• Title/Summary/Keyword: long-term cost

Search Result 998, Processing Time 0.03 seconds

Feasibility Study of High-Efficiency Ground Heat Exchanger using Double U-tube through a Real-Scale Experiment

  • Bae, Sangmu;Kim, Jaemin;Nam, Yujin
    • KIEAE Journal
    • /
    • v.17 no.4
    • /
    • pp.33-39
    • /
    • 2017
  • Purpose: The use of renewable energy system is essential for building energy independence and saving energy consumption in the building sector. Among renewable energy technologies, ground source heat pump(GSHP) system is more energy-efficient and environmental-friendly than other heat source systems due to utilize stable ground heat source. However, the GSHP system requires a high initial installation cost and installation space in limited urban area, so it is difficult to have superiority in the market of heat source system. Therefore, it is necessary to develop the installation method of low-cost and improve system performance. This paper aims to evaluate the performance of double u-tube ground heat exchanger(GHX) and verify system feasibility through real-scale experiment. Method: In this study, the real-scale experiment of vertical closed-type GSHP system was conducted using double u-tube GHX and high-efficiency grout. Through the verification experiment, heat source temperature, heat exchange rate(HER) and seasonal performance factor(SPF) were measured according to the long-term operation. In addition, the feasibility analysis was conducted comparing to the single u-tube system. Result: In the results of experiment, average HER was 136.27 W/m and average SPF was 5.41. Furthermore, compared to the single u-tube, the installation cost of the developed system could be reduced about 70% in the same heating load condition.

Electricity Cost Minimization for Delay-tolerant Basestation Powered by Heterogeneous Energy Source

  • Deng, Qingyong;Li, Xueming;Li, Zhetao;Liu, Anfeng;Choi, Young-june
    • KSII Transactions on Internet and Information Systems (TIIS)
    • /
    • v.11 no.12
    • /
    • pp.5712-5728
    • /
    • 2017
  • Recently, there are many studies, that considering green wireless cellular networks, have taken the energy consumption of the base station (BS) into consideration. In this work, we first introduce an energy consumption model of multi-mode sharing BS powered by multiple energy sources including renewable energy, local storage and power grid. Then communication load requests of the BS are transformed to energy demand queues, and battery energy level and worst-case delay constraints are considered into the virtual queue to ensure the network QoS when our objective is to minimize the long term electricity cost of BSs. Lyapunov optimization method is applied to work out the optimization objective without knowing the future information of the communication load, real-time electricity market price and renewable energy availability. Finally, linear programming is used, and the corresponding energy efficient scheduling policy is obtained. The performance analysis of our proposed online algorithm based on real-world traces demonstrates that it can greatly reduce one day's electricity cost of individual BS.

An Optimization Study on Maximizing the Earning Power of Casting Industry for Management through TPI (주물 산업의 수익력 극대화를 위한 관리부문의 TPI 최적화 연구)

  • Kang, Byong-Rho;Lee, Chang-Ho
    • Journal of the Korea Safety Management & Science
    • /
    • v.16 no.3
    • /
    • pp.327-333
    • /
    • 2014
  • Changes in the business environment in which intense and sustained growth and survival must meet a variety of customer needs (Q, C, D) and business side of the enterprise for profit structure reformation is absolutely necessary for innovation activities. So far, management of innovation in method BPR, PI, OVA, 6 Sigma, Strategic Purchasing, PPM, SCM etc. are being introduced. However, they have a limit of partial optimization and improvement-oriented techniques. So this paper studied the TPI(Total Profit Innovation) application in order to derive empirical methodology to maximize profitability for the domestic S foundry factory. To this end, long-term gains through structural analysis and intensity analysis to ensure continued growth and profitability strategy are devised through management Innovation analysis. And improvement projects was presented to solve main issues of five categories(Inventory, Sales Mix, Cost, Quality Cost, Skill and Work-load) We will expect the office productivity improvement and financial performance improvement and then continually accumulate and review the results.

