• 제목/요약/키워드: module selection

검색결과 207건 처리시간 0.023초

Economical selection of optimum pressurized hollow fiber membrane modules in water purification system using RbLCC

  • Lee, Chul-sung;Nam, Young-wook;Kim, Doo-il
    • Membrane and Water Treatment
    • /
    • 제8권2호
    • /
    • pp.137-147
    • /
    • 2017
  • A water treatment utility in South Korea operates a large system of pressurized hollow fiber membrane (PHFM) modules. The optimal selection of membrane module for the full scale plant was critical issue and carried out using Risk-based Life Cycle Cost (RbLCC) analysis based on the historical data of operation and maintenance. The RbLCC analysis was used in the process of decision-making for replacing aged modules. The initial purchasing cost and the value at risk during operation were considered together. The failure of modules occurs stochastically depending on the physical deterioration with usage over time. The life span of module was used as a factor for the failure of Poisson's probability model, which was used to obtain the probability of failure during the operation. The RbLCC was calculated by combining the initial cost and the value at risk without its warranty term. Additionally, the properties of membrane were considered to select the optimum product. Results showed that the module's life span in the system was ten years (120 month) with safety factor. The optimum product was selected from six candidates membrane for a full scale water treatment facility. This method could be used to make the optimum and rational decision for the operation of membrane water purification facility.

공감모듈과 신뢰가 의료서비스 품질 및 의료 신뢰, 행복에 미치는 영향 (Effect of Sympathy Module and Trust on Medical Service Quality, Medical Trust and Happiness)

  • 조충식;김재익;남승규
    • 동의생리병리학회지
    • /
    • 제29권1호
    • /
    • pp.90-100
    • /
    • 2015
  • There are a lot of effort to improve medical service quality and medical trust in Korean Medicine. However, in spite of importance of personalized medicine, there are still few research about it. Thus, the purpose of this study is to grope ways to improve medical service quality and medical trust by sympathy module group and personalized trust. People over 19 were participated in investigation. We divided respondents into 4 groups depending on sympathy module group and 2 groups depending on speed of trust. Questionnaire was consisted of questions about sympathy module group, speed of trust, medical service quality, medical trust, satisfaction and happiness. This questionnaires were conducted through personal interviews. Total 220 members responded to the survey and the results of the analysis were as follows. Rational type had the highest proportion. At Medical service quality scale, Prevention focus group had most highest figure on Confidence. Promotion focus group and Rational Group had most highest figure on Sympathy. At Medical trust scale, Medical team had the highest proportion at all group. Prevention focus group put more emphasis on sense of sanitation, At Satisfaction and Happiness scale, Satisfaction and Happiness was most affected by Trust in Sincerity and Ability. This study can be very useful for composing kit of treatment of personalized medicine. But this study has also some limits such as respondent selection, disease selection etc. So, more detailed and comprehensive survey is needed.

시간 제약 조건하에서의 모듈 선택을 고려한 전력감소 스케쥴링 (Reducing Power Consumption of a Scheduling for Module Selection under the Time Constraint)

  • 최지영;박남서;김희석
    • 대한전자공학회:학술대회논문집
    • /
    • 대한전자공학회 2003년도 하계종합학술대회 논문집 II
    • /
    • pp.1153-1156
    • /
    • 2003
  • In this paper, we present a reducing power consumption of a scheduling for module selection under the time constraint. Traditional high-level synthesis do not allow reuse of complex, realistic datapath component during the task of scheduling. On the other hand, the proposed scheduling of reducing power consumption is able to approach a productivity of the design the low power to reuse which given a library of user-defined datapath component and to share of resource sharing on the switching activity in a shared resource. Also, we are obtainable the optimal the scheduling result in experimental results of our approach various HLS benchmark environment using chaining and multi-cycling in the scheduling techniques..

