• 제목/요약/키워드: low crest structure

검색결과 17건 처리시간 0.024초

Experimental study on vibration serviceability of steel-concrete composite floor

  • Cao, Liang;Liu, Jiepeng;Chen, Y. Frank
    • Structural Engineering and Mechanics
    • /
    • 제74권5호
    • /
    • pp.711-722
    • /
    • 2020
  • In this study, on-site testing was carried out to investigate the vibration serviceability of a composite steel-bar truss slab with steel girder system. Impulse excitations (heel-drop and jumping) and steady-state motion (walking and running) were performed to capture the primary vibration parameters (natural frequency and damping ratio) and distribution of peak acceleration. The composite floor possesses low frequency (<8.3Hz) and damping ratio (<2.47%). Based on experimental, theoretical, and numerical analyses on fundamental natural frequency, the boundary condition of SCSS (i.e., three edges simply supported and one edge clamped) is deemed more comparable substitutive for the investigated composite floor. Walking and running excitations by one person (single excitation) were considered to evaluate the vibration serviceability of the composite floor. The measured acceleration results show a satisfactory vibration perceptibility. For design convenience and safety, a crest factor βrp describing the ratio of peak acceleration to root-mean-square acceleration induced from the walking and running excitations is proposed. The comparisons of the modal parameters determined by walking and running tests reveal the interaction effect between the human excitation and the composite floor.

상대여유고가 낮은 테트라포드 피복 경사제의 월파량에 대한 수리모형실험 및 기존 경험식의 예측성능 분석 (Hydraulic Model Experiments and Performance Analysis of Existing Empirical Formulas for Overtopping Discharge on Tetrapod Armored Rubble Mound Structures with Low Relative Freeboard)

  • 유상우;김재영;김도삼;이광호
    • 한국해안·해양공학회논문집
    • /
    • 제36권3호
    • /
    • pp.105-115
    • /
    • 2024
  • 호안을 포함한 해안구조물의 설계 시 월파량 평가는 주로 수리모형실험에 의존하며, 이를 기반으로 월파량 예측을 위한 많은 경험식이 제안되었다. 일반적으로 월파방지를 위한 호안구조물의 경우 설계조위에 설계파의 최대 수면진폭을 고려하여 마루높이가 결정되므로 입사파고에 비해 상대적으로 높은 여유마루고를 갖는다. 그러나, 월파를 원천적으로 차단하기 위해서는 비경제적인 구조물의 마루높이가 요구되기 때문에 호안구조물의 설계 시 월파량을 허용 가능한 수준으로 제한하는 허용월파량의 개념을 도입하고 있다. 따라서, 실해역에서는 입사파고에 비해 상대적으로 낮은 여유마루고를 갖는 호안구조물들이 존재한다. 본 연구에서는 수리모형실험을 통해 상대적으로 낮은 여유마루고를 갖는 사석경사제의 월파량에 관해 검토하였다. 또한, 월파량의 실험결과를 이용하여 기존 월파량 산정을 위한 경험식의 예측성능을 상호 비교·분석하였다.

필댐의 3차원 기하 효과에 따른 전기비저항 왜곡 효과 분석 (Analysis of distortion effect of resistivity data due to 3D geometry of fill dam)

  • 오석훈;김형수
    • 한국지구물리탐사학회:학술대회논문집
    • /
    • 한국지구물리탐사학회 2005년도 공동학술대회 논문집
    • /
    • pp.55-58
    • /
    • 2005
  • CFRD (콘크리트 표면 차수벽형 석괴댐)에서 수행한 전기비저항 탐사 결과, 하부에서 매우 낮은 비저항대가 관측되었다. 일반적으로 CFRD 형식의 댐은 내부 포화가 발생하지 않는 것으로 알려져 있으나, 금번 조사에서 하부 20m 깊이에서 일정하게 저비저항대가 발견되어 이에 대한 검토를 위해 3차원 해석을 수행하였다. 탐사 당시의 수위는 댐 정상부에서 10m 정도 내려가 있는 상태였다. 첫 탐사 이후 6개월이 지난 후에 이루어진 탐사에서도 비슷한 양상을 보이고 있었다. 이에 대한 해석을 위해서 조사 댐의 모양을 대상으로 3차원 순산 모델링을 수행하고, 이에 대한 2차원 역산 해석을 적용하여 기존 해석 방법의 오류 가능성을 검토하였다. 또한 비저항 조사가 많이 적용된 중심코아 형 댐의 경우의 사례와 비교하였다. 해석 결과, 3차원 댐체 구조에 대한 2차원 역산 해석은 저수부의 수위와 밀접한 관련을 갖는 것으로 보이며, 3차원의 사다리꼴 기하구조로 인하여 댐 내부에 비저항의 이상대가 존재할 경우에도 그 민감도가 떨어지는 것으로 분석되었다.

