A thyroid cartilage fracture is a rare entity and can be overlooked easily. Such cases are difficult to diagnose, and assessment and treatment guidelines are difficult to determine. CT of the neck region may be useful when acute airway intervention is not required or when more information regarding the neck's anatomy is required for management decisions. We describe a case of a thyroid cartilage fracture with displacement. In the emergency department (ED), neck CT and fiberoptic nasopharyngoscopy were used to assess the status of the patient's (a male) vocal chords immediately. He remained unable to phonate continuously. After an immediate assessment, we decided to use steroid and conservative therapy. The patient had a good recovery and was without symptoms one month after injury. There is no question that early surgical repair of neck injuries affords the best results for airway and voice patency in most cases however, we suspect that surgical repair is not needed in all cases. Early recognition and an accurate therapy plan for a thyroid fracture with displacement are essential. Therefore, the emergency physician's immediate and careful decision based on endoscopy and neck CT is important for the patient's long-term recovery.
Proceedings of the Korean Institute of Building Construction Conference
/
2022.04a
/
pp.222-223
/
2022
The purpose of the study is to derive maintenance items in dwelling unit of apartment after the liability period for defect security. In according with the Apartment Housing Management, the managers of apartment maintain facilities in public and develop a long-term repair plan. However, Apartment unit housing is a private area and is managed facilities individually by residents or owners. As the facility ages, it is necessary to derive items in dwelling unit of apartment that need to maintain performance. Therefore, this paper analyzed the history of repairing facilities through complaints about rental housing units.
Journal of Fisheries and Marine Sciences Education
/
v.17
no.1
/
pp.86-105
/
2005
The plan of developing a fishing village and port will be indirectly funded by the government. In the short term, there will be five different multi-functional fishing village models which are based on the first industry to attach to the third industry of marine sports experience tourism. In the long run, they have to be reached gradually. The popular scenic spot of the marine sports experience tourism is made by human resources and fundamental installations considering that it must be done in unpolluted water. It is necessary to separate the fish harbor into two sides. One side is an existing fishing industry. The other side is made up of several pontoons for the marine sports equipment of the marine mooring. It is necessary to build facilities, such as the mooring facility, the storage facility, the repair-check facility, supply-cleaning facility, information booth, accommodations, education facility, and a marine culture exchange facility.
Korea has designated 28 trade ports and 22 coastal ports under the Ports Act. If fishery ports and small inlets are counted, the number amounts to hundreds of ports. However, untimely and inefficient maintenance and repair works face Korean ports with functional loss, decreasing efficiency, and even catastrophe. Thus, further examinations on the maintenance or redevelopment of forts in Korea are urgent. Since the Korean War and the higher economic growth period in the 1970s, Busan Port has developed in a variety of ways, according to the necessity of social conditions at any given time, without any development Philosophy or systematic long-term master plan. As a result, ports and coastal industrial facilities have rushed to gather around the present North Busan Port, which has taken on mixed functions between ports and cities, adversely affecting several of their interactions. To resolve these circumstances, several redevelopment schemes were suggested for centering the old zone in the Busan Port interim. However, comprehensive evaluation and redevelopment schemes combining functions of both ports and cities, and effectively utilizing coastal zones have never been presented. In this respect, this study sets the priority order of the extracted unit project. This study analyzes the existing functions and facilities of Busan Port, extracting facility zones through redevelopment which is certain to fail or to decrease in efficiency. furthermore, this study presents status and development directions of specified redevelopment unit projects of higher priority order, and pursues the integrated plan of efficiency for Busan Port.
Journal of the Korea Institute of Building Construction
/
v.10
no.2
/
pp.41-50
/
2010
This study presented a model that can enable a reliability analysis for the repair and replacement cycle of a building by using background repair and replacement data and expert opinion as foundation data and applying Monte Carlo Simulation. The presented model offers the time of the repair and replacement of building elements for the period of a year, and supports the prediction of repair and replacement and expenses demand in advance while planning the maintenance of a building. In addition, the model will significantly reduce the risks to the building owner with regard to maintenance decisions. In addition, when a person in charge of the maintenance of large-scale building assets is having difficulties making decisions regarding the repair and replacement of existing building elements due to a lack of background data to support a long-term policy on the repair and replacement requirements, an engineering solution that can ensure the adequacy of this is provided. In summary, it can be largely divided into three study results. First, a method of estimating the repair and replacement cycle that can deal with the development of a construction system was developed. Second, a probabilistic methodology that can quantify the risk of the repair and replacement cycle was proposed. Third, the proposed model can be used as a means of supporting designer and constructor in making decisions for the life cycle plan of a building during a construction project.
Purpose: Anatomical repair of massive rotator cuff tear has been technically challenging because of medial retraction, muscle atrophy and fatty degeneration. Among several treatment options for massive rotator cuff tear, we reviewed rotator cuff repairs and investigated modalities for improvement of clinical outcomes, decreasing the re-tear rate, and increasing healing. Materials and Methods: Patient-related factors and rotator cuff-related factors were the two major groups of factors we considered when choosing a treatment plan. Results: Mobilization of a massive rotator cuff tear was increased by soft tissue release and by the interval slide technique. After meticulous soft tissue release, anatomical repair could be achieved. If the injury was not amenable to anatomical repair, alternative treatment options such as partial repair, the margin convergence technique and augmentation with a tenotomized biceps tendon were considered. Many reports of massive rotator cuff repair demonstrated satisfactory clinical outcomes, decreased pain, recovery of shoulder functions, and increases in muscle strength. However, the re-tear rate had been reported to be relatively high in long-term follow-up. Conclusion: Despite a high re-tear rate after massive rotator cuff repair, a better understanding of the pathogenesis, progression and clinical symptoms of massive rotator cuff tear and improved surgical materials and techniques will lead to satisfactory clinical outcomes.