INVESTIGATION OF ACTIVATED CARBON ADSORBENT ELECTRODE FOR ELECTROSORPTION-BASED URANIUM EXTRACTION FROM SEAWATER

  • ISMAIL, AZNAN FAZLI;YIM, MAN-SUNG
    • Nuclear Engineering and Technology
    • /
    • v.47 no.5
    • /
    • pp.579-587
    • /
    • 2015
  • To support the use of nuclear power as a sustainable electric energy generating technology, long-term supply of uranium is very important. The objective of this research is to investigate the use of new adsorbent material for cost effective uranium extraction from seawater. An activated carbon-based adsorbent material is developed and tested through an electrosorption technique in this research. Adsorption of uranium from seawater by activated carbon electrodes was investigated through electrosorption experiments up to 300 minutes by changing positive potentials from +0.2V to +0.8V (vs. Ag/AgCl). Uranium adsorption by the activated carbon electrode developed in this research reached up to 3.4 g-U/kg-adsorbent material, which is comparable with the performance of amidoxime-based adsorbent materials. Electrosorption of uranium ions from seawater was found to be most favorable at +0.4V (vs. Ag/AgCl). The cost of chemicals and materials in the present research was compared with that of the amidoxime-based approach as part of the engineering feasibility examination.

Home care services: crisis and prospects (가정간호: 위기와 전망)

  • Song, Chong-Rye
    • Perspectives in Nursing Science
    • /
    • v.6 no.1
    • /
    • pp.55-65
    • /
    • 2009
  • The Korean government introduced Home Care Services System to cut medical cost and make efficient use of limited medical resources because of increasing chronic diseases and the growing population of the elderly. The Korean government established measures to control the use of insurance services by restricting the number of nurse's visits to patient's home and by asking the patients to shoulder the transportation fee of nurses during the visit. Factors such as oversupply of hospital facilities, low price of home care services, high insurance coverage for hospital services and increased nuclear family set up resulted in the limited use of home care nursing services. The introduction of long-term care insurance in 2007 brought the decrease in the number of home care agencies and these agencies are facing a crisis today. The increase in chronic diseases and growing population of the elderly recently resulted in the need to control the high medical cost. Home care services for early discharge patients and chronic-severe disease patients will contribute in the reduction of medical cost at the same time improves the quality of patient's life. To catch up with the demands of the nation, accessibility to home care services should be improved and policies such as the expansion of home care services insurance coverage and promotion of establishing home care agencies should be considered.

  • PDF

Initial Ship Allocation for the Fleet Systematization (선단구성을 위한 초기배선)

  • 이철영;최종화
    • Journal of the Korean Institute of Navigation
    • /
    • v.8 no.1
    • /
    • pp.1-16
    • /
    • 1984
  • The economical property of a shipping enterprise, as well as other transportation industries, is determined by the difference between the freight earned and expense paid. This study can be regarded as a division of optimizing ship allocation to routes under the integrated port transport system. Fleet planning and scheduling require complicated allocations of cargoes to ships and ships to routes in order to optimize the given criterion function for a given forecast period. This paper deals with the optimum ship allocation problem minimizing the operating cost of ships in a shipping company. Optimum fleet operating for a shipping enterprise is very important, since the marine transportation is a form of large quantity transport requiring long-term period, and there is a strong possibility to bring about large amount of loss in operation resulting from a faulty ship allocation. Where there are more than one loading and discharging ports, and a variety of ship's ability in speed, capacity, operating cost etc., and when the amount of commodities to be transported between the ports has been determined, then the ship's schedule minimizing the operating cost while satisfying the transport demand within the predetermined period will be made up. First of all a formula of ship allocation problems will be established and then will be constructed to solve an example by the Integer Programming application after consideration of the ship's ability, supply and demand of commodity, amount of commodity to be transported, operating costs of each ship etc. This study will give good information on deciding intention for a ship oprator or owner to meet the computerization current with shiping management.

  • PDF

ROADWAY PERFORMANCE EVALUATION USING FUNCTION ANALYSIS METHOD OF VALUE ENGINEERING

  • Jong-Hyun Park;Yong-Jang Lee;In-Su Jung;Chan-Sik Lee
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.1528-1533
    • /
    • 2009
  • Infrastructure is provided to the user through long-term project period and large-scale working expenses. Existing facilities are getting old as time goes by. Accordingly, proper maintenance is required and generally more maintenance cost than initial invested cost is needed during life cycle. Therefore, a specific plan that just increases the value of facilities is required by evaluating performance of facilities and inputting minimum maintenance cost. Value engineering that increases the value of object by systemically analyzing Life Cycle Costs and function is actively promoted at the design phase of construction. These efforts can increase the performance of facilities at the maintenance phase of infrastructure. This study is to search how to evaluate the performance of Roadway by utilizing function analysis, as a core part of VE in the maintenance phase. In order to this a new evaluation criteria were proposed by adding an evaluation items to the existing criteria through the research of old documents, status of roadway maintenance and function analysis of VE. The results of this study may promote the effective performance evaluation to determine a resolution of roadway congestion in future. A succeeding study using the proposed evaluation criteria will be required.