  • PDF

필댐의 3차원 기하 효과에 따른 전기비저항 왜곡 효과 분석 (Analysis of Distortion Effect of Resistivity Data Due to 3D Geometry of Fill Dam)

  • 오석훈;김형수
    • 지구물리
    • /
    • 제8권4호
    • /
    • pp.211-214
    • /
    • 2005
  • CFRD (콘크리트 표면 차수벽형 석괴댐)에서 수행한 전기비저항 탐사 결과, 하부에서 매우 낮은 비저항대가 관측되었다. 일반적으로 CFRD 형식의 댐은 내부 포화가 발생하지 않는 것으로 알려져 있으나, 금번 조사에서 하부 20m 깊이에서 일정하게 저비저항대가 발견되어 이에 대한 검토를 위해 3차원 해석을 수행하였다. 탐사 당시의 수위는 댐 정상부에서 10 m 정도 내려가 있는 상태였다. 첫 탐사 이후 6개월이 지난 후에 이루어진 탐사에서도 비슷한 양상을 보이고 있었다. 이에 대한 해석을 위해서 조사 댐의 모양을 대상으로 3차원 순산 모델링을 수행하고, 이에 대한 2차원 역산 해석을 적용하여 기존 해석 방법의 오류 가능성을 검토하였다. 또한 비저항 조사가 많이 적용된 중심코아형 댐의 경우의 사례와 비교하였다. 해석 결과, 3차원 댐체 구조에 대한 2차원 역산 해석은 저수부의 수위와 밀접한 관련을 갖는 것으로 보이며, 3차원의 사다리꼴 기하구조로 인하여 댐 내부에 비저항의 이상대가 존재할 경우에도 그 민감도가 떨어지는 것으로 분석되었다.

  • PDF

Distribution of the lingual foramina in mandibular cortical bone in Koreans

  • Kim, Dae Hyun;Kim, Moon Yong;Kim, Chul-Hwan
    • Journal of the Korean Association of Oral and Maxillofacial Surgeons
    • /
    • 제39권6호
    • /
    • pp.263-268
    • /
    • 2013
  • Objectives: The interforminal region, between the mandibular foramen, is known as a relatively safe area that is free of anatomic structures, such as inferior alveolar nerve, submandibular fossa, and lingual side of the mandible is occasionally neglected for its low clinical importance. Even in the case of a severely constricted alveolus, perforation of the lingual cortical bone had been intended. However, anterior extension of the inferior alveolar canal, important anatomic structure, such as concavity of lingual bone, lingual foramina, and lingual canal, has recently been reported through various studies, and untypical bleeding by perforation of the lingual plate on implantation has also been reported. Therefore, in this study, we performed radiographic and statistical analysis on distribution and appearance frequencies of the lingual foramina that causes perforation of the mandibular lingual cortical bone to prevent complications, such as untypical bleeding, during surgical procedure. Materials and Methods: We measured the horizontal length from a midline of the mandible to the lingual foramina, as well as the horizontal length from the alveolar crest to the lingual foramina and from the lingual foramina to the mandibular border by multi-detector computed tomography of 187 patients, who visited Dankook University Dental Hospital for various reasons from January 1, 2008 to August 31, 2012. Results: From a total of 187 human mandibles, 110 (58.8%) mandibles had lingual foramina; 39 (20.9%) had bilateral lingual foramen; 34 (18.2%) had the only left lingual foramen; and 37 (19.8%) had the only right lingual foramen. Conclusion: When there is consistent bleeding during a surgical procedure, clinicians must consider damages on the branches of the sublingual artery, which penetrate the lingual foramina. Also, when there is a lingual foramina larger than 1 mm in diameter on a pre-implantation computed tomography, clinicians must beware of vessel damage. In order to prevent these complications and progress with a safe surgical procedure, a thorough radiographic examination before the surgery is indispensable. Further, clinicians should retract lingual flap definitely to confirm the shape of the lingual bone and existence of the lingual foramina.

