• Title/Summary/Keyword: life-cycle performance

Search Result 771, Processing Time 0.039 seconds

An Analysis of the Operational Time and Productivity in Whole-tree and Cut-to-Length Logging Operation System (전목 및 단목 집재작업시스템에서 작업시간 및 공정 분석)

  • Kim, Min-Kyu;Park, Sang-Jun
    • Journal of Korean Society of Forest Science
    • /
    • v.101 no.3
    • /
    • pp.344-355
    • /
    • 2012
  • This study was conducted to analyze on the operational time and productivities of logging operations in whole-tree logging operation system by tower-yarder and swing-yarder, and in cut-to-length logging operation system by excavator with grapple in order to establish the efficient logging operation system and to spread logging operation technique. In the analysis of operational time, in case of whole-tree logging operation system, the felling time was 46.6 sec/cycle by chain saw, the yarding time was 480.6 sec/cycle by tower-yarder, the yarding time was 287.4 sec/cycle by swing-yarder and the bucking time was 155.14 sec/cycle by chain saw. In case of the cut-to-length logging operation system, the felling and bucking time was 225.65 sec/cycle by chain saw, the cut-to-length extraction time was 4,972 sec/cycle by excavator with grapple, the branches and leaves extraction time was 3,143 sec/cycle by excavator with grapple. The forwarding time was 4,688 sec/cycle by wheel type mini-forwarder, the forwarding time was 2,118 sec/cycle by excavator with grapple and small forwarding vehicle. In the analysis of operational productivities, in case of whole-tree logging operation system, the average felling performance was $57.89m^3/day$ by chain saw, the average yarding performance was $20.3m^3/day$ by tower-yarder, $31.55m^3/day$ by swing-yarder respectively, the average bucking performance was $20.3m^3/day$ by chain saw. In case of the cut-to-length logging operation system, the average felling and bucking performance was $11.96m^3/day$ by chain saw, the average cut-to-length extraction performance was $34.75m^3/day$ by excavator with grapple, the average branches and leaves extraction performance was $37.66m^3/day$ by excavator with grapple, the average length of operation road construction was 73.8 m/day by excavator with grapple. The average forwarding performance by wheel type mini-forwarder and the average forwarding performance by excavator with grapple and small forwarding vehicle was $15.73m^3/day$ and $65.03m^3/day$, respectively.

A Comparative Analysis of Life Cycle Cost on the Window Glass and the Insulation Film Coated Glass for Window (창호 유리의 단열필름 시공에 따른 생애주기비용 비교 분석)

  • Jeong, Mingu;Kim, Gwang-Hee
    • Journal of the Korea Institute of Building Construction
    • /
    • v.14 no.6
    • /
    • pp.583-590
    • /
    • 2014
  • The purpose of this study is to analyze and compare the life cycle cost of window glass with insulation film and regular glass, to verify an economical window construction method. As an approach method, the thermal performance data of each type of glass was measured using Window 6.3 and ECO2-OD Simulation Program, applied it to the case building to calculate the air conditioning and heating maintenance costs and LCC, and compared the economic feasibility. As a result, installing an additional insulation film prevents the solar heat penetration in the summer, so it reduces the cooling cost, on the other hand, it increased heating cost in winter. From the life cycle cost perspective, the effect of cooling cost reduction does not counterbalance the increase in heating cost and the additional cost from film installation and repair; therefore, the installation of insulation film may not be a proper method.

Application of Life Cycle Assessment to Enhance the Environmental Performance of Process Systems and Products (공정시스템과 제품의 환경성을 향상시키기 위한 전과정평가의 활용)

  • Lim, Seong-Rin
    • Clean Technology
    • /
    • v.20 no.4
    • /
    • pp.339-348
    • /
    • 2014
  • Life cycle assessment (LCA) has become an important tool used to enhance the environmental performance of process systems and products. LCA is an essential element in design for environment (DfE) because LCA can be utilized to evaluate and analyze environmental impacts incurred in the life cycle and supply chain. This review presents methodologies that can be used to integrate LCA into DfE activities and reduce environmental impacts from process systems and products; and introduces case studies for water supply systems and cellular phones. LCA is first used to quantify environmental impacts and identify the principal contributor to high impacts. In the next step, environmental impacts from principal contributors can be reduced by using mathematical optimization tools as an engineering and technological approach and by utilizing the cooperation of professionals from a diverse range of fields. Because the methodologies and case studies can be applied and extended to other fields, this review paper can contribute to helping prevent environmental pollution and enhance the sustainability of our society.

