Stakeholders' Perception of the Causes and Effects of Construction Delays on Project Delivery

  • Akinsiku, Olusegun Emmanuel;Akinsulire, Akintunde
    • Journal of Construction Engineering and Project Management
    • /
    • v.2 no.4
    • /
    • pp.25-31
    • /
    • 2012
  • The growing rate of delays is adversely affecting the timely delivery of construction projects. This study therefore assesses construction stakeholders' perception of the causes of delays and its effects on project delivery in a bid to proffer solution in minimizing the occurrences of delays. Questionnaire was used to elicit responses from construction stakeholders; a total of thirty three causes of delays, seventeen resultant effects of delays and fifteen methods of minimizing construction delays were identified for the study based on literature reviews. The results suggest that client's cash flow related problems are the main causes of delays while time and cost overruns are the major identifiable effects of delays in construction projects. However, adequate project planning and budgeting were suggested as possible ways of minimizing the occurrences of delays.

Stakeholders' Perception of the Causes and Effect of Construction Delays on Project Delivery-A Review

  • Gandhak, Prajyot;Sabihuddin, Syed
    • Journal of Construction Engineering and Project Management
    • /
    • v.4 no.4
    • /
    • pp.41-46
    • /
    • 2014
  • Indian Construction industry is large, volatile, and requires tremendous capital outlays. Typically, the work offers low rates of return in relation to the amount of risk involved. A unique element of risk in the industry is the manner in which disputes and claims are woven through the fibre of the construction process. Delay is generally acknowledged as the most common, costly, complex and risky problem encountered in construction projects. Because of the overriding importance of time for both the Owner and the Contractor, it is the source of frequent disputes and claims leading to lawsuits. The growing rate of delays is adversely affecting the timely delivery of construction projects. Presently construction industries are facing a lot of problems, considering that a paper assess construction stakeholder's perception to the causes of delays and its effects on project delivery. And also one case study is considered in this paper to elicit responses from construction stakeholders. The primary aim of this paper is to identify the perceptions of the different parties regarding causes of delays, the allocation of responsibilities and the types of delays, and method of minimizing the construction delays.

An Enhanced Mobile IP Handoff Mechanism using Routing Optimization and Binding Extension (경로설정 최적화와 바인딩 확장을 이용한 개선된 Mobile IP 핸드오프 기법)

  • 오현우
    • Proceedings of the Korea Society for Simulation Conference
    • /
    • 1999.10a
    • /
    • pp.127-132
    • /
    • 1999
  • A mobile IP is proposed to support host mobility over the current Internet. One of the most important issues on the host mobility is location and routing schemes that allow mobile hosts to move effectively from one site to another. In a Mobile IP environment, frequent handoffs are likely to degrade the performance by minimizing the loss of datagrams during handoffs. The handoff scheme is using routing optimization and binding extension to improve the performance by minimizing the average transfer delay of messages and packet loss. Simulation details show the improvement of transport delays and packet loss rate.

  • PDF

Effective simulation-based optimization algorithm for the aircraft runway scheduling problem

  • Wided, Ali;Fatima, Bouakkaz
    • Advances in aircraft and spacecraft science
    • /
    • v.9 no.4
    • /
    • pp.335-347
    • /
    • 2022
  • Airport operations are well-known as a bottleneck in the air traffic system, putting growing pressure on the world's busiest airports to schedule arrivals and departures as efficiently as possible. Effective planning and control are essential for increasing airport efficiency and reducing aircraft delays. Many algorithms for controlling the arrival/departure queuing area are handled, considering it as first in first out queues, where any available aircraft can take off regardless of its relative sequence with other aircraft. In the suggested system, this problem was compared to the problem of scheduling n tasks (plane takeoffs and landings) on a multiple machine (runways). The proposed technique decreases delays (via efficient runway allocation or allowing aircraft to be expedited to reach a scheduled time) to enhance runway capacity and decrease delays. The aircraft scheduling problem entails arranging aircraft on available runways and scheduling their landings and departures while considering any operational constraints. The topic of this work is the scheduling of aircraft landings and takeoffs on multiple runways. Each aircraft's takeoff and landing schedules have time windows, as well as minimum separation intervals between landings and takeoffs. We present and evaluate a variety of comprehensive concepts and solutions for scheduling aircraft arrival and departure times, intending to reduce delays relative to scheduled times. When compared to First Come First Serve scheduling algorithm, the suggested strategy is usually successful in reducing the average waiting time and average tardiness while optimizing runway use.

Study on Dispatching with Quality Assurance (품질을 고려한 작업투입에 관한 연구)

  • Ko, Hyo-Heon;Kim, Jihyun;Baek, Jun-Geol;Kim, Sung-Shick
    • Journal of Korean Institute of Industrial Engineers
    • /
    • v.34 no.1
    • /
    • pp.108-121
    • /
    • 2008
  • Dispatching rule for parallel machines with multi product is proposed in this paper, In current market,customer's request for higher quality is increasing, In accordance with such demand, manufacturers are focusingon improving the quality of the products. Such shift in production objective is risky. The possibility ofneglecting another important factor in customer satisfaction increases, namely due dates. From the aspect ofimproving quality, frequency of product assignment to limited number of high performance machines willincrease. This will lead to increased waiting time which can incur delays, In the case of due date orientedproduct dispatch, Products are assigned to machines without consideration for quality. Overall deterioration ofproduct quality is inevitable, In addition, Poor products will undergo rework process which can increase delays.The objective of this research is dispatching products to minimize due date delays while improving overallquality. Quality index is introduced to provide means of standardizing product quality. The index is used toassure predetermined quality level while minimizing product delays when dispatching products. Qualitystandardization method and dispatching algorithm is presented. And performance evaluation is performed withcomparison to various dispatching methods.

