• Title/Summary/Keyword: maintenance projects

Search Result 452, Processing Time 0.029 seconds

The Performance Analysis of Korean NGOs' Tree Plantation Projects in Mongolia

  • Kang, Min-Kyung;Park, Dong-Kyun;Chun, Young-Woo
    • Journal of Korean Society of Forest Science
    • /
    • v.99 no.5
    • /
    • pp.655-662
    • /
    • 2010
  • Desertification has been expanding with a remarkable speed across the Northeast Asia. Desertification in Northeast Asia significantly influences Korea's economy and environmental health conditions in recent years. For these reasons, a number of non-governmental organizations (NGOs) in Korea have carried out the reforestation projects to combat desertification in China and Mongolia. Several tree plantation projects were implemented in Mongolia and China. The objective of this study was to analyze and evaluate the performance of tree plantation aid projects carried out by Korean NGOs in Mongolia. The performance of tree plantation projects was examined through effectiveness, efficiency, equity and responsiveness of those projects. The performance was analyzed with the survival rate of planted trees and planting cost, the recognitions of Mongolian people. The analysis of the performance showed that the tree plantation cooperation projects carried out by Korean NGOs in Mongolia had comparatively high performance from a larger point of view. Especially, effectiveness and responsiveness of their projects were highly marked in spite of all the difficulties of carrying out the tree plantation. Such a high effectiveness represented the relatively higher survival rates of trees and Mongolian's positive recognition of plantation projects. Furthermore, the responsiveness also turned out to be high with a great satisfaction of the Mongolian people for plantation projects conducted by the Korean NGOs. Survey results indicated that the efficiency and equity of the projects would be increased by promoting the cooperation projects for tree planting throughout Mongolia with reinforcing infrastructures. By comparison between Korean NGOs and Mongolian Government plantation projects, confirmed the importance of sustained financial support and maintenance activities in the plantation sites.

A PROFIRABILITY MODEL BASED ON PRIMARY FACTOR ANALYSIS IN THE EARLY PHASE OF HOUSING REDEVELOPMENT PROJECTS

  • Kyeong-Hwan Ahn;U-Yeong Gim;Jong-Sik Lee;Won Kwon;Jae-Youl Chun
    • International conference on construction engineering and project management
    • /
    • 2013.01a
    • /
    • pp.497-501
    • /
    • 2013
  • An important decision-making element for the success of housing redevelopment projects is a prediction of the profitability of redevelopment. Risk factors influencing profitability were deduced through a review of the literature about profitability and a risk analysis developed by a survey of maintenance projects. In addition, a profitability prediction depending on the analysis of risk factors is necessary to judge the business feasibility of a project in the planning stages. A profitability prediction model of management and disposal method, which is calculated by proportional rate and which helps estimate contributions to profitability, is proposed to prevent difficulties in business development. The proposed model has the potential to prevent interruptions, reduce the length of projects, generate cost savings, and enable rational decision-making during the project period by allowing a judgment of profitability at the planning stage.

  • PDF

A Study on Interactive Centered Apartment Maintenance System Based on BIM (BIM기반 상호적 유지관리 시스템 개념 제안)

  • Song, A-Reum;Yun, Seok-Heon
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2015.05a
    • /
    • pp.232-233
    • /
    • 2015
  • The maintenance management in buildings has got more important by the increasing complexity of building sizes and use. Nowadays an expectation and a possibility of BIM technology become accepted as a new construction management method, therefore many studies and legal systems of it are being suggested actively. Although orders for BIM projects are supposed to be increasing, at present the BIM information accumulated from planning and design still doesn't have its continuity at the maintenance step after completion of construction in terms of LCC. Therefore according to bim information, we set a goal of developing apartment maintenance system which is able to maintain by user and administrator viewpoint.

  • PDF

A Study on User Centered Apartment Maintenance System Based on BIM (공동주택 이용자 중심의 BIM기반 유지관리 개선제안)

  • Song, A-Reum;Yun, Seok-Heon
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2013.11a
    • /
    • pp.240-241
    • /
    • 2013
  • The maintenance management in buildings has got more important by the increasing complexity of building sizes and use. Nowadays an expectation and a possibility of BIM technology become accepted as a new construction management method, therefore many studies and legal systems of it are being suggested actively. Although orders for BIM projects are supposed to be increasing, at present the BIM information accumulated from planning and design still doesn't have its continuity at the maintenance step after completion of construction in terms of LCC. Therefore according to bim information, we set a goal of developing apartment maintenance system which is able to maintain by user viewpoint.

