In new deregulated electricity market, short-term price forecasting is key information for all market players. A better forecast of market-clearing price (MCP) helps market participants to strategically set up their bidding strategies for energy markets in the short-term. This paper presents a new prediction strategy to improve the need for more accurate short-term price forecasting tool at spot market using an artificial neural networks (ANNs). To build the forecasting ANN model, a three-layered feedforward neural network trained by the improved Levenberg-marquardt (LM) algorithm is used to forecast the locational marginal prices (LMPs). To accurately predict LMPs, actual power generation and load are considered as the input sets, and then the difference is used to predict price differences in the spot market. The proposed ANN model generalizes the relationship between the LMP in each area and the unconstrained MCP during the same period of time. The LMP calculation is iterated so that the capacity between the areas is maximized and the mechanism itself helps to relieve grid congestion. The addition of flow between the areas gives the LMPs a new equilibrium point, which is balanced when taking the transfer capacity into account, LMP forecasting is then possible. The proposed forecasting strategy is tested on the spot market of the Nord Pool. The validity, the efficiency, and effectiveness of the proposed approach are shown by comparing with time-series models
In the uniform price electricity market or bilateral electricity market, the energy transactions in which the network is not considered and ISO's system operation costs which ISO try to minimize are settled separately. In this paper, transmission loss, one of the ISO's system operation costs, was dealt. The conventional marginal loss allocation method gives economic signals but three aspects have to be considered; excessiveness, arbitrariness and cross-subsidy. In this paper, marginal loss compensation efficiency method was suggested which consider those aspects of the conventional marginal loss allocation method. Also the characteristics of the marginal loss compensation efficiency were analyzed in the appendixes. And simple 2-bus system and IEEE 14 bus system were used to explain these characteristics.
Unlike price calculation by cost accounting, which categorizes costs into material costs, labor costs, and miscellaneous expenses to determine the construction budget price, construction cost calculation based on Construction Standard Unit Prices utilizes unit prices extracted from market prices of items from projects already completed to estimate costs of similar construction projects. Although unit price information is collected through construction site surveys to revise these construction standard unit prices every year, but due to the limitations of the site survey method, it is difficult to quickly implement the rapid changes in the construction methods and market prices. As such, an important issue that arose was the identification of work items whose prices need urgent revision. This study conducted research on factors that need to be considered when developing online survey system for monitoring construction site market prices. This study is expected to enhance convenience for users, and provide an efficient data collection and management system for administrators.
This paper presents a two-stage market auction model in a pool-based electricity market, which explicitly takes into account the system network security. The security network-constrained market auction model considers the use of corrective control to yield economically efficient actions in the post-contingency state, while ensuring a certain security level. Under this framework, the proposed model shows not only for quantifying the correlation between secure system operation and efficient market operation, but also for providing transparent information on the pricing system security for market participants. The two-stage market auction procedure is formulated using Benders decomposition (BD). In the first stage, the market participants bid in the market for maximizing their profit, and the independent system operator (ISO) clears the market based on social welfare maximization. System network constraints incorporating post-contingency control actions are described in the second stage of the market auction procedure. The market solutions, along with the BD, yield nodal spot prices (NSPs) and nodal congestion prices (NCPs) as byproducts of the proposed two-stage market auction model. Two benchmark systems are used to test and demonstrate the effectiveness of the proposed model.
The Act on Distribution and Price Stabilization of Agricultural and Fisheries Product, which specifies rules and regulations on the trading system of fishery products wholesales markets, has been revised several times, mainly in order to improve the trading system. However, there is still a huge gap between the reality and law when it comes to the trading system of the fishery products wholesale market. This study aims to analyze the problems of the trading system of the fishery products wholesale market and to suggest ways to make improvement. The main problem facing the trading system of the fishery products wholesale market is sales on consignment by intermediate wholesalers, and this paper suggests two alternatives to solve the problem. First, intermediate wholesaler can be converted to market wholesalers, but it also entails other problems. The market wholesaler system has never been successfully adopted in the agricultural and fishery products wholesale market, and it is not clear which system is better between the wholesale market corporation and the market wholesaler system. Second, sales on consignment by intermediate wholesalers can be adopted with a positive view toward it. Negotiation transaction can be carried out for sales on consignment as a transaction method under the current Act on Distribution and Price Stabilization of Agricultural and Fisheries Products. However, since the act cannot provide a solution for listing, it is necessary to introduce Japan's negotiated transaction in advance system as a negotiation transaction method.
Electricity Market in Korea can't provide locational price signal through energy price because energy market is CBP(Cost Based Pool) using uniform price. Generators don't want to locate in a densely populated load area(like the metropolitan area). Because they are paid more fixed cost in metropolitan area. This situation has loss and congestion occurred in power system. However energy market without price signal can't lead generator to the metropolitan. So, market participants should be provided price signal through the transmission price instead of energy price. This paper proposes transmission pricing method considering reliability cost in order to offer price signal. Also, it proposes the method to allocate the transmission cost to each transmission line user through a fair and a reasonable manner. The transmission price is decided by the reliability value of each line. If a transmission line of high reliability value is broke, users using that line will get a loss and a discomfort. So, it is fair that users using a transmission line of high reliability value pay more than the other users. Also, it is reasonable that a transmission line owner get paid more form users using that line.
