• Title/Summary/Keyword: maximum protrusion

Search Result 42, Processing Time 0.016 seconds

Long-term performance of drainage system for leakage treatment of tunnel operating in cold region (한랭지역에서 운영 중인 터널의 누수처리를 위한 유도배수시스템의 장기 성능 평가)

  • Kim, Dong-Gyou
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.20 no.6
    • /
    • pp.1177-1192
    • /
    • 2018
  • The objective of this study is to develop the existing drainage system for catching the partial leakage of tunnel structures operating in cold region. The drainage system consists of drainage board, Hotty-gel as a waterproofing material, cover for preventing protrusion of Hotty-gel, air nailer, fixed nail, pipe for collecting ground leak, pipe for conveying ground leak, wire-mesh, and sprayed cement mortar. The drainage systems were installed in conventional concrete lining tunnels to evaluate the site applicability and constructability. The performances of waterproof and the drainage in the drainage system were evaluated by injecting 1,000 ml of red water in the back of the drainage system at 7 days, 14 days, 21 days, 28 days, 2 months, 3 months, 4 months, 5 months, 6 months, 7 months and 8 months. During 8 months of field test, the average daily temperature of the tunnel site was measured from $-16.0^{\circ}C$ to $25.6^{\circ}C$. The daily minimum temperature was $-21.3^{\circ}C$ and the daily maximum temperature was $30.8^{\circ}C$. There was no problem in waterproof and drainage performance of the drainage board in the drainage system. However, the pipe for conveying ground leak had the leakage problem from 14 days. It is considered that the leakage of the pipe for conveying ground leak was caused by the deformation of the pipe of the flexible plastic material having a thickness of 0.2 cm by using the high pressure air nailer and the fixing pin and the insufficient thickness and width of the hotty-gel for preventing the leakage.

Study of heat transfer to the implant-bone interface induced by grinding of occlusal surface of implant gold prosthesis (금 합금 보철물의 교합면 삭제로 인한 임플란트-골 계면으로의 열전달에 관한 연구)

  • Jo, Jae-Young;Kang, Sun-Nyo;Jeong, Chang-Mo;Yun, Mi-Jung;Huh, Jung-Bo;Jeon, Young-Chan
    • The Journal of Korean Academy of Prosthodontics
    • /
    • v.50 no.1
    • /
    • pp.29-35
    • /
    • 2012
  • Purpose: The purpose of this study was to analyze temperature change along the implant-bone interface induced by grinding the occlusal surface of implant gold prosthesis and to compare the temperature generated by grinding of prosthesis with different cooling methods. Materials and methods: The experimental gold prostheses were fabricated with dental gold alloy and castable abutment. The prostheses had 3 cylindrical protrusions on the occlusal surface with 1mm in height. Temperature was measured using 16 thermocouple wires attached to the implant fixture surface and the fixture was embedded in an acrylic resin block inside the $37^{\circ}C$ water bath. Cylinders were grinded for a period of 30 second with a low-speed handpiece with green stone point. One cylindrical protrusion was grinded without cooling, the second one was grinded with air blow, and the third one was grinded with water-spray. Results: The mean maximum temperature was measured more than $47^{\circ}C$ of the implant and the maximum temperature was measured at the cervical portion of the implant in the group without cooling. There was statistically significant difference between the group without cooling and the groups with cooling (P<.05). However, there was no significant difference at all portion of implant in the groups with cooling (P>.05). Conclusion: The results of this study support that the grinding of implant gold prosthesis without cooling may damage the peri-implant tissue. The continuous use of air blow and water-spray adjacent to prosthesis during the grinding of implant gold prosthesis may prove to be beneficial for cooling of the implant.