• 제목/요약/키워드: load limits

검색결과 314건 처리시간 0.023초

장거리 (마라톤)선수에서의 전 경기중 심박동수의 변화 (Changes of Heart Rate During Marathon Running)

  • 김인교;이중우;하종식;유연희;최정옥;김기호
    • The Korean Journal of Physiology
    • /
    • 제13권1_2호
    • /
    • pp.1-12
    • /
    • 1979
  • To evaluate the present status of physical fittness of Korean long distance runners, body fat, pulmonary functions, maximal oxygen intake and oxygen debt were measured in 5 elite marathoners (A group), 6 college student runners (B group) and 3 middle school student runners (C group). After laboratory tests, full course marathon running was performed in 2 elite marathoners during which their heart rates were monitored continuously. The results are summerized as follows: 1) Total body fat in all three groups are in the range of 13-15% of their body weight. 2) In all three groups, average values of various pulmonary functions were within the normal limits, but those of tidal volume were higher and respiratory rate were lower in comparison to normal values. These phenomena may represent respiratory adaptations against training. The average resting oxygen consumptions in A,B and C were $322{\pm}23$, $278{\pm}14$ and $287{\pm}16$m1/min, respectively. 3) In all three groups, resting blood pressures were in the normal range, but the resting heart rate was slightly lower in groups A $(56{\pm}3\;beats/min)$ and B $(64{\pm}2\;beats/min)$ and higher in group C $(82{\pm}9\;beats/min)$ in comparison to normal values. These changes in cardiovascular functions in marathoners may also represent adaptive phenomena. 4) During treadmill running the minute ventilation and oxygen consumption of the runners increased lineally with work load in all three groups. When the oxygen consumption was related to heart rate, it appeared to be a exponential function of the heart rate in all three groups. 5) The average maximal heart rates during maximal work were $196{\pm}3$, $191{\pm}3$ and $196{\pm}5\;beats/min$ for groups A,B and C, respectively. Maximal oxygen intakes were $84.2{\pm}3.3\;ml/min/kg$ in group A, $65.2{\pm}1.1\;ml/min/kg$ in group B and $58.7{\pm}0.4\;ml/min/kg$ in group C. 6) In all three groups, oxygen debts and the rates of recovery of heart rate after treadmill running were lower than those of long ditsance runners reported previously. 7) The 40 km running time in 2 elite marathoners was recorded to be $2^{\circ}42'25'$, and their mean speed was 243 m/min (ranged 218 to 274 m/min). The heart rate appeared to increase lineally with running speed, and the total energy expenditure during 40 km running was approximately 1360.2 Calories. From these it can be speculated that if their heart rates were maintained at 166 beats/min during the full course of marathon running, their records would be arround $2^{\circ}15'$. Based on these results, we may suspect that a successful long distance running is, in part, dependent on the economical utilization of one's aerobic capacity.

  • PDF

동력경운기의 경사지견인 및 주행특성에 관한 연구 (III)-동력경운의 경사지 견인성능- (Study on the Travel and Tractive Characteristics of the Two-Wheel Tractor on the General Slope Land(III)-Tractive Performance of Power Tiller-)

  • 송현갑;정창주
    • Journal of Biosystems Engineering
    • /
    • 제3권2호
    • /
    • pp.35-61
    • /
    • 1978
  • 동력경운깅가 일반 경사지에서 견인주행하는 경우 견인주행성능과 주행특성을 구명하기 위하여 토양의 종류 및 상태는 일정하게 하고 지면의 기하학적 조건과 견인주행속도 및 견인하중을 변수로 하여 외부동력전달계의 시점인 좌우차륜과 토양간에 발생하는 차륜구동력 및 굴름정항과 Engine에서 구동륜까지 내부전달계를 통하여 전달된 동력의 이론치와 실험치와의 부합여부를 검정하고 부가적으로 동력경운기가 경사지기계화의 동력기로써의 가능성여부와 문제점을 찾으려한다.

