• Title/Summary/Keyword: long-term repair plan

Search Result 43, Processing Time 0.028 seconds

Spontaneously Healed Thyroid Cartilage Fracture with Displacement: Report of a Case (전위를 동반한 갑상연골 골절의 자연 치유 치험 1례)

  • Ryu, Hyun-Ho;Lee, Byung-Kook;Jeung, Kyung-Woon
    • Journal of Trauma and Injury
    • /
    • v.23 no.1
    • /
    • pp.53-55
    • /
    • 2010
  • A thyroid cartilage fracture is a rare entity and can be overlooked easily. Such cases are difficult to diagnose, and assessment and treatment guidelines are difficult to determine. CT of the neck region may be useful when acute airway intervention is not required or when more information regarding the neck's anatomy is required for management decisions. We describe a case of a thyroid cartilage fracture with displacement. In the emergency department (ED), neck CT and fiberoptic nasopharyngoscopy were used to assess the status of the patient's (a male) vocal chords immediately. He remained unable to phonate continuously. After an immediate assessment, we decided to use steroid and conservative therapy. The patient had a good recovery and was without symptoms one month after injury. There is no question that early surgical repair of neck injuries affords the best results for airway and voice patency in most cases however, we suspect that surgical repair is not needed in all cases. Early recognition and an accurate therapy plan for a thyroid fracture with displacement are essential. Therefore, the emergency physician's immediate and careful decision based on endoscopy and neck CT is important for the patient's long-term recovery.

A Study on the History of Housing Unit Maintenance in an Apartment Building for Sustainable Performance (공동주택 단위주거 성능유지항목 도출을 위한 시설물 보수이력 분석)

  • Kang, Ji-Yeon
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2022.04a
    • /
    • pp.222-223
    • /
    • 2022
  • The purpose of the study is to derive maintenance items in dwelling unit of apartment after the liability period for defect security. In according with the Apartment Housing Management, the managers of apartment maintain facilities in public and develop a long-term repair plan. However, Apartment unit housing is a private area and is managed facilities individually by residents or owners. As the facility ages, it is necessary to derive items in dwelling unit of apartment that need to maintain performance. Therefore, this paper analyzed the history of repairing facilities through complaints about rental housing units.

  • PDF

The Promotion of Experiential Marine Sports by Developing aPlan for Fishing Village and Port (어촌·어항을 활용한 해양스포츠 체험관광 활성화 방안)

  • JI, Sam-Up;KIM, Yong-Jae;LEE, Jae-Hung
    • Journal of Fisheries and Marine Sciences Education
    • /
    • v.17 no.1
    • /
    • pp.86-105
    • /
    • 2005
  • The plan of developing a fishing village and port will be indirectly funded by the government. In the short term, there will be five different multi-functional fishing village models which are based on the first industry to attach to the third industry of marine sports experience tourism. In the long run, they have to be reached gradually. The popular scenic spot of the marine sports experience tourism is made by human resources and fundamental installations considering that it must be done in unpolluted water. It is necessary to separate the fish harbor into two sides. One side is an existing fishing industry. The other side is made up of several pontoons for the marine sports equipment of the marine mooring. It is necessary to build facilities, such as the mooring facility, the storage facility, the repair-check facility, supply-cleaning facility, information booth, accommodations, education facility, and a marine culture exchange facility.

A Study on Evaluation of Development Priority Order & Scheme for Redevelopment Target Area in Pusan Port (부산항 재개발 대상지의 개발우선순위 평가 및 개발방안에 관한 연구)

  • 여기태;박창호;김진구
    • Journal of Korea Port Economic Association
    • /
    • v.18 no.1
    • /
    • pp.61-83
    • /
    • 2002
  • Korea has designated 28 trade ports and 22 coastal ports under the Ports Act. If fishery ports and small inlets are counted, the number amounts to hundreds of ports. However, untimely and inefficient maintenance and repair works face Korean ports with functional loss, decreasing efficiency, and even catastrophe. Thus, further examinations on the maintenance or redevelopment of forts in Korea are urgent. Since the Korean War and the higher economic growth period in the 1970s, Busan Port has developed in a variety of ways, according to the necessity of social conditions at any given time, without any development Philosophy or systematic long-term master plan. As a result, ports and coastal industrial facilities have rushed to gather around the present North Busan Port, which has taken on mixed functions between ports and cities, adversely affecting several of their interactions. To resolve these circumstances, several redevelopment schemes were suggested for centering the old zone in the Busan Port interim. However, comprehensive evaluation and redevelopment schemes combining functions of both ports and cities, and effectively utilizing coastal zones have never been presented. In this respect, this study sets the priority order of the extracted unit project. This study analyzes the existing functions and facilities of Busan Port, extracting facility zones through redevelopment which is certain to fail or to decrease in efficiency. furthermore, this study presents status and development directions of specified redevelopment unit projects of higher priority order, and pursues the integrated plan of efficiency for Busan Port.

