• Title/Summary/Keyword: maintenance type

Search Result 1,795, Processing Time 0.04 seconds

Adaptive Maintenance Using Machine Condition Diagnosis Technique (설비진단기술를 활용한 적응보전)

  • 송원섭;강인선
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.17 no.30
    • /
    • pp.73-79
    • /
    • 1994
  • This paper propose Adaptive Maintenance as a new type of maintenance for machine failures which are unpredictable. A purpose of adpative maintenance is to decrease inconsistency. In order to pick up some of problems the traditional maintenance policy, We discussed Time Based Maintenance(TBM) and Condition Based Maintenance(CBM) with Bath-Tub Curve. By using Machine Condition Diagnosis Technique (CDT), Monitored condition maintenance deals with the dynamic decision making for diagnosis procedures at maintenance and caution level. Adaptive Maintenance is a powerful tool for Total Production Maintenance(TPM).

  • PDF

The Study of Control Algorithm for Stand alone PV System (독립헝 태양광 발전 시스템의 제어 알고리즘에 관한 연구)

  • Kim, Tae-Yeop;Jung, Maeng-Hwa;Goh, Gweon-Seong
    • Proceedings of the KIEE Conference
    • /
    • 2002.07b
    • /
    • pp.1382-1384
    • /
    • 2002
  • The flooded type battery is used for solar lighting system. Because the characteristic of flooded type battery is the short life time, the maintenance cost is high. So the using flooded type battery in this system is inappropriate. The valve regulated lead acid batter.(VRLA) is the maintenance free and cycle service purpose. This paper presents the development of control system and monitoring system to applied VRLA battery for maintenance free and long life time in system.

  • PDF

The Effect of Job Stress Responses on Human Error (직무스트레스 반응이 인적과오에 미치는 효과)

  • An, Gwan-Yeong;Son, Yong-Seung
    • Proceedings of the Safety Management and Science Conference
    • /
    • 2011.11a
    • /
    • pp.123-133
    • /
    • 2011
  • This paper reviewed the relationship between job stress and human error, and the moderating effect of age and maintenance type on the relationship between job stress and human error in maintenance personnel. Based on the responses from 450 maintenance personnels, the results of multiple regression analysis showed that physiological and psychological stress responses have positively related with human error. In moderating effect test, age appeared to impact on the relationship between physiological/behavioral stress and human error.

  • PDF

Maintenance Scheduling using a Genetic Algorithm with New Crossover Operators (유전알고리즘을 이용한 발전계통의 보수계획 수립)

  • Jung, Jung-Won;Kim, Jung-Ik
    • The Transactions of the Korean Institute of Electrical Engineers A
    • /
    • v.48 no.5
    • /
    • pp.545-552
    • /
    • 1999
  • The Maintenance scheduling is one of the mid-term scheduling problems systems. There have been many methods for this problem, but there is no effective way to treat all the generators simultaneously. In this paper, we apply a genetic algorithm(GA) to the maintenance scheduling problem. We proposed new crossover operators(BOX type crossover) to improve searching ability of GA. Satisfactory results are obtained by GA with the proposed corssover operators.

  • PDF

Development of evaluation method for the railroad track life cycle considering environmental effect factors (환경영향인자를 고려한 궤도수명산정 기법 개발)

  • Kong, Jung-Sik;Jeong, Min-Chul;Kim, Jung-Hoon;Lee, Won-Woo
    • Proceedings of the KSR Conference
    • /
    • 2011.05a
    • /
    • pp.167-172
    • /
    • 2011
  • Generally, the analysis of railroad wear data is most effective method for the efficient railway maintenance. The wear of railway track affects loss of rough ride, noise or vibration of train and traveling safety. Moreover as the track is worn away, this promotes destruction of structural mechanism of rail track which can bring about increasing of rail track maintenance cost drastically. For this reason, it is very important and interested research subject to design railway track structure and to analyse train movement mechanism based on systematic analysis of the reasons causing rail wear possible in real field. In this research, for the efficient maintenance, Life Cycle Performance of rail track and maintenance characteristics are computed considering some track components such as track type, contracting type, sleeper type and roadbed type. Time - Wear probabilistic distribution relationship as well as multiple regression analysis based on time, curvature and wear data are computed to predict the service life remainder of railway track and to be adapted to safety assessment.

  • PDF

A Study on the Varistor Maintenance program in urban rail chopper type subway train (도시철도 쵸파형 전동차 배리스터(varistor) 유지보수 방안 연구)

  • Woo, Jong-Hyuk;Lee, Jong-In;Lee, Yong-Gi;Song, Jeong-Hun
    • Proceedings of the KSR Conference
    • /
    • 2011.05a
    • /
    • pp.1647-1653
    • /
    • 2011
  • In the case of an urban rail chopper type subway train, varistors have been installed for protecting usual electronic equipments, semiconductor devices(diodes, transistors, thyrister, etc.) communications, measuring, control device and absorbing opening & closing surge of electromagnetic valve. These varistors were steadily reduced dielectric strength as becoming superannuated. Thus there is a problem that reacts more sensitive at the same surge in the general control operation. On existing maintenance, there is not specific standard to replace superannuated varistor. So when maintaining chopper type subway train, all varistors or old varistors that workers checked a discoloration & crack with the naked eye and noticed degradation smell by deterioration are replaced. This study suggests detail standards for judgement that varistors are good or bad chopper type subway train, and it draw a efficient maintenance which efficient maintenance can check more easy the degradation properties variation.