  • PDF

RF front-end Module for On-Line UHF Partial-discharge Monitoring System

  • Lee June Young;Kim Bok Ki
    • 대한전자공학회:학술대회논문집
    • /
    • 대한전자공학회 2004년도 학술대회지
    • /
    • pp.776-779
    • /
    • 2004
  • A RF front-end module is designed for GIS(Gas Insulated Substation) which is employed for effective and efficient very high voltage transmission. Major advantage of the unit is improved PO detection sensitivity through minimizing the effect of surrounding interference signals, which is achieved by controlling the gain and the selection of the frequency band, for the precise detection of any UHF PO (Partial Discharge) disturbance occurred in the GIS due to some unwanted problems. For the development of the module, various switches for providing selected signal paths, wideband LNA, 3 BPF for selecting detection frequency band, and video detector are designed, fabricated and measured on 1 mm FR4 substrate with various RF components. The detection sensitivity of the unit was <-60 dBm that is sufficient to detect UHF PO signals as low as 1 pC. It is believed that the value is enough to detect the signal occurred in GIS.

  • PDF

이종병렬기계생산의 일정계획지원 시스템 (A Scheduling Support System for Non-identical Parallel Machine Lines)

  • 정남기;정민영
    • 경영과학
    • /
    • 제17권2호
    • /
    • pp.67-73
    • /
    • 2000
  • This paper describes a scheduling support system for a plant where the machine environment may be modeled as non-identical parallel machine lines (NPML). That is, there are a number of stages in series with various different-capability-machines at each stage. Arriving continuously are jobs with their specific due dates, processing times and candidate processing machines. We’ve developed a real-time scheduling module in conjunction with a supporting production information system which supplies necessary data to the module. This scheduling module is one of the 9 modules in this system, and is composed of both a scheduling interface and a production monitoring interface. This module allows users to generate many candidate schedules by selecting their business policies. The selective arguments which are available consist of allocation costs, batch sizes and machine selection intervals. They are now being implemented at a powder metallurgy plant.

  • PDF

역학적 구조에 대한 Knowledge-based 시스템을 이용한 파라메트릭 설계 (Parametric design for mechanical structure using knowledge-based system)

  • 이창호;김병인;정무영
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 제어로봇시스템학회 1993년도 한국자동제어학술회의논문집(국내학술편); Seoul National University, Seoul; 20-22 Oct. 1993
    • /
    • pp.1018-1023
    • /
    • 1993
  • In mechanical structure design area, many FEM (Finite Element Method) packages are used. But the design using FEM packages depends on an iterative trial and error manner and general CAD systems cannot cope with the change of parameters. This paper presents a methodology for building a designing system of a mechanical structure. This system can generate the drawing for a designed structure automatically. It consists of three steps: generation of a structure by selection of the parameters, stress analysis, and generation of a drawing using CAD system. FEM module and parametric CAD module are developed for this system. Inference engine module generates the parameters with a rule base and a model base, and also evaluates the current structure. The parametric design module generates geometric shapes automatically with given dimension. Parametric design is implemented with the artificial intelligent technique. In older to the demonstrate the effectiveness of the developed system, a frame set of bicycle was designed. The system was implemented on an SUN workstation using C language under OpenWindows environment.

  • PDF

태양광발전시스템의 효율 향상을 위한 태양전지 모듈의 최적 설계에 관한 연구 (A Study on the Optimal PV-module Design for Efficiency Improvement of Photovoltaic System)

  • 김민;이기제;이진섭
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2001년도 추계학술대회 논문집 전기기기 및 에너지변환시스템부문
    • /
    • pp.328-330
    • /
    • 2001
  • The construct of photovoltaic module array, main power source of photovoltaic system, is very important to the efficiency improvement of whole photovoltaic system. Photovoltaic modules are usually connected in series or parallel to meet power capacity required. Since output characteristics of a photovoltaic module are greatly fluctuated on the variation of insolation, temperature and its type, the maximum open circuit voltage and output operating voltage of photovoltaic module array must exist in the admissible input voltage range of inverter system under any operating conditions. In this paper, we present the selection and array method of photovoltaic modules through simulation for the coupling loss reduction between photovoltaic modules and a inverter.