  • PDF

동력경운기의 경사지견인 및 주행특성에 관한 연구 (Ⅲ)-동력경운의 경사지 견인성능- (Study on the Travel and Tractive Characteristics of the Two-Wheel Tractor on the General Slope Land(Ⅲ)-Tractive Performance of Power Tiller-)

  • 송현갑;정창주
    • Journal of Biosystems Engineering
    • /
    • 제3권2호
    • /
    • pp.34-34
    • /
    • 1978
  • 동력경운깅가 일반 경사지에서 견인주행하는 경우 견인주행성능과 주행특성을 구명하기 위하여 토양의 종류 및 상태는 일정하게 하고 지면의 기하학적 조건과 견인주행속도 및 견인하중을 변수로 하여 외부동력전달계의 시점인 좌우차륜과 토양간에 발생하는 차륜구동력 및 굴름정항과 Engine에서 구동륜까지 내부전달계를 통하여 전달된 동력의 이론치와 실험치와의 부합여부를 검정하고 부가적으로 동력경운기가 경사지기계화의 동력기로써의 가능성여부와 문제점을 찾으려한다.

How effective has the Wairau River erodible embankment been in removing sediment from the Lower Wairau River?

  • Kyle, Christensen
    • 한국수자원학회:학술대회논문집
    • /
    • 한국수자원학회 2015년도 학술발표회
    • /
    • pp.237-237
    • /
    • 2015
  • The district of Marlborough has had more than its share of river management projects over the past 150 years, each one uniquely affecting the geomorphology and flood hazard of the Wairau Plains. A major early project was to block the Opawa distributary channel at Conders Bend. The Opawa distributary channel took a third and more of Wairau River floodwaters and was a major increasing threat to Blenheim. The blocking of the Opawa required the Wairau and Lower Wairau rivers to carry greater flood flows more often. Consequently the Lower Wairau River was breaking out of its stopbanks approximately every seven years. The idea of diverting flood waters at Tuamarina by providing a direct diversion to the sea through the beach ridges was conceptualised back around the 1920s however, limits on resources and machinery meant the mission of excavating this diversion didn't become feasible until the 1960s. In 1964 a 10 m wide pilot channel was cut from the sea to Tuamarina with an initial capacity of $700m^3/s$. It was expected that floods would eventually scour this 'Wairau Diversion' to its design channel width of 150 m. This did take many more years than initially thought but after approximately 50 years with a little mechanical assistance the Wairau Diversion reached an adequate capacity. Using the power of the river to erode the channel out to its design width and depth was a brilliant idea that saved many thousands of dollars in construction costs and it is somewhat ironic that it is that very same concept that is now being used to deal with the aggradation problem that the Wairau Diversion has caused. The introduction of the Wairau Diversion did provide some flood relief to the lower reaches of the river but unfortunately as the Diversion channel was eroding and enlarging the Lower Wairau River was aggrading and reducing in capacity due to its inability to pass its sediment load with reduced flood flows. It is estimated that approximately $2,000,000m^3$ of sediment was deposited on the bed of the Lower Wairau River in the time between the Diversion's introduction in 1964 and 2010, raising the Lower Wairau's bed upwards of 1.5m in some locations. A numerical morphological model (MIKE-11 ST) was used to assess a number of options which led to the decision and resource consent to construct an erodible (fuse plug) bank at the head of the Wairau Diversion to divert more frequent scouring-flows ($+400m^3/s$)down the Lower Wairau River. Full control gates were ruled out on the grounds of expense. The initial construction of the erodible bank followed in late 2009 with the bank's level at the fuse location set to overtop and begin washing out at a combined Wairau flow of $1,400m^3/s$ which avoids berm flooding in the Lower Wairau. In the three years since the erodible bank was first constructed the Wairau River has sustained 14 events with recorded flows at Tuamarina above $1,000m^3/s$ and three of events in excess of $2,500m^3/s$. These freshes and floods have resulted in washout and rebuild of the erodible bank eight times with a combined rebuild expenditure of $80,000. Marlborough District Council's Rivers & Drainage Department maintains a regular monitoring program for the bed of the Lower Wairau River, which consists of recurrently surveying a series of standard cross sections and estimating the mean bed level (MBL) at each section as well as an overall MBL change over time. A survey was carried out just prior to the installation of the erodible bank and another survey was carried out earlier this year. The results from this latest survey show for the first time since construction of the Wairau Diversion the Lower Wairau River is enlarging. It is estimated that the entire bed of the Lower Wairau has eroded down by an overall average of 60 mm since the introduction of the erodible bank which equates to a total volume of $260,000m^3$. At a cost of $$0.30/m^3$ this represents excellent value compared to mechanical dredging which would likely be in excess of $$10/m^3$. This confirms that the idea of using the river to enlarge the channel is again working for the Wairau River system and that in time nature's "excavator" will provide a channel capacity that will continue to meet design requirements.

  • PDF