  • PDF

A Study on the Activation Plan of Village Maintenance for Public Housing Project of Local Small and Medium-Sized Cities (지방 중소도시 마을정비형 공공주택사업 활성화 방안 연구)

  • Kang, Dong-Ryeol;Ahn, Jung-Geun;Bae, Min-Cheul
    • Journal of Korean Society of Rural Planning
    • /
    • v.28 no.2
    • /
    • pp.21-32
    • /
    • 2022
  • Since the village maintenance type public housing project was introduced in 2015, the resident needs for regional revitalization and pleasant living conditions are not being met due to the poor performance of the public housing complexes that reflect the surrounding area maintenance plan (village plan) and regional characteristics. The purpose of this study is to suggest a plan to revitalize the village maintenance type public housing project in consideration of regional characteristics as a result of analyzing the needs of local residents through the problems of the village maintenance type public housing project being promoted so far and resident satisfaction. As a result of the analysis based on the public housing project implementation status analysis and resident satisfaction, the plans to activate the village maintenance type public housing project are as follows. First, in order to secure the effectiveness of the village plan, it is desirable to promote the public housing project and the village plan at the same time. It is necessary to secure a budget according to the selection of public offering projects in the village plan, such as promoting public housing projects without setbacks by prioritizing land purchases for public housing sites and establishing specialized strategies considering regional characteristics. Second, a public housing project that responds to local demand is required. The evaluation factors such as continuous promotion of the urban architecture integration plan and strengthening of regional linkage plans such as specialization of regionally tailored designs should be supplemented so that regional resources and village plans are linked with the public housing specialization plan. Third, surrounding area maintenance plan (village plan) should be secured by the strengthen of the legal status or establishing related provisions. It is also necessary to promote system improvement for area maintenance plan (village plan) when selecting a publicly funded public project.

A Study on the Deterioration Patterns of Building Components in the Rental Apartment Housing (임대공동주택 구성재의 열화도 패턴에 관한 연구)

  • Lee Kang-Hee
    • Journal of the Korean housing association
    • /
    • v.17 no.4
    • /
    • pp.65-72
    • /
    • 2006
  • Most of buildings have been deteriorated with time-elapse by reflection of the building location, material, environmental circumstances and so on. The performance would go down and be demolished if anything could not be done after constructed. The maintenance should be required to preserve a decent living condition or improve a inferior condition by various plans and practices. The maintenance plan needs various data such as a repair scope, a repair time, a forecasted cost, a plan of management and so forth. Among the above required data for planning the maintenance, the deterioration characteristics of the building components would be first analyzed. The deterioration pattern would be a key role to affect and make a maintenance plan. In this paper, it aimed at classifying the deterioration patterns of building components. A deterioration pattern would be analyzed between the cumulative repair cost and time-elapse and modeled with these relations. A deterioration patterns are classified into 4 types-a accelerated type, a straight type, a temporary type and a slowly type. As a result of this research, a accelerated type includes window, window frame, general paintings, general water proofing in building components. A straight type includes the lacquer paintings, furnishings in building components and water supply pipe, boiler, sanitaries in mechanical facilities and lighting in electric facilities. Based on these research results, further study should be conducted to include any other components and an estimating model.

Maintenance, Repair and Rehabilitation (MR&R) Practice for Concrete Bridge Decks

  • Hong, Tae Hoon
    • Architectural research
    • /
    • v.7 no.2
    • /
    • pp.81-89
    • /
    • 2005
  • Over the years, existing bridges have had various degrees of maintenance to extend the service life. As the existing bridges continue to deteriorate, however, each Department of Transportation (DOT) of the United States of America faces increasing demands on the limited funds available for bridge maintenance. Therefore, it is very important for State Department of Transportations to establish Maintenance, Repair, and Rehabilitation (MR&R) strategies for bridge structures such that funds get allocated for appropriate maintenance over the service life. This paper identifies the state-of-art and the state-of-practice of MR&R actions and the use of MR&R strategies in concrete bridge decks. In addition, a questionnaire survey was conducted to identify the type and timing for MR&R actions as well as existing MR&R strategies taken in concrete bridge deck by each DOT. This paper also presents the results of the survey.

A Production and Preventive Maintenance Policy with Two Types of Failures (두 가지 고장형태를 고려한 생산 및 예방보전 정책)

  • 김호균;조형수
    • Journal of Korean Society for Quality Management
    • /
    • v.30 no.3
    • /
    • pp.53-65
    • /
    • 2002
  • This paper studies an economic manufacturing quantity (EMQ) model with two types of failures and planned preventive maintenance of the production facility. One is a type I (major) failure which should be corrected by a failure maintenance and the other is a type H (minor) failure which can be minimally repaired without interrupting the production run. The objective is to determine the lot size and preventive replacement policy minimizing the long-run expected cost per unit time. We consider a control policy with a constant production lot size and preventive maintenance after completing n production runs. It is assumed that both preventive and failure maintenance times are random and the demand arriving during a stock-out period is lost. An expression for the expected cost per unit time is obtained in the general case. A special case is discussed and numerical results are provided.