Congestion occurs whenever users interfere with each other, while competing for scarce resources. In a congested market, such as a telecommunication service market, users of telecommunication services incur costs in using the service in addition to the price. The user's own time costs involved in learning to use the service, waiting for the service, and making use of the service are typically greater than the price of telecommunication services. A market equilibrium analysis is performed in which a method for user demand aggregation is developed. The effects of price changes on user demands and market demands for congested services are examined. It is found that total market demands may increase as the price for less-congested services increase under certain demand conditions. This suggests that a nonuniform pricing scheme for a congested service may improve the utilization of the congested system. The sign of price cross-elasticity for congested services is show to vary with demand conditions. A possible complementary property of congested services is found and the implication of such a property is discussed. It is argued that such a complementary property may lead to a cross subsidy in a market with congestion. Finally, comparisons between uniform pricing and nonuniform pricing policies are made. A specific numerical example is given to show that a nonuniform pricing policy may be Pareto superior to a uniform pricing policy.
This paper proposes Direct Load Control(DLC) operation scheme using a bidding system and the methodology to value proper quantity decided by the DLC program, which is a kind of resources for stabilization of electricity market price during peak times by managing consumer electricity demand. Since DLC program in Korea is based on the contract with the customers participating in this program, it is difficult to anticipate voluntary participation. That is, incentive for participants in DLC program is insufficient. To cope with this point, it is necessary to develop a new market mechanism and market compatible operation scheme for DLC programs. DLC market mechanism is deemed to be equipped with iterative bidding system, independent operation from energy market, and interactive with bidding information on energy market. With this market mechanism, it is important to find the optimal operation point of DLC allowing for the factors of stabilizing the electricity market price and compensating DLC implementation. This paper focuses on the mathematical approaches for the bid-based DLC operation scheme and examines several scenarios for the following technical justifications: 1) stabilization of electricity market price during peak times, 2) elasticity of demand.
본 연구에서는 담합의 경제분석에서 고려해야 할 쟁점들을 논의한 후, 이러한 쟁점들을 반영한 방법론을 특정 수송용 연료시장의 분석에 적용하였다. 가상 경쟁가격과 과잉징수를 산정하는 5가지 방법 중 표준시장비교방법에 기반한 회귀분석방법이 최선이다. 수송용 연료시장에서와 같이 국제가격과 환율이 국내가격에 영향을 미치는 제품의 실거래가격을 분석하는 경우 논리에 부합하면서 유연한 함수형태는 로그-로그 함수형태이다. 경제분석의 대상이 되는 자료가 시계열자료인 경우에 ARDL 모형을 시장별 회귀분석모형의 근간으로 채택하는 것이 필요하며, 표준시장비교방법에 기반한 회귀분석방법에서는 구성 회귀식 간에 모수제약이 포함된 ARDL 회귀식 체계를 구축하고 system FGLS로 추정하여야 한다. Friedman 동질성 검정을 통하여 표준시장 여부를 판별할 수 있다. 통계적 유의성은 불확실성 하에서 입증하고자 하는 명제를 확립하는데 요구되는 최소의 요건이다. 담합관련 소송의 경제분석에서는 민감도 분석은 그다지 유용성이 없으며, 최적모형 선별과정이 더 중요한 절차이다. 위 방법론을 특정 수송용 연료시장의 분석에 적용한 결과, 해당 시장에서는 담합에 기인하는 손해액이 없다는 귀무가설을 기각할 수 없었다.
General drug prices involve three stages: shipment stage, wholesaler stage and retail stage. Policies on drug price differ from country to country. Shipment stage prices are tightly regulated in countries like France and Netherlands. They are free in only a minority of advanced countries, even if these include some major players such as the US, Germany and, in a very limited sense, Japan. The situation in the UK is very complex with a semi-free system, where drug companies are free to set their own prices but cannot exceed a predetermined profit ceiling. Mark-up at both wholesaler and retail stages is formally admitted in most countries observed. Apart from the general drug prices, reimbursement price of insured drugs has been major policy concerns. Most countries reviewed in this study has exerted some control over reimbursement prices, but differ both in the way how and in the extent to which prices are admitted or fixed. Price fixing has been used in France and Japan. Some countries have transformed their system over time, particularly to move to reference pricing in the last decade. This mechanism has empowered the customer, and improved price competition on the market. Referring to the drug price policies in the advanced countries, this study makes some suggestions for the redirection of Korean price policy for reimbursement drug in health insurance as follows: to match appropriate policy tools to each policy goal; to maximize market mechanism through effective reimbursement price fixing which admits mark-ups in wholesaler and retail prices; to introduce reference pricing system in order to redirect patient's demand with a financial incentive to choose the best-priced drugs and to save the finance of health insurance; and to strengthen surveillance and monitoring mechanism in the drug market.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.