  • PDF

Monitoring Landcreep Using Terrestrial LiDAR and UAVs (지상라이다와 드론을 이용한 땅밀림 모니터링 연구)

  • Jong-Tae Kim;Jung-Hyun Kim;Chang-Hun Lee;Seong-Cheol Park;Chang-Ju Lee;Gyo-Cheol Jeong
    • The Journal of Engineering Geology
    • /
    • v.33 no.1
    • /
    • pp.27-37
    • /
    • 2023
  • Assessing landcreep requires long-term monitoring, because cracks and steps develop over long periods. However, long-term monitoring using wire extensometers and inclinometers is inefficient in terms of cost and management. Therefore, this study selected an area with active landcreep and evaluated the feasibility of monitoring it using imagesing from terrestrial LiDAR and drones. The results were compared with minute-by-minute data measured in the field using a wire extensometer. The comparison identified subtle differences in the accuracy of the two sets of results, but monitoring using terrestrial LiDAR and drones did generate values similar to the wire extensometer. This demonstrates the potential of basic monitoring using terrestrial LiDAR and drones, although minute-byminute field measurements are required for analyzing and predicting landcreep. In the future, precise monitoring using images will be feasible after verifying image analysis at various levels and accumulating data considering climate and accuracy.

Cost Analysis of Asphalt Pavements Reinforced with Glass Fiber and Polymer Modified Using Falling Weight Deflectometer (Falling Weight Deflectometer를 이용한 섬유보강 아스팔트 및 폴리머 개질 아스팔트 포장의 비용 효과 분석)

  • Kim, Boo-Il;Lee, Moon-Sup;Jeon, Sung-Il;Kim, Sang-Kyu
    • International Journal of Highway Engineering
    • /
    • v.11 no.4
    • /
    • pp.153-160
    • /
    • 2009
  • Falling Weight Deflectometer (FWD) tests were performed to evaluate the structural capacity of glass fiber reinforced (GFR), polymer modified (PM), and unmodified asphalt pavement in Korea-LTPP (Long Term Pavement Performance) section. FWD tests showed that the tensile strains of GFR and PM asphalt pavements at the bottom of asphalt layer were 29% and 21% less than that of unmodified asphalt pavement. The structural capacity was then used as a performance criterion for calculating the cost effect of GFR and PM asphalt pavements. From the results, 5cm of asphalt layer thickness was reduced by applying GFR asphalt, and 3cm by applying PM asphalt. However, construction cost of PM and GFR asphalt pavement were increased due to the higher GFR and PM asphalt price. Life cycle cost analysis showed that the initial construction cost of GFR and PM asphalt pavement were higher but the management and user cost were less than those of unmodified asphalt pavement.

  • PDF

A Study on the Scheduling of Planned Maintenance for Multicomponent System with Hidden Failures : Focusing on Inspection Cost (다품목 시스템의 Hidden Failure를 고려한 계획정비 스케줄링에 관한 연구 : 검사비용을 중심으로)

  • Kim, Mansoo;Hyun, Do Kyung;Kim, Sung Hwan;Ji, Woong Ki;Kwon, Ki-Sang
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.20 no.10
    • /
    • pp.149-158
    • /
    • 2019
  • The scheduling of planned maintenance problem of a system consisting of a number of components was studied. The purpose of maintenance scheduling is to minimize the cost of maintaining long-term operations. On the system side, the cost of a system shutdown can be minimized by grouping and inspecting a number of components. In addition, proper inspection cycles can be selected for each component to identify the failure sufficiently early to minimize the cost of the failure. To reduce the complexity of the calculations, the 'base interval approach' used in previous studies was applied and, in addition, the inspection cost savings from simultaneous inspections of multiple components were considered. To compare the effectiveness of inspection cost savings, this paper presents the results of simulation analysis performed by referring to the cases in the existing studies.