Korean Journal of Construction Engineering and Management
/
v.16
no.1
/
pp.52-63
/
2015
Business facilities among domestic architectures have rapidly been constructed along with domestic economic development. It is an important facility taking the second largest proportion next to apartment buildings among current 31 building types of fire department classification of 2012 year for urban architectures. The expected service life of business facilities is 15 years, but 70% of those in urban areas have surpassed the 15 year service life as of the present 2014. Thus, the demand for urgent rehabilitation of such facilities is constantly increasing due to the aging and performance deterioration of the facilities'main finishing materials. Especially, the business facilities are being used for the lease of company office or private office, and such problems as aging and performance deterioration of the facilities could cause less competitive edge for leasing and real estate value depreciation for the O&M (Operation & Management) agent and the owner, respectively. Therefore, an effective planned rehabilitation as a preventive measure according to the standardized repair rate by the number of years after the construction is in need in order to prevent the aging and performance deterioration of the facilities(La et al. 2001). Nonetheless, domestic repair/rehabilitation standards based on the repair rate are mainly limited to apartment buildings and pubic institutions, resulting in impractical application of such standards to business facilities. It has been investigated and analyzed that annual repair rate data for each finishing material are required for examination of the applicability of the repair rate standard for the purpose of establishment of a repair plan. Hence, this study aimed at developing a repair rate computation model for finishing materials of the facilities and verifying the appropriateness of the annual repair rate for each finishing material through a case study after collecting and analyzing the repair history data of six business facilities. The results of this study are expected to contribute to the planning and implementation of more efficient repair/rehabilitation budget by preventing the waste of unpredicted repair cost and opportunity cost for the sake of the business facilities' owners and O&M agents.
It is increasing annually that the cost for bridge Maintenance Repair & Rehabilitation (MR&R) in developed countries. Based on Intelligent Technology, Bridge Management System (BMS) is developed for optimization of Life Cycle Cost (LCC) and reliability to predict long-term bridge deteriorations. However, such data are very limited amongst all the known bridge agencies, making it difficult to reliably predict future structural performances. To alleviate this problem, an Artificial Neural Network (ANN) based Backward Prediction Model (BPM) for generating missing historical condition ratings has been developed. Its reliability has been verified using existing condition ratings from the Maryland Department of Transportation, USA. The function of the BPM is to establish the correlations between the known condition ratings and such non-bridge factors as climate and traffic volumes, which can then be used to obtain the bridge condition ratings of the missing years. Since the non-bridge factors used in the BPM can influence the variation of the bridge condition ratings, well-selected non-bridge factors are critical for the BPM to function effectively based on the minimized discrepancy rate between the BPM prediction result and existing data (deck; 6.68%, superstructure; 6.61%, substructure; 7.52%). This research is on the generation of usable historical data using Artificial Intelligence techniques to reliably predict future bridge deterioration. The outcomes (Long-term Bridge deterioration Prediction) will help bridge authorities to effectively plan maintenance strategies for obtaining the maximum benefit with limited funds.
Background: Open surgical repair of abdominal aortic aneurysms was initiated by Dubost in 1952. Despite the rapid expansion of percutaneous endovascular repair, open surgical repair is still recognized for curative intent. We retrospectively analyzed surgical outcome, complications, and mortality-related factors for patients with abdominal aortic aneurysms over a 6 year period. Material and Method: We analyzed 18 patients who underwent surgery for abdominal aortic aneurysms between March 2002 and March 2008. The indications for surgery were rupture, a maximal aortic diameter >60 mm, medically intractable hypertension, or pain. Result: The mean age was $66.6{\pm}9.3$ years (range, $49\sim81$ years). Twelve patients (66.7%) were males a 6 patients were females. Extension of the aneurysm superior to the renal artery existed in 6 patients (33.3%), and extension to the iliac artery existed in 13 patients (72.2%). Five patients (27.8%) had ruptured aortic aneurysms. The mean maximal diameter of the aorta was $72.2{\pm}12.9$ mm (range, $58\sim109$ mm). Surgery was performed by a midline laparotomy, and 6 patients underwent emergency surgery. The mean total ischemic time from aorta clamping to revascularization was $82{\pm}42$ minutes (range, $35\sim180$ minutes). The mortality rate was 16.7%; the mortality rate for patients with ruptured aneurysms was 60%, and the mortality rate for patients with unruptured aneurysms was 0%. The postoperative complications included one each of renal failure, femoral artery and vein occlusion, and wound infection. The patients who were discharged had a long-term survival of $34{\pm}26$ months (range, $4\sim90$ months). Rupture and emergency surgery had a statistically significant mortality-related factor (p < 0.05). Conclusion: Emergency surgery for ruptured aortic aneurysms continues to have a high mortality, but unruptured cases are repaired with relative safety. Successfully operated patients had long-term survival. Even though endovascular aortic repair is the trend for abdominal aortic aneurysms, aggressive application should be determined with care. Experience and systemic support of each center is important in the treatment plan.
The purpose of this study is to develop an optimal, long-term planning model for improvement of water distribution networks. The water distribution system is divided into sub-zones and the decision of improvement plan is made for each sub-zone. Costs for replacement, rehabilitation and repair, benefits including reduced pumping and leakage costs, and hydraulic reliability are considered to make optimal decision for improvement planning of water network. Harmony search algorithm is applied to optimize the system and hydraulic analysis model EPANET is interfaced with the optimal decision model to check the hydraulic reliability, The developed model is applied to actual water distribution system in Daegu-city, South Korea. The new model which use durability, conveyance and cost as a decision variable is different from existing methods which use only burying period and pipe type and can be used as optimal decision making system for water distribution network.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.