• Title/Summary/Keyword: lunar

Search Result 533, Processing Time 0.022 seconds

Lunar ascent and orbit injection via locally-flat near-optimal guidance and nonlinear reduced-attitude control

  • Mauro, Pontani
    • Advances in aircraft and spacecraft science
    • /
    • v.9 no.5
    • /
    • pp.433-447
    • /
    • 2022
  • This work deals with an explicit guidance and control architecture for autonomous lunar ascent and orbit injection, i.e., the locally-flat near-optimal guidance, accompanied by nonlinear reduced-attitude control. This is a new explicit guidance scheme, based on the local projection of the position and velocity variables, in conjunction with the real-time solution of the associated minimum-time problem. A recently-introduced quaternion-based reduced-attitude control algorithm, which enjoys quasi-global stability properties, is employed to drive the longitudinal axis of the ascent vehicle toward the desired direction. Actuation, based on thrust vectoring, is modeled as well. Extensive Monte Carlo simulations prove the effectiveness of the guidance, control, and actuation architecture proposed in this study for precise lunar orbit insertion, in the presence of nonnominal flight conditions.

Preparation of Contingency Trajectory Operation for the Korea Pathfinder Lunar Orbiter

  • Jun Bang;SeungBum Hong;Jonghee Bae;Young-Joo Song;Donghun Lee
    • Journal of Astronomy and Space Sciences
    • /
    • v.40 no.4
    • /
    • pp.217-224
    • /
    • 2023
  • The Korea Pathfinder Lunar Orbiter (KPLO), also known as Danuri, successfully entered its mission orbit on December 27, 2022 (UTC), and is currently performing its mission smoothly. To mitigate potential contingencies during the flight and to navigate the spacecraft into the desired lunar orbit, the KPLO flight dynamics (FD) team analyzed major trajectory-related contingencies that could lead to the violation of mission requirements and prepared operational procedures from the perspective of trajectory and FD. This paper presents the process of preparing contingency trajectory operations for the KPLO, including the identification of trajectory contingencies, prioritization results, and the development of recovery plans and operational procedures. The prepared plans were successfully applied to address minor contingencies encountered during actual operations. The results of this study will provide valuable insights to FD engineers preparing for space exploration mission operations.

A study of utilization pattern on emergency patients in Gwangju Emergency Medical Information Center during the Lunar New Year and Chuseok holidays (명절 연휴기간 내 광주응급의료정보센터 이용현황 분석 - 설과 추석을 중심으로 -)

  • Kim, Mi-Seon
    • The Korean Journal of Emergency Medical Services
    • /
    • v.13 no.1
    • /
    • pp.61-72
    • /
    • 2009
  • Purpose : This study was conducted to understand the unforeseen phone calls placed through the 1339 emergency medical communication system by residents of the Gwangju/Jeonnam area during the Lunar New Year and Chuseok holidays. Methods : A descriptive research method was implemented using SPSS to analyze 9,047 reported and received consultation phone calls made during the 2008 Lunar New Year holiday (February 6-10) and the 2008 Chuseok holiday (September 13-15) for frequency and percentages. Results : Among the general characteristics of subjects during the Lunar New Year and Chuseok holidays, an examination of the distribution for gender showed more men than women and the distribution for age showed most subjects were thirties, followed by forties, and finally under ten years of age. According to the status of situational calls during the Lunar New Year holiday most were used for in the following order : providing resource information, misdialing and prank calls, and additional consultations. According to the status of situational calls during the Chuseok holiday most were used for in the following order : providing resource information, additional consultations, misdialing and prank calls. According to region most came from Gwangju Metropolitan City Bukgu, followed by Yeosu, Suncheon, and Mokpo in Jeonnam. According to callers, the majority were non-medical persons. According to time most were made between 9:01 and 12:00, while the fewest were made during 3:01 and 6:00. According to treatment department most were made in the following order : internal medicine, pharmacy, and pediatrics. Most medical resource information provided regarded areas outside the callers location. Conclusion : Emergency medical technician will play a central role in the emergency medical information system in the near future.

  • PDF

Sun Sensor Aided Multiposition Alignment of Lunar Exploration Rover (달 탐사 로버의 태양 센서 보조 다중위치 정렬)

  • Cha, Jaehyuck;Heo, Sejong;Park, Chan-Gook
    • Journal of the Korean Society for Aeronautical & Space Sciences
    • /
    • v.45 no.10
    • /
    • pp.836-843
    • /
    • 2017
  • In lunar exploration, the necessity of utilizing rover is verified by the examples of the Soviet Union and China and the similar Mars missions of the United States. In order to achieve the successful management of a lunar rover, a high precision navigation technique is required, and accordingly, high precision initial alignment is essential. Even though it is general to perform initial alignment in a steady state, a multiposition alignment technique is applied when high performance is needed. On the lunar surface, however, the performance of initial alignment decreases from that on Earth, and it cannot be improved by applying multiposition alignment method owing to certain constraints of lunar environment. In this paper, a sun sensor aided multiposition alignment technique is proposed. The measurement model for a sun vector is established, and its observability analysis is performed. The performance of the proposed algorithm is verified through computer simulations, and the results show the estimation performance is improved dramatically.

