29권10호
    • /
    • pp.57-66
    • /
    • 2013
  • 보다 빠른 교통 수단에 대한 사회적 관심이 현재 운영 중인 KTX의 운행속도인 350km/h을 넘어서는 고속 열차의 운행을 요구하고 있다. 본 연구에서는 콘크리트 궤도 구조물에서 열차 속도 변화에 따른 노반 변위의 변화양상을 추적하고 비선형적인 노반 응력 변화를 살펴보기 위해 유한요소해석을 실시하였다. 궤도-차량 상호작용을 간단한 형태로 고려하기 위해 이동 하중의 질점 시스템을 개발하였다. 열차 하중의 이동 속도를 100km/h에서 700km/h까지 변화시켜 결과를 얻었다. 열차 속도 증가에 따라 레일과 노반 변위는 비선형적으로 증가하였으나 뚜렷한 임계 속도 효과는 나타나지 않았다. 낮은 열차 속도 대역에서는 열차 속도보다 노반에서 에너지를 전달하는 탄성파 속도가 빠르다. 하지만 400km/h 이상의 열차 속도 대역에서는 열차 속도와 에너지 전달 속도가 거의 일치하였다. 열차 속도 증가에 따라 노반 응력 이력이 크게 변하며 경로 의존적인 토질 재료에서 상당한 크기의 소성 변형률이 예상된다.

Structural health monitoring-based dynamic behavior evaluation of a long-span high-speed railway bridge

  • Mei, D.P.
    • Smart Structures and Systems
    • /
    • 제20권2호
    • /
    • pp.197-205
    • /
    • 2017
  • The dynamic performance of railway bridges under high-speed trains draws the attention of bridge engineers. The vibration issue for long-span bridges under high-speed trains is still not well understood due to lack of validations through structural health monitoring (SHM) data. This paper investigates the correlation between bridge acceleration and train speed based on structural dynamics theory and SHM system from three foci. Firstly, the calculated formula of acceleration response under a series of moving load is deduced for the situation that train length is near the length of the bridge span, the correlation between train speed and acceleration amplitude is analyzed. Secondly, the correlation scatterplots of the speed-acceleration is presented and discussed based on the transverse and vertical acceleration response data of Dashengguan Yangtze River Bridge SHM system. Thirdly, the warning indexes of the bridge performance for correlation scatterplots of speed-acceleration are established. The main conclusions are: (1) The resonance between trains and the bridge is unlikely to happen for long-span bridge, but a multimodal correlation curve between train speed and acceleration amplitude exists after the resonance speed; (2) Based on SHM data, multimodal correlation scatterplots of speed-acceleration exist and they have similar trends with the calculated formula; (3) An envelope line of polylines can be used as early warning indicators of the changes of bridge performance due to the changes of slope of envelope line and peak speed of amplitude. This work also gives several suggestions which lay a foundation for the better design, maintenance and long-term monitoring of a long-span high-speed bridge.

지반과 슬래브궤도의 상호작용 (Soil and Slab Track Interaction)

  • 강보순;황성춘
    • 한국소음진동공학회:학술대회논문집
    • /
    • 한국소음진동공학회 2002년도 추계학술대회논문집
    • /
    • pp.334-339
    • /
    • 2002
  • In this report, numerical investigations have demonstrated, that the displacement underneath a moving loading reach a maximum value, if the speed of the load is equal to propagation velocity of the maximum wave. The load speed for which the maximum displacement occurs is called critical speed. The critical speed divides the velocities in a subcritical and a super-critical region. By means of calculations the dynamic behaviour of the slab track-soil is investigated. For concrete slab track dynamic wheel load are given in dependence of relevant excitation mechanismen and speed of the train. These loads can be used for the dimensioning of the track as well as for prognosis of the vibrations at the track and the surrounding soil.

  • PDF

열차하중에 대한 지반-제도의 상호작용 (Soil and Track Interaction under Railway Loads)

  • 강보순
    • 한국철도학회논문집
    • /
    • 제8권2호
    • /
    • pp.116-121
    • /
    • 2005
  • In this report, numerical investigations have demonstrated, that the displacement underneath a moving loading reach a maximum value, if the speed of the load is equal to propagation velocity of the maximum wave. The load speed for which the maximum displacement occurs is called critical speed. The critical speed divides the velocities in a subcritical and a super-critical region. By means of calculations the dynamic behaviour of the slab track-soil is investigated. For concrete slab track dynamic wheel load are given in dependence of relevant excitation mechanismen and speed of the train. These loads can be used for the dimensioning of the track as well as far the prognosis of the vibrations at the track and the surrounding soil.

슬래브 궤도에서 열차하중으로 인한 진동문제의 수치 해석적 연구 (Numerical Investigation on Vibrations due to Railway Loads on Slab Tacks)

  • 강보순
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2003년도 춘계학술대회 논문집
    • /
    • pp.91-96
    • /
    • 2003
  • In this report, numerical investigations have demonstrated, that the displacement underneath a moving loa야ng reach a maximum value, if the speed of the load is equal to propagation velocity of the maximum wave. The load speed for which the maximum displacement occurs is called critical speed. The critical speed divides the velocities in a subcritical and a super-critical region. By means of calculations the dynamic behaviour of the slab track-soil is investigated. For concrete slab track dynamic wheel load are given in dependence of relevant excitation mechanism and speed of the train. These loads can be used for the dimensioning of the track as well as for the prognosis of the vibrations at the track and the surrounding soil.