  • PDF

공동이용을 위한 음성DB의 구축 및 음성 자료 수집을 위한 Workbench의 구현 (Construction of Korean Speech DB for Common Use and Implementation of Workbench for Spoken Language Data Acquisition)

  • 김봉완;이용주
    • 대한음성학회지:말소리
    • /
    • 제35_36호
    • /
    • pp.189-209
    • /
    • 1998
  • This study discusses Korean speech database that has been designed and constructed for common use, especially focusing on designing a list of words or sentences that covers various phonological environments. As the results, PBW(Phonetically Balanced words) and PBS(Phonetically Balanced Sentences) was selected from balanced text corpus using maximum entropy method. And, implemented workbench for spoken language data acquisition is presented in this paper. The workbench consists of grapheme to phoneme converter, utterance list selection module, speech data editing module, multi-layer labelling module, and phoneme context search module.

  • PDF

함수 수준에서 프로파일 정보를 이용한 ARM과 Thumb 명령어의 선택 (Profile Guided Selection of ARM and Thumb Instructions at Function Level)

  • 소창호;한태숙
    • 한국정보과학회논문지:소프트웨어및응용
    • /
    • 제32권3호
    • /
    • pp.227-235
    • /
    • 2005
  • 임베디드 시스템에서는 메모리와 에너지의 소비가 중요한 관심사 중 하나이다. 메모리와 에너지의 소비를 줄이기 위해 32비트의 ARM 프로세서는 16비트 Thumb 명령어 세트를 지원한다. 주어진 응용프로그램에 대해 Thumb 코드는 일반적으로 ARM 코드보다 코드 사이즈가 작지만, 실행속도는 느리다. 코드 사이즈가 작으면서도 실행속도가 느리지 않은 코드를 생성하기 위한 방법으로 Krishnaswarmy는 응용프로그램에 대한 프로파일 정보를 이용하여 모듈 수준에서 ARM과 Thumb 명령어 세트를 선택하는 알고리즘을 고안했다. 이 알고리즘은 작은 성능 손실로도 상당한 코드 사이즈 감소 효과를 갖지만, 명령어 세트가 모듈 수준에서 선택되기 때문에 Thumb 코드로 컴파일 하면 코드 사이즈를 줄일 수 있는 함수들도 ARM 코드로 컴파일 되어, 추가적인 코드 사이즈 감소의 기회를 잃게 되는 문제점을 갖고 있다. 본 논문에서는 ARM과 Thumb 코드가 혼합된 코드 사이즈의 감소를 이끌어내기 위해 함수 수준에서 프로파일(Profile) 정보를 이용한 명령어 세트 선택 알고리즘을 제안했다. 우리는 성능에서의 페널티는 없이 2.7%의 코드 사이즈를 추가로 줄일 수 있었다.

전문가 시스템 접근법을 이용한 기계가공용 셋업계획 (Setup Planning for Machining processes Using Expert System Approach)

  • 정영득
    • 산업공학
    • /
    • 제6권1호
    • /
    • pp.31-45
    • /
    • 1993
  • Setup planning for machining processes is a part of fixture planning which is also a part of process planning. A setup of a part is defined as a group of features which are machined while the part is fixtured in one single fixture. Setup planning includes a number of tasks such as the selection of setup, sequence of setups and datum frame for each setup. Setup planning is an important function in fixture planning which must be able to support and to clamp a workpiece to prevent deflections caused by machining and clamping loads. This paper presents setup planning system using expert system approach(SPES) for prismatic parts which can be machined on vertical milling machine. SPES consists of preprocessing module and main processing module. Preprocessing module executes the conversion of feature data to frame type data and the determination of setups, and main processing module executes the determination of datum frame of each setup and sequance of setups. Preprocessing module is coded by C language and main processing module is a rule-based expert system using EXSYS pro. The performance of SPES is evaluated through case studies and the results show successful work except for operation sequence of machining holes. This is due to the limited rules for machining holes.

  • PDF