단위유량도와 비수갑문 단면 및 방조제 축조곡선 결정을 위한 조속계산 (Calculation of Unit Hydrograph from Discharge Curve, Determination of Sluice Dimension and Tidal Computation for Determination of the Closure curve)

  • 최귀열
    • 한국농공학회지
    • /
    • 제7권1호
    • /
    • pp.861-876
    • /
    • 1965
  • During my stay in the Netherlands, I have studied the following, primarily in relation to the Mokpo Yong-san project which had been studied by the NEDECO for a feasibility report. 1. Unit hydrograph at Naju There are many ways to make unit hydrograph, but I want explain here to make unit hydrograph from the- actual run of curve at Naju. A discharge curve made from one rain storm depends on rainfall intensity per houre After finriing hydrograph every two hours, we will get two-hour unit hydrograph to devide each ordinate of the two-hour hydrograph by the rainfall intensity. I have used one storm from June 24 to June 26, 1963, recording a rainfall intensity of average 9. 4 mm per hour for 12 hours. If several rain gage stations had already been established in the catchment area. above Naju prior to this storm, I could have gathered accurate data on rainfall intensity throughout the catchment area. As it was, I used I the automatic rain gage record of the Mokpo I moteorological station to determine the rainfall lntensity. In order. to develop the unit ~Ydrograph at Naju, I subtracted the basic flow from the total runoff flow. I also tried to keed the difference between the calculated discharge amount and the measured discharge less than 1O~ The discharge period. of an unit graph depends on the length of the catchment area. 2. Determination of sluice dimension Acoording to principles of design presently used in our country, a one-day storm with a frequency of 20 years must be discharged in 8 hours. These design criteria are not adequate, and several dams have washed out in the past years. The design of the spillway and sluice dimensions must be based on the maximun peak discharge flowing into the reservoir to avoid crop and structure damages. The total flow into the reservoir is the summation of flow described by the Mokpo hydrograph, the basic flow from all the catchment areas and the rainfall on the reservoir area. To calculate the amount of water discharged through the sluiceCper half hour), the average head during that interval must be known. This can be calculated from the known water level outside the sluiceCdetermined by the tide) and from an estimated water level inside the reservoir at the end of each time interval. The total amount of water discharged through the sluice can be calculated from this average head, the time interval and the cross-sectional area of' the sluice. From the inflow into the .reservoir and the outflow through the sluice gates I calculated the change in the volume of water stored in the reservoir at half-hour intervals. From the stored volume of water and the known storage capacity of the reservoir, I was able to calculate the water level in the reservoir. The Calculated water level in the reservoir must be the same as the estimated water level. Mean stand tide will be adequate to use for determining the sluice dimension because spring tide is worse case and neap tide is best condition for the I result of the calculatio 3. Tidal computation for determination of the closure curve. During the construction of a dam, whether by building up of a succession of horizontael layers or by building in from both sides, the velocity of the water flowinii through the closing gapwill increase, because of the gradual decrease in the cross sectional area of the gap. 1 calculated the . velocities in the closing gap during flood and ebb for the first mentioned method of construction until the cross-sectional area has been reduced to about 25% of the original area, the change in tidal movement within the reservoir being negligible. Up to that point, the increase of the velocity is more or less hyperbolic. During the closing of the last 25 % of the gap, less water can flow out of the reservoir. This causes a rise of the mean water level of the reservoir. The difference in hydraulic head is then no longer negligible and must be taken into account. When, during the course of construction. the submerged weir become a free weir the critical flow occurs. The critical flow is that point, during either ebb or flood, at which the velocity reaches a maximum. When the dam is raised further. the velocity decreases because of the decrease\ulcorner in the height of the water above the weir. The calculation of the currents and velocities for a stage in the closure of the final gap is done in the following manner; Using an average tide with a neglible daily quantity, I estimated the water level on the pustream side of. the dam (inner water level). I determined the current through the gap for each hour by multiplying the storage area by the increment of the rise in water level. The velocity at a given moment can be determined from the calcalated current in m3/sec, and the cross-sectional area at that moment. At the same time from the difference between inner water level and tidal level (outer water level) the velocity can be calculated with the formula $h= \frac{V^2}{2g}$ and must be equal to the velocity detertnined from the current. If there is a difference in velocity, a new estimate of the inner water level must be made and entire procedure should be repeated. When the higher water level is equal to or more than 2/3 times the difference between the lower water level and the crest of the dam, we speak of a "free weir." The flow over the weir is then dependent upon the higher water level and not on the difference between high and low water levels. When the weir is "submerged", that is, the higher water level is less than 2/3 times the difference between the lower water and the crest of the dam, the difference between the high and low levels being decisive. The free weir normally occurs first during ebb, and is due to. the fact that mean level in the estuary is higher than the mean level of . the tide in building dams with barges the maximum velocity in the closing gap may not be more than 3m/sec. As the maximum velocities are higher than this limit we must use other construction methods in closing the gap. This can be done by dump-cars from each side or by using a cable way.e or by using a cable way.

