• Title/Summary/Keyword: lugeon test

Search Result 13, Processing Time 0.02 seconds

A Study on the Grouting Effect of Ultrafine Cement in Rock Ground (초미립자 시멘트의 암반지반 그라우팅 주입효과에 관한 연구)

  • An, Jun-Hee;Park, Choon-Sik
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.19 no.12
    • /
    • pp.279-286
    • /
    • 2018
  • The grouting method is to reinforce the ground by injecting the chemical solution for the strengthening of the ground. Cement grouting material has usually used portland cement for centuries ago, but the cement particle size is large and the injection effect is limited. This study analyzes the effect of ultrafine cement grouting in rock ground using 3S-1 grouting in rock ground and ordinary Portland cement (OPC). The results of tests were compared and analyzed from the Lugeon test, bore loading test (P.M.T.), and injection (P-Q) test. The use of ultrafine cement (3S-1) had a higher effect (K, 10-6cm/sec) than OPC. The reinforcement effect of 3S-1 was also confirmed. Ultrafine cement (3S-1) was 4~9 times more injectable than OPC. Therefore, it is more advantageous to use ultrafine cement (3S-1) than OPC.

Correlation between the Distribution of Discontinuities and Groundwater Flow in Fractured Rock (온도검층과 수압시험을 통한 파쇄암반의 단열분포와 지하수 흐름 상관성 고찰)

  • Park, Seunghyuk;Chung, Il-Moon
    • The Journal of Engineering Geology
    • /
    • v.26 no.4
    • /
    • pp.505-513
    • /
    • 2016
  • The qualitative distribution of a fractured aquifer was characterized by electrical resistivity surveying as a part of basic groundwater investigation in Jangseong. The results were then used to choose sites for observation wells. The locations and distributions of permeable discontinuities were studied by analyses of temperature logs, a borehole image-processing system (BIPS), and hydraulic pressure testing using a double packer. The pressure test showed that the size of the discontinuities correlated with the Lugeon value and the results of the temperature log. The results show that temperature measurement is an effective method to identify permeable discontinuities, with the temperature difference correlating with the size of the aperture of the discontinuity.

A Study on the Field Application of Automatic Grouting System (자동화 그라우팅 기법의 현장적용성에 관한 연구)

  • Do, Jongnam;Park, Junghwan;Choi, Dongchan;Chun, Byungsik
    • Journal of the Korean GEO-environmental Society
    • /
    • v.13 no.1
    • /
    • pp.63-74
    • /
    • 2012
  • In Korea, grouting has been mostly designed and constructed by experiences without expert knowledge and theoretical study. So there are a lot of problems related to the quality and safty of grouting. Therefor, in this paper the quality management skills and method were discussed through out by using the auto-grouting method and field test of grouting for the construction. Through the limit water injection test of the soil, it make the optimum injection pressure and injection speed of grouting, and through the lugeon test of the rock, it make assess the permeability of before and after grouting. In order to prevent the hydraulic fracture of soil and break away from the grouts if it apply four kinds of mode of grouting stop criteria, injection effects can be improved. From the above characteristcs designers evalute the fitness values of injection pressure(p), injection speed(q) and grouting penetration time(t). So far, to record and manage pressure(p) and speed(q) of grouting autographic devices such as intergation flow-meter usually record data in a roll of paper. Intergration flow-meter can record grouting flow quantity exactly, but the recorded pressures differ from the any basis such as intitial, intermediate and final point. Therefore, it has been argued that is a need of reliable method to describe the connection between the pressure recorded by an intergration flow-meter and the special properties of the grouting target ground. auto-grouting method can describe the reliable connection between the grouting pressure and the special properties of the grouting target ground. So, in this paper by using auto-grouting method, it is expected that to secure basis of quality control techniques construction.