• 제목/요약/키워드: longterm repair plan

검색결과 3건 처리시간 0.015초

공동주택의 장기수선계획 소요비용 예측모델 연구 (A Study on the Forecasting Model of the Required Cost for the Long-term Repair Plan in Apartment housings)

  • 이강희;유우상;채창우
    • KIEAE Journal
    • /
    • 제11권3호
    • /
    • pp.63-68
    • /
    • 2011
  • Building deterioration would be proceeded by various causes such as physical, social, economic degradation. The deterioration would be inevitably prevented or delayed to get the decent function and performance in various building part and components. The maintenance and management are continued to provide the decent living condition for the household. The maintenance means mainly a repair, including the on-time and longterm plan. The longterm repair would be conducted by the systemic preparation in management activity and a required cost. Therefore, the annual due for the longterm repair plan is important to prepare the repair cost in a required time. In this paper, it aimed at analyzing the longterm repair cost and modelling to forecast the required cost in total area, number of household and time elapse in apartment housing. The estimation model of a repair cost is used with a power function which has a good statistics. Results of this study are shown that the sample has a longterm repair due in a $2,032won/m^2{\cdot}yr$ averagely which is higher than $912won/m^2{\cdot}yr$ in domestic. Second, the longterm repair due is proportionally correlated with the time elapse in both a total area and the number of household. Third, the estimation model for the longterm repair amount is suitable for the power function which is most in any other estimation models. Fourth, the ration of the longterm plan repair due a year to the cumulated longterm amount is about 26%.

공종별 수선비용 추계모델을 활용한 공동주택 장기수선충당금 적립금액 산정 (Repair Accumulation Cost for the Long-Term Repair Plan in Multifamily Housing Using the Forecasting Model of the Repair Cost)

  • 이강희;채창우
    • KIEAE Journal
    • /
    • 제16권3호
    • /
    • pp.137-143
    • /
    • 2016
  • Purpose: Apartment housing should conduct a cyclic repair to keep and maintain the building performance since they are constructed. Therefore, the repair plan would be provided for long term period which explains the repair time, items and repair cost. Residents of apartment housing are responsible to pay for the repair activities. For repair cost, residents would reserve the money for repair little by little continuously until the required repair time because the repair cost takes a big burden for residents and lots of money a time. But, there is no systematic approach to provide the long term repair cost because it is no proper forecast of the repair cost to the upcoming repair time. In this study, it aimed at providing the monthly accumulation of the long term repair cost with the survey data in Seoul. Method: For these, the surveyed data are classified into 6 categories and number of data are 1,918. In addition, it developed the repair cost model for the 24 repair works and the cumulation function which is reflected with the each cost model. Result: This study are shown as follows : First, among the various estimation for the repair cost, the power function has a goodness of fit in statistics. Second, the monthly accumulation would be 12,840 won/household in size of $100,000m^2$ management area and $81.7won/m^2$ in size of the 1,000 household number during 40 years.

공동주택 건물 외부공간 및 옥외시설의 공종별 수선비용 산정모델 (Repair Cost Estimation Model of the Building Exterior and Outdoor Facilities in Apartment Housing)

  • 이강희;채창우
    • KIEAE Journal
    • /
    • 제16권3호
    • /
    • pp.129-135
    • /
    • 2016
  • Purpose: Building figuration is imperative to perceive the its value, environmental clean status and form. Therefore, maintenance activities of the building exterior are required to keep the housing condition and value. Each household should pay the repair cost which is brought out in the future. For this repair cost, the estimation model would needed to forecast and provide the required cost. This study aimed at providing the estimation model of the repair cost, using the repair survey data between the 2011 and 2014 in Seoul. Method: For these, it took various estimation function of repair cost such as 1st function, inverse function and so on. These above functions would be applied into the building exterior and outdoor facilities which figure the building shape and characteristics. Result: Results of this study are shown ; First, among 11 estimation models, the power function has a better statistics and goodness-of-fit than any other models. Second, the estimation model with a variable of household has a pattern in upward to the right. On the contrary, the model with management area is little downward to the right. Both of them are depended on the estimated parameter of the power function and the parameter smaller than 1.