Exploring 6th Graders Learning Progression for Lunar Phase Change: Focusing on Astronomical Systems Thinking (달의 위상 변화에 대한 초등학교 6학년 학생들의 학습 발달과정 탐색: 천문학적 시스템 사고를 중심으로)

  • Oh, Hyunseok;Lee, Kiyoung
    • Journal of the Korean earth science society
    • /
    • v.39 no.1
    • /
    • pp.103-116
    • /
    • 2018
  • The purpose of this study was to explore $6^{th}$ graders learning progression for lunar phase change focusing astronomical systems thinking. By analyzing the results of previous studies, we developed the constructed-response items, set up the hypothetical learning progressions, and developed the item analysis framework based on the hypothetical learning progressions. Before and after the instruction on the lunar phase change, we collected test data using the constructed-response items. The results of the assessment were used to validate the hypothetical learning progression. Through this, we were able to explore the learning progression of the earth-moon system in a bottom-up. As a result of the study, elementary students seemed to have difficulty in the transformation between the earth-based perspective and the space-based perspective. In addition, based on the elementary school students' learning progression on lunar phase change, we concluded that the concept of the lunar phase change was a bit difficult for elementary students to learn in elementary science curriculum.

Investigation of Structural Reliability on Solder Joint According to Heater Set-point of the Lunar Lander (달 착륙선의 히터 작동온도 설정에 따른 솔더 접합부의 구조적 신뢰성 분석)

  • Jeon, Young-Hyeon;Park, Tae-Yong;Lee, Jang-Joon;Kim, Jung-Hoon;Oh, Hyun-Ung
    • Journal of the Korean Society for Aeronautical & Space Sciences
    • /
    • v.46 no.2
    • /
    • pp.167-174
    • /
    • 2018
  • The heater is applied to the lunar lander for securing its survivability under severe lunar thermal environment during 14 days of night time. For this, the heater on/off set-points shall be determined to minimize the power consumption due to the limited power generation of lunar lander during night time. In addition, the temperature changes of the lander according to the heater set-point is also an important factor because it is related to thermo-mechanical reliability on solder joint of on-board electronics. In this study, we investigated thermo-mechanical reliability on solder joint according to the heater set-point by using commercial reliability and a life prediction tool of Sherlock based on the thermal analysis results of lunar lander that is a year of the mission lifetime.

Design of a Structural Model for Korean Lunar Explorer (한국형 달탐사선 구조모델 설계)

  • Son, Taek-Joon;Na, Kyung-Su;Kim, Jong-Woo;Lim, Jae Hyuk;Kim, Kyung-Won
    • Journal of the Korean Society for Aeronautical & Space Sciences
    • /
    • v.41 no.5
    • /
    • pp.366-372
    • /
    • 2013
  • Korean lunar explorer will be launched by korean launcher KSLV-2 in the 2020s in accordance with national space development strategy. Korean lunar explorer is composed of two unmanned orbiter and lander and should be developed as small size and light weight within 550kg of launch mass due to launcher's loading capability. A structure of lunar explorer is required to have sufficient stiffness and strength under launch and operational environment as well as to accommodate mission equipment. This paper describes the result of a preliminary study on structural model design for korean lunar explorer.

Analysis of Optimal Landing Trajectory in Attitude Angular Velocity Influence at Powered Descent Phase of Robotic Lunar Lander (무인 달착륙선의 동력하강단계에서 자세각속도 영향에 따른 최적화 착륙궤적 분석)

  • Park, Jae-ik;Rew, Dong-Young
    • Journal of the Korean Society for Aeronautical & Space Sciences
    • /
    • v.46 no.5
    • /
    • pp.402-409
    • /
    • 2018
  • In this paper, we propose a lunar landing scenario of a robotic lunar landing mission and implements an optimal landing trajectory at the powered descent phase based on the proposed scenario. The change of attitude of the lunar lander in the power descent phase affects not only the amount of fuel used but also sensor operation of image based navigation. Therefore, the attitude angular velocity is included in the cost function of the optimal control problem to minimize the unnecessary attitude change when the optimal landing trajectory generates at powered descent phase of the lunar landing. The influence of the change of attitude angular velocity on the optimal landing trajectory are analyzed by adjusting the weight of the attitude angular velocity. Based on the results, we suggest the proper weight to generate the optimal landing trajectory in order to minimize the influence of the attitude angular velocity.

Early Phase Contingency Trajectory Design for the Failure of the First Lunar Orbit Insertion Maneuver: Direct Recovery Options

  • Song, Young-Joo;Bae, Jonghee;Kim, Young-Rok;Kim, Bang-Yeop
    • Journal of Astronomy and Space Sciences
    • /
    • v.34 no.4
    • /
    • pp.331-342
    • /
    • 2017
  • To ensure the successful launch of the Korea pathfinder lunar orbiter (KPLO) mission, the Korea Aerospace Research Institute (KARI) is now performing extensive trajectory design and analysis studies. From the trajectory design perspective, it is crucial to prepare contingency trajectory options for the failure of the first lunar brake or the failure of the first lunar orbit insertion (LOI) maneuver. As part of the early phase trajectory design and analysis activities, the required time of flight (TOF) and associated delta-V magnitudes for each recovery maneuver (RM) to recover the KPLO mission trajectory are analyzed. There are two typical trajectory recovery options, direct recovery and low energy recovery. The current work is focused on the direct recovery option. Results indicate that a quicker execution of the first RM after the failure of the first LOI plays a significant role in saving the magnitudes of the RMs. Under the conditions of the extremely tight delta-V budget that is currently allocated for the KPLO mission, it is found that the recovery of the KPLO without altering the originally planned mission orbit (a 100 km circular orbit) cannot be achieved via direct recovery options. However, feasible recovery options are suggested within the boundaries of the currently planned delta-V budget. By changing the shape and orientation of the recovered final mission orbit, it is expected that the KPLO mission may partially pursue its scientific mission after successful recovery, though it will be limited.