  • PDF

시계열하중을 이용한 PSC 박스 거더 고속철도교량의 동적성능 평가에 관한 연구 (A Study on Dynamic Capacity Assessment of PSC Box Girder High Speed Railway Bridges Using Time Series Load)

  • 한성호;방명석;이우상
    • 대한토목학회논문집
    • /
    • 제30권3A호
    • /
    • pp.211-219
    • /
    • 2010
  • 고속철도교량의 설계개념은 정적하중에 따른 충격계수를 고려하여 기존 교량 구조물의 강성을 증가시키기 위한 방안을 적용하고 있으며, 전반적인 구조설계 과정은 선진 외국기술에 의존하고 있는 실정이다. 그러나 고속철도(Korea Train eXpress: KTX)의 긴 연장(380 m)과 고속(300 km/h) 주행은 공진현상에 상당한 영향을 미치기 때문에 고속철도교량의 동적증폭계수(DAF) 및 동적성능 평가는 상세한 검토가 필수적으로 수행되어야 할 것이다. 따라서 이 연구에서는 전형적인 PSC 박스 거더 고속철도교량을 대상으로 동적성능을 효율적으로 검토하고자 하며, 합리적인 구조설계를 위한 기초자료를 제시하고자 한다. 이를 위해, 기존문헌을 토대로 KTX의 하중선도를 고려하여 정적해석을 수행하였다. 또한 다양한 해석변수를 고려하여 KTX의 이동하중을 시계열하중으로 변환하였으며, 변환된 시계열하중을 이용하여 시간이력해석을 합리적으로 평가하였다. 이때, 시계열하중을 산정하기 위한 변수는 KTX의 하중재하 절점간격, 시간증분 및 속도변화를 고려하였다. FE해석 결과를 바탕으로 PSC 박스 거더 고속철도교량의 동적성능을 체계적으로 검토하였으며, 국내외 관련규정에 따라 구조안전성을 정량적으로 평가하였다.

생체 신호를 이용한 기관사 감시시스템 연구 (A Study of the Dead Man's Switch considering bio-response)

  • 송용수;백종현;고태균;김용규
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2011년도 정기총회 및 추계학술대회 논문집
    • /
    • pp.165-171
    • /
    • 2011
  • A Consider the dead man's switch installed in each and every locomotive cab, which support operational safety on railways around the world. The concept is very simple - every 150 to 180 seconds an illuminated push-button demands to be acknowledged so as to know that the Train Driver is alive and active. In the absence of a response over a period of minutes, the vigilance control will automatically apply the train brakes and bring the train to a stand. If we multiply the resetting of the vigilance control 60 times per hour by a 10-hour shift it equals 600 presses of the button during the shift that a Train Driver must pay attention to and acknowledge. This adds a fair bit of pressure on the train driver's job, particularly when he/she is driving through stations, with passengers moving about on platforms in an environment of complex signaling arrangements - all the while looking out for restricting signals. From this perspective, the Vigilance System's demand to be acknowledged every 150/180 seconds is disturbing and can unnecessarily take a driver's attention away from what is happening outside the confines of the cab. A much more dramatic situation can happen when a train driver is driving hour after hour at night when, by Mother's Nature request - people need to sleep. Experience and research shows that the the dead man's switch can be pressed by train driver in a state of deep relaxation and 'micro-sleep'. The vigilance control system which is applied to reduce the drive load considering bio-response multiple unit train is proposed.

  • PDF

고속열차하중을 받는 슬래브궤도의 동적거동에 관한 연구 (A Study on Behavior of Concrete Slab Track subjected to High Speed Train Loads)

  • 조병완;김영진;허민회;정태호
    • 한국콘크리트학회:학술대회논문집
    • /
    • 한국콘크리트학회 2000년도 봄 학술발표회 논문집
    • /
    • pp.493-598
    • /
    • 2000
  • In the rail facilities, the rail track consists of rail, tie, fastening, accessories and bed. The rail track is largely divided into Ballast Bed Track (BBT) and Concrete Bed Track (CBT) according to the type of bed. In this thesis, among Concrete Bed Track, slab track, which is used for the Japanese high speed railway, is a target of this study. Dynamic analysis by using finite element method are performed where moving train load is periodic function. Then through parametric study, some conclusions are obtained as follows. Cement Asphalt Mortar (CAM) affects contrary mechanical behavior to rail and slab greatly. Therefore, change of CAM spring coefficient should be handled with care. For slab thickness, thin slab is more profitable to reduction of vibration of rail than thick one but mechanical capacity of slab is deteriorated. Improved structural type is proposed, then structural analysis is performed for this one. This type is effective to reduction of vibration of railway system.

  • PDF

장경간 현수교의 고속열차 주행 시 운행한계기준 검토 (Running Safety of a Long Span Suspension Bridge under the Passage of a High Speed Train)

  • 김성일;김현민
    • 한국전산구조공학회:학술대회논문집
    • /
    • 한국전산구조공학회 2011년도 정기 학술대회
    • /
    • pp.477-480
    • /
    • 2011
  • 장경간 케이블 교량은 과도한 변위 발생 등의 이유로 엄격한 안전성 및 사용성이 요구되는 철도교량에서는 제한적으로 적용되고 있다. 즉, 철도교량으로서 요구되는 주행안전성과 승차감을 만족하기 위해서는 면밀한 분석이 필요하다. 본 연구에서는 교량/열차 상호작용 해석을 수행하여 열차에서의 응답을 통해 교량 상을 주행하는 열차의 주행안전성 및 승차감을 직접적으로 평가하고자 하였다. 즉, 중앙경간 300m의 현수교를 주행하는 KTX 열차에 대하여 열차 내부의 가속도와 윤중감소율을 구해 평가하는 방법을 취하였다. 또한, 이동 열차하중과 지진하중이 동시에 작용할 경우를 고려한 교량/열차/지진 상호작용해석을 수행하여 지진 시의 응답을 평가하였다.

  • PDF