• Title/Summary/Keyword: long-term cost

Search Result 998, Processing Time 0.035 seconds

Multi-Point Sheet Forming Using Elastomer (탄소중합체를 이용한 다점 박판 성형)

  • 박종우
    • Transactions of Materials Processing
    • /
    • v.13 no.2
    • /
    • pp.129-136
    • /
    • 2004
  • Recently, instead of a matched die forming method requiring a high cost and long delivery term, a multi-point dieless forming method using a pair of matrix type punch array as flexible dies has been developed. Since the conventional multi-point dieless forming method has some disadvantages of difficulty in precise punch control and high-cost of equipment, a new concept of multi-point dieless forming method combined with an elasto-forming method has been suggested in this study. For optimal selection of elastomers, compression tests of rubbers, polyethylene and foams were carried out together with FEM analysis of the deformation behavior during sheet forming process using a rigid punch and elastomers. Compressive strain was concentrated on the upper central area of the elastomer under the punch, and the rubber exhibited higher concentration of the compressive strain than foams. Two-dimensional curved surface was formed successfully by the multi-point elasto-dieless forming method using an optimal combination of rubber and foam materials.

A Study on Optimal Economic Operation of Hydro-reservoir System by Stochastic Dynamic Programming with Weekly Interval (주간 단위로한 확률론적 년간 최적 저수지 경제 운용에 관한 연구)

  • Song, Gil-Yong;Kim, Yeong-Tae;Han, Byeong-Yul
    • Proceedings of the KIEE Conference
    • /
    • 1987.11a
    • /
    • pp.106-108
    • /
    • 1987
  • Until now, inflow has been handled an independent log-normal random variable in the problem of planning the long-term operation of a multi-reservoir hydrothermal electric power generation system. This paper introduces the detail study for making rule curve by applying weekly time interval for handling inflows. The hydro system model consists of a set of reservoirs and ponds. Thermal units are modeld by one equivalent thermal unit. Objective is minimizing the total cost that the summation of the fuel cost of equivalent thermal unit at each time interval. For optimization, stochastic dynamic programming(SDP) algorithm using successive approximations is used.

  • PDF

A Study on the field application analysis for high adhesive spray type of degenerated and rubberized asphalt membrane material (스프레이식 고점착 변성 고무 아스팔트 도막 방수재의 재료 및 공법에 관한 실험적 연구)

  • Oh, Sang-Keun;Song, Je-Young;Kim, Jin-Seong;Lee, Nam-Kyoo
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2006.11a
    • /
    • pp.61-65
    • /
    • 2006
  • Urethane, epoxy, acrylic have common property to adhere on the concrete dried surface in the waterproofing materials at present. In the wet condition, however, the materials such as urethane, epoxy, acrylic need a long hardening time and it become a reason of water leakage as the materials breaking down. it is one of the problem to adhere to the substrate. Therefore, in this thesis, I focused to assure the structural safety and durability and quality for waterproofing and safe of construction cost by cut down the cost of labor and reduce the term of works as searching the application of field condition for hish adhesive spray type of degenerated and rubberized asphalt membrane material.

  • PDF

Hybrid Multicast and Segment-Based Caching for VoD Services in LTE Networks

  • Choi, Kwangjin;Choi, Seong Gon;Choi, Jun Kyun
    • ETRI Journal
    • /
    • v.37 no.4
    • /
    • pp.685-695
    • /
    • 2015
  • This paper proposes a novel video delivery scheme that reduces the bandwidth consumption cost from a video server to terminals in Long-Term Evolution networks. This proposed scheme combines optimized hybrid multicast with a segment-based caching strategy for use in environments where the maximum number of multicast channels is limited. The optimized hybrid multicast, allocation of multicast channels, and cache allocation are determined on the basis of a video's request rate, the related video's length, and the variable cost per unit size of a segment belonging to the related video. Performance evaluation results show that the proposed scheme reduces a video's delivery costs. This work is applicable to on-demand TV services that feature asynchronous video content requests.

A Study on the Forecasting of Using BIM Long-Term Maintenance Cost Model for Apartment (BIM을 이용한 공동주택 장기수선비용 예측모델 제시)

  • Song, A-Reum;Kim, Ji-Yun;Yun, Seok-Heon
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2013.05a
    • /
    • pp.215-217
    • /
    • 2013
  • The maintenance management in buildings has got more important by the increasing complexity of building sizes and use. Nowadays an expectation and a possibility of BIM technology become accepted as a new construction management method, therefore many studies and legal systems of it are being suggested actively. Although orders for BIM projects are supposed to be increasing, at present the BIM information accumulated from planning and design still doesn't have its continuity at the maintenance step after completion of construction in terms of LCC. It can't use the possibility that BIM originally has, and also causes some confusion in communication. This study analyzes and classifies required information in terms of BIM in the range of estimating repair costs of apartment buildings, as an example of a way to use BIM information at the maintenance step.

  • PDF

Long term health monitoring of post-tensioning box girder bridges

  • Wang, Ming L.
    • Smart Structures and Systems
    • /
    • v.4 no.6
    • /
    • pp.711-726
    • /
    • 2008
  • A number of efforts had been sought to instrument bridges for the purpose of structural monitoring and assessment. The outcome of these efforts, as gauged by advances in the understanding of the definition of structural damage and their role in sensor selection as well as in the design of cost and data-effective monitoring systems, has itself been difficult to assess. The authors' experience with the design, calibration, and operation of a monitoring system for the Kishwaukee Bridge in Illinois has provided several lessons that bear upon these concerns. The systems have performed well in providing a continuous, low-cost monitoring platform for bridge engineers with immediate relevant information.

