• Title/Summary/Keyword: motorways

Search Result 13, Processing Time 0.018 seconds

Assessment of the fonction of Retention Pond, A-71 Motorway, France (프랑스 A-71고속도로변 Retention Pond의 기능평가)

  • 이평구;이재영
    • Journal of Korea Soil Environment Society
    • /
    • v.2 no.1
    • /
    • pp.73-81
    • /
    • 1997
  • Retention ponds have been dug along some of the motorways to control water flow during rainstorms and to minmize environmental pollution. A retention pond located at Les Ardilleres about 20km South of Orleans along the A-71 motorway has been selected to evaluate the effectiveness of such a pond as a trap for heavy metals. Based on the "index of geoaccumulation" and the "enrichment factor" normalized to Fe introduced by Muller in 1979 and by Helz in 1976, respectively, the degree of contamination by heavy metals for the roadside soil and the settling particles was evaluated. As expected, the contamination was very severe in the roadside soil, while it was not so great in the settling particles. Using these methods, cadmium anomaly was traced in the settling particles of the retention pond, their occurrence being attributed partly to natural and partly to anthropogenic pollution. The estimated input of heavy metals associated with settling particles to the pond was 0.9 g/day Pb, 2.1 g/day Zn and 6mg/day Cd. A tentative mass balance of Pb and Zn originated by motor vehicles suggested that only 5 to l1% of heavy metals deposited on the surface of the motorway is carried to the retention pond by runoff water ; suggestions are made to improve their efficiency.ve their efficiency.

  • PDF

Road Accident Trends Analysis with Time Series Models for Various Road Types (도로종류별 교통사고 추세분석 및 시제열 분석모형 개발)

  • Han, Sang-Jin;Kim, Kewn-Jung
    • International Journal of Highway Engineering
    • /
    • v.9 no.3
    • /
    • pp.1-12
    • /
    • 2007
  • Roads in Korea can be classified into four types according to their responsible authorities. For example, Motorway is constructed, managed, and operated by the Korea Highway Corporation. Ministry of Construction and Transportation is in charge of National Highway, and Province Roads are run by each province government. Urban/county Roads are run by corresponding local government. This study analyses the trends of road accidents for each road type. For this purpose, the numbers of accidents, fatalities, and injuries are compared for each road type for last 15 years. The result shows that Urban/County Roads are the most dangerous, while Motorways are the safest, when we simply compare the numbers of accidents, fatalities, and injuries. However, when we compare these numbers by dividing by total road length, National Highway becomes the most dangerous while Province Roads becomes the safest. In the case of road accidents, fatalities, and injuries per vehicle km, which is known as the most objective comparison measure, it turns out that National Highway is the most dangerous roads again. This study also developed time series models to estimate trends of fatalities for each road type. These models will be useful when we set up or evaluate targets of national road safety.

  • PDF

토양 및 지하수 Investigation 과 Remediation에 대한 현장적용

  • Wallner, Heinz
    • Proceedings of the Korean Society of Soil and Groundwater Environment Conference
    • /
    • 2000.11a
    • /
    • pp.44-63
    • /
    • 2000
  • Situated close to Heathrow Airport, and adjacent to the M4 and M25 Motorways, the site at Axis Park is considered a prime location for business in the UK. In consequnce two of the UK's major property development companies, MEPC and Redrew Homes sought the expertise of Intergeo to remediate the contaminated former industrial site prior to its development. Industrial use of the twenty-six hectare site, started in 1936, when Hawker Aircraft commence aircraft manufacture. In 1963 the Firestone Tyre and Rubber Company purchased part of the site. Ford commenced vehicle production at the site in the mid-1970's and production was continued by Iveco Ford from 1986 to the plant's decommissioning in 1997. Geologically the site is underlain by sand and gravel, deposited in prehistory by the River Thames, with London Clay at around 6m depth. The level of groundwater fluctuates seasonally at around 2.5m depth, moving slowly southwest towards local streams and watercourses. A phased investigation of the site was undertaken, which culminated in the extensive site investigation undertaken by Intergeo in 1998. In total 50 boreholes, 90 probeholes and 60 trial pits were used to investigate the site and around 4000 solid and 1300 liquid samples were tested in the laboratory for chemical substances. The investigations identified total petroleum hydrocarbons in the soil up to 25, 000mg/kg. Diesel oil, with some lubricating oil were the main components. Volatile organic compounds were identified in the groundwater in excess of 10mg/l. Specific substances included trichloromethane, trichloromethane and tetrachloroethene. Both the oil and volatile compounds were widely spread across the site, The specific substances identified could be traced back to industrial processes used at one or other dates in the sites history Slightly elevated levels of toxic metals and polycyclic aromatic hydrocarbons were also identified locally. Prior to remediation of the site and throughout its progress, extensive liaison with the regulatory authorities and the client's professional representatives was required. In addition to meetings, numerous technical documents detailing methods and health and safety issues were required in order to comply with UK environmental and safety legislation. After initially considering a range of options to undertake remediation, the following three main techniques were selected: ex-situ bioremediation of hydrocarbon contaminated soils, skimming of free floating hydrocarbon product from the water surface at wells and excavations and air stripping of volatile organic compounds from groundwater recovered from wells. The achievements were as follows: 1) 350, 000m3 of soil was excavated and 112, 000m3 of sand and gravel was processed to remove gravel and cobble sized particles; 2) 53, 000m3 of hydrocarbon contaminated soil was bioremediated in windrows ; 3) 7000m3 of groundwater was processed by skimming to remove free floating Product; 4) 196, 000m3 of groundwater was Processed by air stripping to remove volatile organic compounds. Only 1000m3 of soil left the site for disposal in licensed waste facilities Given the costs of disposal in the UK, the selected methods represented a considerable cost saving to the Clients. All other soil was engineered back into the ground to a precise geotechnical specification. The following objective levels were achieved across the site 1) By a Risk Based Corrective Action (RBCA) methodology it was demonstrated that soil with less that 1000mg/kg total petroleum hydrocarbons did not pose a hazard to health or water resources and therefore, could remain insitu; 2) Soils destined for the residential areas of the site were remediated to 250mg/kg total petroleum hydrocarbons; in the industrial areas 500mg/kg was proven acceptable. 3) Hydrocarbons in groundwater were remediated to below the Dutch Intervegtion Level of 0.6mg/1; 4) Volatile organic compounds/BTEX group substances were reduced to below the Dutch Intervention Levels; 5) Polycyclic aromatic hydrocarbons and metals were below Inter-departmental Committee for the Redevelopment of Contaminated Land guideline levels for intended enduse. In order to verify the qualify of the work 1500 chemical test results were submitted for the purpose of validation. Quality assurance checks were undertaken by independent consultants and at an independent laboratory selected by Intergeo. Long term monitoring of water quality was undertaken for a period of one year after remediation work had been completed. Both the regulatory authorities and Clients representatives endorsed the quality of remediation now completed at the site. Subsequent to completion of the remediation work Redrew Homes constructed a prestige housing development. The properties at "Belvedere Place" retailed at premium prices. On the MEPC site the Post Office, amongst others, has located a major sorting office for the London area. Exceptionally high standards of remediation, control and documentation were a requirement for the work undertaken here.aken here.

  • PDF