  • PDF

변형술식에 의한 완전방실중격결손의 교정 (Repair of Complete Atrioventricular Septal Defect with Surgical Modification)

  • 김웅한;김수철;이택연;한미영;정철현;박영관;김종환
    • Journal of Chest Surgery
    • /
    • 제32권7호
    • /
    • pp.628-636
    • /
    • 1999
  • 배경: 최근에 완전방실중격결손의 해부학적 구조에 대한 이해가 증가됨에 따라서 본원에서는 수술방법에 있 어서 여러 가지 변형을 시도하게 되었다. 대상 및 방법: 1997년 5월부터 1998년 7월까지 8명의 완전방실중 격결손 환자를 수술하였다. 남녀 각각 3명, 5명이었으며 나이는 2개월에서 28개월까지 분포하였고 평균 몸무 게는 6.0$\pm$2.2 Kg이었다. 심장의 해부학적 구조에 따라서 3명의 환아에서는 심실중격결손을 일차적으로 봉합 하여 수술을 단순화하였다(Group I). 좌심실유출로 협착의 가능성이 있는 2명의 경우에는 통상적인 방법대로 2개의 포편을 이용하였다(Group II). 그리고 불균형 완전방실중격결손의 경우에는 심실중격결손을 막는 포편 을 우심실에 치우쳐서 막고 심방중격을 새로 만들거나 좌측 방실판막의 부족한 판막부위를 자가 심낭막으로 메꾸어 주거나 좌측 방실판막이 parachute valve 인 경우에는 2개의 판막입구를 만들어 주었다(Group III). 결과: 모든 환자가 수술후 만족스러운 혈류역학을 보였으며 7명에서는 평균 3$\pm$1 일만에 인공호흡기 이탈이 가능하였으며 1명의 환자는 심장의 문제없이 폐질환으로 24일만에 인공호흡기를 이탈하였다. 수술후 합병증 으로 III군에서 판막성형을 시행한 좌측 판막이 찢어지면서 판막역류가 점진적으로 심해진 1명에서 2주만에 재수술을 하였다. 조기 및 만기사망은 없었으며 수술후 심장초음파검사에서 약간의 좌측 방실판막협착이 III 군에서 1명 있었으며(평균압력차 6.5 mmHg), 좌측 방실판막역류가 7명(87.5 %)의 환아에서 Grade I 이하였으 며, 우측 방실판막역류는 모든 환아에서 Grade I 이하였다. 결론: 완전방실중격결손의 수술시 해부학적인 구 조에 따라서 선택적으로 일부 환아에서는 심실중격결손을 일차적으로 봉합함으로써 수술을 단순화할 수 있 으며 우심실이 발달된 불균형 완전방실중격결손에서도 변형수술방법을 통하여 양심실성 교정을 하여 좋은 결과를 얻을 수 있었다.

  • PDF