Long Term Trend of Uranium Production and Price

  • Hye-Jin Son;Su-Hyun Kang;Jong-Pil Jung;Chang-Lak Kim
    • Journal of Nuclear Fuel Cycle and Waste Technology(JNFCWT)
    • /
    • v.21 no.2
    • /
    • pp.295-301
    • /
    • 2023
  • To broaden the utilization of nuclear energy, uranium as a fuel should be mined indispensably. Mining accounts for the largest portion of the cost of producing the uranium assembly. Therefore, this study analyzes the trends of uranium prices, which have a significant impacts on the mining cost. Uranium production contributing to the price fluctuations is explained in five periods from 1945 to the present. Moreover, the series of events affecting uranium prices from the 1970s until the present are verified. Among them, the most recent incidents considered in this study are the following: COVID-19 pandemic, Kazakhstan unrest, and Russia-Ukraine war. European countries have started to reconsider the transition to nuclear power to reduce their dependence on Russian oil and gas, which has contributed to the surge in uranium prices. Based on the results of this study, various international issues have been closely associated with the nuclear power industry and uranium, affecting the production of uranium and its price.

Economic Efficiency of the Korean Container Terminals: A Stochastic Cost Frontier Approach

  • Seokwoo Jake Choi;Gi-Su Kim;BoKyung Kim
    • Journal of Korea Trade
    • /
    • v.26 no.3
    • /
    • pp.23-44
    • /
    • 2022
  • Purpose - Recent issues such as vessel enlargement, strengthening of environmental regulations, and port smartization are expected to increase costs and intensify competition in the port industry. In the new normal era, when external growth has reached its limit, the efficient operation of ports is becoming indispensable for achieving sustainable growth. This study aims to identify the determinants of inefficiency by examining the cost structure and efficiency of container terminals in Korea and furthermore propose the political implications to derive the maximization of efficiency. Design/methodology - This study estimates the cost function of container terminal operators and identifies the efficiency of container terminals using stochastic cost frontier (SCF) in the first stage. In the second step, the SCF results are compared with the data envelopment analysis (DEA). Last, this paper proposes efficiency determinants on container terminal operation to establish appropriate strategies. Out of the 29 container terminal operators in South Korea, 13 operators participated in the survey. The translog cost function was estimated utilizing a total of 116 observations collected over the 2007-2017 period. Findings - Empirical analysis shows that economies of scale exist in Korea's container ports, which provides a rationale for the government's policy to establish the global terminal operator by integrating small terminal operators to enhance competitiveness. In addition, as a result of the determinants analysis, container throughput, weight of direct employment costs, and labour cost share have positive effects on improving cost efficiency, while inefficiency increases as the length of quay increases. More specifically, cost efficiency improves as the proportion of direct employment costs to outsourcing service costs increases. Originality/value - This study contributes to analyzing the inefficiency factors of container terminals through efficiency analysis with respect to a cost function. In addition, this study proposes the practical and political implications, such as establishing a long-term manpower pool, the application of the hybrid liner terminal system, and the construction of a statistical data system, to improve the cost inefficiency of terminal operators.

Long Term Evaluation of UF Membrane process using River-bed Water (복류수를 이용한 한외여과공정의 장기운전 평가)

  • Kim, Chung H.;Lim, Jae L.;Kang, Suk H.;Kim, Su H.
    • Journal of Korean Society of Water and Wastewater
    • /
    • v.22 no.4
    • /
    • pp.429-436
    • /
    • 2008
  • Membrane system has been increasingly considered as a safe and cost-effective water treatment process especially in case of small scale water works. This research is a basis of membrane application in water works through a long period test with obtaining operation skills and evaluation of water quality and cost competitiveness. For the research, the UF membrane system was installed in small water treatment plant that uses river-bed water as raw water. The system was consisted of 2 stage membrane and operated in constant flow mode (Flux: 1.5, 1.0, 0.9, 0.6). In each different flux condition, TMP trends were showed better results at lower flux condition. And through the high flux condition test, it is certified that membrane system could deal with breakdown of one stage. Water quality of permeate was satisfied the water quality standards especially turbidity. To know what mainly causes fouling on membrane, the test by membrane with several cleaning agents and EDX analysis have done in lab. Through the tests, ferrous concentration in raw water, backwashing water and membrane surface etc. was high and it causes fouling inside and outside of membrane. So acid cleaning using organic acid such as oxalic acid is necessary in Chemical in Place (CIP). At the economical aspect the electrical cost of membrane system is higher than that of slow sand filtration but labor cost can be reduced by automation. However, the use of labor should be determined considering effectiveness and stability of operation. Because during the operation, there are several breakdown such as electrical shock by lightning, water drop in summer, etc.

Strategic Electricity Resource Planning using EGEAS Model (EGEAS 모형을 활용한 전략적 전원개발 계획)

  • Kwon, Y.H.;Kim, C.S.
    • Proceedings of the KIEE Conference
    • /
    • 1993.07a
    • /
    • pp.144-147
    • /
    • 1993
  • The long-term electricity resource planning of electric utility has undergone significant change during the past decade. The current resource planning can be considered as multi-objective decision making procedure under the various uncertainties such as demand growth, construction cost, fuel price, environmental regulation, plant site, financial adequacy, new technology advent and so on. This paper presents a standardized electricity resource planning scheme using the strategic planning concept. EGEAS computer model was fully applied to indentify feasible alternative plans and simulate various attribute values corresponding each alternative plan and future. As a case study, a hypothetical long-ten capacity expansion planning problem is analyzed.

  • PDF