  • PDF

Estimating software development cost using machine-learning approach (학습이론을 이용한 소프트웨어 개발비 예측 모형)

  • Park, Chan-Kyoo
    • 한국IT서비스학회:학술대회논문집
    • /
    • 2005.11a
    • /
    • pp.345-355
    • /
    • 2005
  • As the portion of information systems(IS) budget to the total government budget becomes greater, the cost estimation of IS development and maintenance projects is recognized as one of the most important problems to be resolved for quantitative and efficient management of IS budget. The primary concern in the cost estimation of IS projects is to estimate software development cost. In this paper, we propose a new method to estimate software cost using support vector regression(SVR), which has attracted considerable attention because of its good performance and theoretical clearness. The paper is the first study which apply SVR to software cost estimation.

  • PDF

A Study on the Plan to Activate Responsible CM through Expert Consciousness Survey in Urban Improvement Projects (Reconstruction·Redevelopment) (도시정비사업(재건축·재개발)에서 전문가 의식조사를 통한 책임형 CM 활성화 방안에 관한 연구)

  • Lee, YunHong
    • Korean Journal of Construction Engineering and Management
    • /
    • v.21 no.6
    • /
    • pp.56-65
    • /
    • 2020
  • Urban renovation projects (reconstruction and redevelopment) have a longer licensing period than general housing projects, and many consultations with the licensing authorities require expertise. Most of the members of the union do not have basic knowledge of the maintenance business, so they have a lot of authority to promote smooth business Is entrusted to the union leader. However, contrary to the original purpose entrusted by the members, it is easy to find a case where the business is suspended because the union leader is exposed to corruption for the private interests of the union, and the members' disputes could not be resolved. In order to overcome this risk, the problem of the maintenance project was found through a questionnaire survey composed of practical experts, and a solution was presented through the KCSI evaluation model. This study mentioned the necessity of a responsible CM that can make independent business decisions without interference from the union, rather than a management-type CM limited to the cooperative's work assistance. In order to promote the construction industry's national role, it was necessary to revitalize responsible CM, so six practical alternatives were proposed.

A Study on the Post-management and Improvement of Ecosystem Conservation Fund Return Projects (생태계보전협력금 반환사업 사후관리 실태와 개선 방안)

  • Lee, Ji Hyun;Sung, Hyun Chan
    • Journal of the Korean Society of Environmental Restoration Technology
    • /
    • v.16 no.2
    • /
    • pp.1-12
    • /
    • 2013
  • This study reviews the current conditions of the completed 'Ecosystem Conservation Fund Return Project' sites to suggest management methods for their conservation and sustainability. For the scope of the study, five microsites of completed return projects in Seoul were selected and their project planning documents were reviewed to help with site surveying and analysis. To increase the accuracy of the site surveying and analysis, and to evaluate the management problems from different perspectives, the site managers were interviewed in-depth. The experts were surveyed as well to develop a realistic and practical improvement method. The survey results helped to categorize the post-management problems, and separate improvement methods were suggested for each category. First, the post-management guidelines are proposed for the ecosystem-based environment/ecosystem environment, user management, and monitoring. These guidelines will increase the expertise and practicality of the management principles. Second, the regulations for the participation of expert management enterprises and the development of separate monitoring or maintenance management team are suggested. These regulations will improve the participation of experts and consistency of management systems. Third, the post monitoring or maintenance management during the year after the project completion should be set as a separate project to secure budget. Furthermore, policies and/or institutions should be established to set a portion of ecosystem conservation return fund or a grant for post monitoring and maintenance management. Forth, as a way of adaptive management, at least more than three years of post-management should be evaluated under detailed categories and vigorous standard to improve the institutional operation for 'Ecosystem Conservation Fund Return Projects'.