  • PDF

A study on reliability analysis model of the repair and replacement cycle of a building which utilizes Monte Carlo Simulation (몬테카를로 시뮬레이션을 활용한 건축물 수선교체주기 신뢰성 분석 모델에 관한 연구)

  • Kim, Jong-Rok;Jung, Young-Han;Son, Jae-Ho
    • Journal of the Korea Institute of Building Construction
    • /
    • v.10 no.2
    • /
    • pp.41-50
    • /
    • 2010
  • This study presented a model that can enable a reliability analysis for the repair and replacement cycle of a building by using background repair and replacement data and expert opinion as foundation data and applying Monte Carlo Simulation. The presented model offers the time of the repair and replacement of building elements for the period of a year, and supports the prediction of repair and replacement and expenses demand in advance while planning the maintenance of a building. In addition, the model will significantly reduce the risks to the building owner with regard to maintenance decisions. In addition, when a person in charge of the maintenance of large-scale building assets is having difficulties making decisions regarding the repair and replacement of existing building elements due to a lack of background data to support a long-term policy on the repair and replacement requirements, an engineering solution that can ensure the adequacy of this is provided. In summary, it can be largely divided into three study results. First, a method of estimating the repair and replacement cycle that can deal with the development of a construction system was developed. Second, a probabilistic methodology that can quantify the risk of the repair and replacement cycle was proposed. Third, the proposed model can be used as a means of supporting designer and constructor in making decisions for the life cycle plan of a building during a construction project.

Massive Rotator Cuff Tear Repair (광범위 회전근 개 파열의 봉합술)

  • Shin, Sang-Jin
    • Clinics in Shoulder and Elbow
    • /
    • v.13 no.1
    • /
    • pp.167-174
    • /
    • 2010
  • Purpose: Anatomical repair of massive rotator cuff tear has been technically challenging because of medial retraction, muscle atrophy and fatty degeneration. Among several treatment options for massive rotator cuff tear, we reviewed rotator cuff repairs and investigated modalities for improvement of clinical outcomes, decreasing the re-tear rate, and increasing healing. Materials and Methods: Patient-related factors and rotator cuff-related factors were the two major groups of factors we considered when choosing a treatment plan. Results: Mobilization of a massive rotator cuff tear was increased by soft tissue release and by the interval slide technique. After meticulous soft tissue release, anatomical repair could be achieved. If the injury was not amenable to anatomical repair, alternative treatment options such as partial repair, the margin convergence technique and augmentation with a tenotomized biceps tendon were considered. Many reports of massive rotator cuff repair demonstrated satisfactory clinical outcomes, decreased pain, recovery of shoulder functions, and increases in muscle strength. However, the re-tear rate had been reported to be relatively high in long-term follow-up. Conclusion: Despite a high re-tear rate after massive rotator cuff repair, a better understanding of the pathogenesis, progression and clinical symptoms of massive rotator cuff tear and improved surgical materials and techniques will lead to satisfactory clinical outcomes.

A Study on the Estimation Method of the Repair Rates in Finishing Materials of Domestic Office Buildings (국내 업무시설 건축 마감재의 수선율 산정 방안에 관한 연구)

  • Kim, Sun-Nam;Yoo, Hyun-Seok;Kim, Young-Suk
    • Korean Journal of Construction Engineering and Management
    • /
    • v.16 no.1
    • /
    • pp.52-63
    • /
    • 2015
  • Business facilities among domestic architectures have rapidly been constructed along with domestic economic development. It is an important facility taking the second largest proportion next to apartment buildings among current 31 building types of fire department classification of 2012 year for urban architectures. The expected service life of business facilities is 15 years, but 70% of those in urban areas have surpassed the 15 year service life as of the present 2014. Thus, the demand for urgent rehabilitation of such facilities is constantly increasing due to the aging and performance deterioration of the facilities'main finishing materials. Especially, the business facilities are being used for the lease of company office or private office, and such problems as aging and performance deterioration of the facilities could cause less competitive edge for leasing and real estate value depreciation for the O&M (Operation & Management) agent and the owner, respectively. Therefore, an effective planned rehabilitation as a preventive measure according to the standardized repair rate by the number of years after the construction is in need in order to prevent the aging and performance deterioration of the facilities(La et al. 2001). Nonetheless, domestic repair/rehabilitation standards based on the repair rate are mainly limited to apartment buildings and pubic institutions, resulting in impractical application of such standards to business facilities. It has been investigated and analyzed that annual repair rate data for each finishing material are required for examination of the applicability of the repair rate standard for the purpose of establishment of a repair plan. Hence, this study aimed at developing a repair rate computation model for finishing materials of the facilities and verifying the appropriateness of the annual repair rate for each finishing material through a case study after collecting and analyzing the repair history data of six business facilities. The results of this study are expected to contribute to the planning and implementation of more efficient repair/rehabilitation budget by preventing the waste of unpredicted repair cost and opportunity cost for the sake of the business facilities' owners and O&M agents.