Development of a Cycle-free Based, Cooridinated Dynamic Signal Timing Model for Minimizing Delay (Using Genetic Algorithm) (지체도 최소화를 위한 주기변동기반 동적신호시간 결정모헝 개발)

  • 이영인;최완석;임재승
    • Journal of Korean Society of Transportation
    • /
    • v.19 no.1
    • /
    • pp.115-129
    • /
    • 2001
  • The purpose of this study is to develop a cycle-free signal timing model for minimizing delays based on Third-generation control concept using Genetic Algorithm. A special feature of this model is its ability to manage delays of turning movements on the cycle basis. The model produces a cycle-free based signal timing(cycles and green times) for each intersection to minimize delays of turning movements on the cycle basis. The performance of cycle-free signal timings was evaluated on normal (v/c = 0.7) and oversaturated (v/c=1.0) conditions. The performance measures are throughput and the number of queued vehicles at the end of green time. The result shows that the cycle free signal timing is superior to the fixed signal timing to manage traffic flows of intersections; (1) the proposed model accomplishes the basic objective of the research, producing cycle free signal timings on the cycle basis, (2) on normal conditions, cycle free signal timings produce less queued vehicles at the end of green time, and (3) on oversaturated conditions, the cycle free signal timing is superior to the fixed signal timing to manage saturated traffic flows of intersections.

  • PDF

A Priority Allocation Scheme Considering Virtual Machine Scheduling Delays in Xen Environments (Xen 환경에서 스케줄링 지연을 고려한 가상머신 우선순위 할당 기법)

  • Yang, Eun-Ji;Choi, Hyun-Sik;Han, Sae-Young;Park, Sung-Yong
    • Journal of KIISE:Computer Systems and Theory
    • /
    • v.37 no.4
    • /
    • pp.246-255
    • /
    • 2010
  • There exist virtual machine scheduling delays in virtualized environment in which virtual machines share physical resources. Many resource management systems have been proposed to provide better application QoS through monitoring and analyzing application performance and resource utilization of virtual machines. However, those management systems don't consider virtual machine scheduling delays, result in incorrect application performance evaluation and QoS violations In this paper, we propose an application behavior analysis considering the scheduling delays, and a virtual machine priority allocation scheme based on the analysis to improve the application response time by minimizing the overall virtual machine scheduling delays.

New Permanent Magnet Synchronous Motor Current Sensing Phase Delay Compensation Method

  • Park, Sei-Hun;Kim, Il-Hwan
    • Journal of Electrical Engineering and Technology
    • /
    • v.11 no.1
    • /
    • pp.241-246
    • /
    • 2016
  • This paper presents a method that can improve the performance of permanent magnet synchronous motor current control by minimizing the measured current phase delay caused by the Low Pass Filter(LPF) used to cut off the noises that flowed in when feedback currents are measured. Although existing methods that change the Cutoff Frequency of the LPF can minimize phase delays during high speed rotations, their noise cutoff effects are much lower and this may lead to the decline of control performance. Therefore, in this study, an algorithm that can compensate current phase delays through relatively simple calculations from the synchronous motor d-q axis coordinate transformation matrix and the inverse transformation matrix is proposed and the validity of the proposed method is verified by comparing the waveform of the calculated current with the waveform of actual currents through simulations and experiments.

Robust H$\infty$ Filtering for discrete-Time Polytopic Uncertain Systems with Multiple Time Delays

  • Kim, Jong-Hae;Park, Hong-Bae
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 2001.10a
    • /
    • pp.34.3-34
    • /
    • 2001
  • The design method of H$\infty$ filter for discrete-time uncertain linear systems with multiple state delays is investigated. The uncertain parameters are assumed to be unknown but belonging to known convex compact set of polytope type less conservative than norm bounded parameter uncertainty. The modified H$\infty$ performance measure is introduced to consider the initial states values which affect the performance of filter. The objective is to design a stable H$\infty$ filter guaranteeing asymptotic stability of filtering error dynamics and minimizing H$\infty$ norm bound. The sufficient condition for the existence of filter and the filter design method are established by LMI (linear matrix inequality) approach.

  • PDF

Development of New Methods for Position Estimation of Underground Acoustic Source Using a Passive SONAR System

  • Jarng, Soon-Suck;Lee, Je-Hyeong;Ahn, Heung-Gu
    • Transactions on Control, Automation and Systems Engineering
    • /
    • v.2 no.1
    • /
    • pp.69-75
    • /
    • 2000
  • The aim of the work described in this paper is to develop a complex underground acoustic system which detects and localizes the origin of an underground hammering sound using an array of hydrophones located about 100m underground. Three different methods for the sound localization will be presented, a time-delay method, a power-attenuation method and a hybrid method. In the time-delay method, the cross correlation of the signals received from the array of sensors is used to calculate the time delays between those signals. In the power-attenuation method, the powers of the received signals provide a measure of the distances of the source from the sensors. In the hybrid method, both informations of time-delays and power-ratios are coupled together to produce better performance of position estimation. A new acoustic imaging technique has been developed for improving the hybrid method. This new acoustic imaging method shows the multi-dimensional distribution of the normalized cost function, so as to indicate the trend of the minimizing direction toward the source location. For each method the sound localization is carried out in three dimensions underground. The distance between the true and estimated origins of the source is 28m for a search area of radius 250m.

  • PDF