The Study on the Analysis of Elemental Maintenance Costs for Educational Facilities

  • Hyun-Wook Kang;Seung-Wook Lee;Sung- Ryul Bae;Byoung-Jun Min;Moon-Sun Park;Yong-Su Kim
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.1254-1259
    • /
    • 2009
  • The purpose of this study is to analyze elemental maintenance costs for educational buildings. The adapted research method selected three school buildings in Seoul as BTL projects. On the basis of the selected case, the study suggested a model to establish a system for each parts and to estimate analyzed maintenance costs through that system. According to the analysis, the study proposed a partial maintenance costs standard and analyzed proper maintenance costs. The results of this study are as follows 1) The system is divided into 8 large-groups and 24 small-groups for the analysis elemental maintenance costs. 2) The average rations followed by analysis of partial maintenance costs of the three school buildings are as followings, the total maintenance costs are analyzed 3,992 million won and each part of average rations is exterior of building 10.9%, interior of building 41.58%, electricity & fire fighting facility 14.22%, water supply & healthy facility 11.39%, heating & water supply facility 12.93%, landscape 6.3%, civil engineering works 2.69%.

  • PDF

The Linkage Strategies Between Productivity Metrics and Financial Accounting Metrics in TPM and PAC Activities (TPM, PAC 활동에서 생산성지표와 재무회계 지표의 연계방안 전략)

  • Choi, Sungwoon
    • Journal of the Korea Safety Management & Science
    • /
    • v.15 no.3
    • /
    • pp.151-161
    • /
    • 2013
  • This paper proposes a strategic model of linkage between productivity metrics and financial accounting metrics to properly evaluate the financial effect of TPM activities and the business performance. This linkage strategy provides a connection tool for clear communication between factory-level and headquarters that the metrics proposed by this paper ultimately improves a quality of support from the management by receiving the factors required for productivity activities in the practical field. This factor includes such as equipment, raw materials and labors. Here, we propose that chain reaction models using break down structure of productivity metrics and financial metrics enhance the knowledge sharing of KPI (Key Performance Indicator) which generally tend to create oversimplified communication between management in headquarters and employees in the practical fields. The productivity metrics include OEE(Overall Equipment Effectiveness) of TPM (Total Productive Maintenance), OLE (Overall Labor Effectiveness) of PAC(Performance and Analysis and Control) activities, and OYE (Overall Yield Effectiveness) of TMM(Total Material Management) activities. The financial accounting metrics include ROE(Return on Equity), ROA(Return on Asset), and AVR(Added-Value Rate). The suggested chain reaction model selects the financial metrics as initial stage and branch down until final stage of productivity metrics. When demand exceeds supply, an ideal speed rate, the lean OEE strategy can be initially applied to reduce the gap between the demand and supply, then apply variable costing to estimate correct amount of operating profit. In addition, the paper presents a new type of model for linkage between financial accounting metrics including CAPEX(Capital Expenditure), OPEX(Operating Expenditure), EVA(Economic Added Value), DCL(Degree of Combined Leverage), and TPM productivity activities including AM(Autonomous Maintenance), PM(Preventive Maintenance), MP(Maintenance Prevention) and QM(Quality Maintenance). In order to support the evidence of proposed linkage strategy, a case analysis on 52 projects from national TPM contest from 2011 to 2012 is analyzed. The case presents the classification of CAPEX and OPEX activities from TPM, and proposes the correct implementation of financial effect for TPM projects.

A Study on the Estimation of Software Development Cost of IT Projects in Public Sector (공공부문 정보화사업의 소프트웨어 개발비용 예측에 관한 연구)

  • 박찬규;구자환;김성희;신수정;송병선
    • Korean Management Science Review
    • /
    • v.19 no.2
    • /
    • pp.191-204
    • /
    • 2002
  • As the portion of information systems (IS) budget to the total government budget becomes greater, the cost estimation of IS development and maintenance projects is recognized as one of the most important problems to be resolved for scientific and efficient management of IS budget. Since IS budget makes much effect on the delivery time, quality and productivity of IS projects, the exact cost estimation is also necessary for the successful accomplishment of IS projects. The primary concern in the cost estimation of IS projects is software cost estimation, which requires the measurement of the size of softwares. There are two methods for sizing software : line-of-code approach, function point model. In this paper, we propose a function-point-based model for estimating software cost. The proposed model is derived by collecting about fifty domestic IT projects in public sector and analyzing their relationship between cost drivers and development effort. Since the proposed model is developed by simplifying the function point model that can be used only when detailed user requirements are specified, it can be also applied at project planning and budgeting phase.