A Condition Rating Method of Bridges using an Artificial Neural Network Model (인공신경망모델을 이용한 교량의 상태평가)

  • Oh, Soon-Taek;Lee, Dong-Jun;Lee, Jae-Ho
    • Journal of the Korean Society for Railway
    • /
    • v.13 no.1
    • /
    • pp.71-77
    • /
    • 2010
  • It is increasing annually that the cost for bridge Maintenance Repair & Rehabilitation (MR&R) in developed countries. Based on Intelligent Technology, Bridge Management System (BMS) is developed for optimization of Life Cycle Cost (LCC) and reliability to predict long-term bridge deteriorations. However, such data are very limited amongst all the known bridge agencies, making it difficult to reliably predict future structural performances. To alleviate this problem, an Artificial Neural Network (ANN) based Backward Prediction Model (BPM) for generating missing historical condition ratings has been developed. Its reliability has been verified using existing condition ratings from the Maryland Department of Transportation, USA. The function of the BPM is to establish the correlations between the known condition ratings and such non-bridge factors as climate and traffic volumes, which can then be used to obtain the bridge condition ratings of the missing years. Since the non-bridge factors used in the BPM can influence the variation of the bridge condition ratings, well-selected non-bridge factors are critical for the BPM to function effectively based on the minimized discrepancy rate between the BPM prediction result and existing data (deck; 6.68%, superstructure; 6.61%, substructure; 7.52%). This research is on the generation of usable historical data using Artificial Intelligence techniques to reliably predict future bridge deterioration. The outcomes (Long-term Bridge deterioration Prediction) will help bridge authorities to effectively plan maintenance strategies for obtaining the maximum benefit with limited funds.

Surgical Treatment of Patients with Abdominal Aortic Aneurysm (복부 대동맥류에 대한 수술)

  • Ryu, Kyoung-Min;Seo, Pil-Won;Park, Seong-Sik;Ryu, Jae-Wook;Kim, Seok-Kon;Lee, Wook-Ki
    • Journal of Chest Surgery
    • /
    • v.42 no.3
    • /
    • pp.331-336
    • /
    • 2009
  • Background: Open surgical repair of abdominal aortic aneurysms was initiated by Dubost in 1952. Despite the rapid expansion of percutaneous endovascular repair, open surgical repair is still recognized for curative intent. We retrospectively analyzed surgical outcome, complications, and mortality-related factors for patients with abdominal aortic aneurysms over a 6 year period. Material and Method: We analyzed 18 patients who underwent surgery for abdominal aortic aneurysms between March 2002 and March 2008. The indications for surgery were rupture, a maximal aortic diameter >60 mm, medically intractable hypertension, or pain. Result: The mean age was $66.6{\pm}9.3$ years (range, $49\sim81$ years). Twelve patients (66.7%) were males a 6 patients were females. Extension of the aneurysm superior to the renal artery existed in 6 patients (33.3%), and extension to the iliac artery existed in 13 patients (72.2%). Five patients (27.8%) had ruptured aortic aneurysms. The mean maximal diameter of the aorta was $72.2{\pm}12.9$ mm (range, $58\sim109$ mm). Surgery was performed by a midline laparotomy, and 6 patients underwent emergency surgery. The mean total ischemic time from aorta clamping to revascularization was $82{\pm}42$ minutes (range, $35\sim180$ minutes). The mortality rate was 16.7%; the mortality rate for patients with ruptured aneurysms was 60%, and the mortality rate for patients with unruptured aneurysms was 0%. The postoperative complications included one each of renal failure, femoral artery and vein occlusion, and wound infection. The patients who were discharged had a long-term survival of $34{\pm}26$ months (range, $4\sim90$ months). Rupture and emergency surgery had a statistically significant mortality-related factor (p < 0.05). Conclusion: Emergency surgery for ruptured aortic aneurysms continues to have a high mortality, but unruptured cases are repaired with relative safety. Successfully operated patients had long-term survival. Even though endovascular aortic repair is the trend for abdominal aortic aneurysms, aggressive application should be determined with care. Experience and systemic support of each center is important in the treatment plan.

Development of Optimal Decision-Making System for Rehabilitation of Water Distribution Systems Divided by small Division (상수관망의 구역별 최적개량 의사결정 시스템의 개발)

  • Baek Chun-Woo;Kim Seok-Woo;Kim Eung-Seok;Kim Joong-Hoon;Park Moo-Jong
    • Journal of Korea Water Resources Association
    • /
    • v.39 no.6 s.167
    • /
    • pp.545-552
    • /
    • 2006
  • The purpose of this study is to develop an optimal, long-term planning model for improvement of water distribution networks. The water distribution system is divided into sub-zones and the decision of improvement plan is made for each sub-zone. Costs for replacement, rehabilitation and repair, benefits including reduced pumping and leakage costs, and hydraulic reliability are considered to make optimal decision for improvement planning of water network. Harmony search algorithm is applied to optimize the system and hydraulic analysis model EPANET is interfaced with the optimal decision model to check the hydraulic reliability, The developed model is applied to actual water distribution system in Daegu-city, South Korea. The new model which use durability, conveyance and cost as a decision variable is different from existing methods which use only burying period and pipe type and can be used as optimal decision making system for water distribution network.