Whole Life Performance Bid Evaluation in the Korean Public Sector

  • Park, Kenneth Sungho;Lim, Hyoung-Chul
    • Journal of the Korea Institute of Building Construction
    • /
    • v.12 no.6
    • /
    • pp.682-700
    • /
    • 2012
  • Over the last several years, Korea has increasingly adopted design-build for public construction projects. There is a much greater awareness of the need to change to a system based on 'Value for Money', which is high on the government's agenda. A whole life performance bid evaluation model is proposed to aid decision makers in the selection of a design-builder. This is based on the integration of a framework using an analytic hierarchy process, as the bid awarding system is being changed from one based on the lowest price to one based on best value over the life-cycle. Key criteria such as whole life cost, service life planning and design quality are important through the key stages of the evaluation process. The model uses a systematic and holistic approach, which enables the public sector client to make better decisions in design-builder selection, which will deliver whole life benefits based on long-term cost-effectiveness.

ROADWAY PERFORMANCE EVALUATION USING FUNCTION ANALYSIS METHOD OF VALUE ENGINEERING

  • Jong-Hyun Park;Yong-Jang Lee;In-Su Jung;Chan-Sik Lee
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.1528-1533
    • /
    • 2009
  • Infrastructure is provided to the user through long-term project period and large-scale working expenses. Existing facilities are getting old as time goes by. Accordingly, proper maintenance is required and generally more maintenance cost than initial invested cost is needed during life cycle. Therefore, a specific plan that just increases the value of facilities is required by evaluating performance of facilities and inputting minimum maintenance cost. Value engineering that increases the value of object by systemically analyzing Life Cycle Costs and function is actively promoted at the design phase of construction. These efforts can increase the performance of facilities at the maintenance phase of infrastructure. This study is to search how to evaluate the performance of Roadway by utilizing function analysis, as a core part of VE in the maintenance phase. In order to this a new evaluation criteria were proposed by adding an evaluation items to the existing criteria through the research of old documents, status of roadway maintenance and function analysis of VE. The results of this study may promote the effective performance evaluation to determine a resolution of roadway congestion in future. A succeeding study using the proposed evaluation criteria will be required.

  • PDF

Constitution of Work Process for the Remodeling Construction Project in Planning Phase (건축물 리모델링 기획단계에서의 사업수행 프로세스 구축)

  • Kwon, Won;Chun, Jae-Youl
    • Korean Journal of Construction Engineering and Management
    • /
    • v.7 no.6
    • /
    • pp.165-174
    • /
    • 2006
  • Recently, the architecture remodeling is rising as new alternative for activating the construction market as the interest toward life cycle of buildings has increased. But the reality is that current remodeling business is suffering various types of difficulties in its performance due to the absence of general management technology and factor technology in systematic performance procedure or evaluation, etc toward remodeling effect, evaluation on performance, imperfect system for reflecting user requirements and remodeling life cycle ; planning, $feasibility ^{\circ}\hat{E}designing^{\circ}\hat{E}construction^{\circ}\hat{E}management$ along with lack of overall understanding on remodeling. Accordingly, this research has attempted to search for an effective management method through overall understanding in project performance by presenting work procedure of remodeling project and analysis items for decision making, etc centered on early planning stage out of three stages called planning, designing and construction.

Development of the Performance-Based Bridge Maintenance System to Generate Optimum Maintenance Strategy Considering Life-Cycle Cost (생애주기비용을 고려한 성능기반 교량 최적 유지관리 전략 수립 시스템 개발)

  • Park, Kyung-Hoon;Lee, Sang-Yoon;Hwang, Yoon-Koog;Kong, Jung-Sik;Lim, Jong-Kwon
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.11 no.4
    • /
    • pp.109-120
    • /
    • 2007
  • In this study, a bridge maintenance system is developed to generate performance-based optimum maintenance strategy by considering the life-cycle cost. A multi-objective combinatorial optimization problem is formulated to generate a tradeoff maintenance scenarios which satisfies the balance among the conflicting objectives such as the performance and cost during the bridge lifetime and a genetic algorithm is applied to the system. By using the developed program, this study proposes a process of optimum maintenance scenario applying to the steel girder bridge of national road. The developed system improves the current methods of establishing the bridge maintenance strategy and can be utilized as an efficient tool to provide the optimum bridge maintenance scenario corresponding to the various constraints and requirements of bridge agency.

A STUDY ON THE LIFE CYCLE COST ANALYSIS IN LIGHT RAIL TRANSIT BRIDGES: FOCUSED ON SUPERSTRUCTURE

  • Lee Du-heon;Kim Kyoon-tai;Kim Hyun Bae;Jun Jin-taek;Han Choong-hee
    • International conference on construction engineering and project management
    • /
    • 2007.03a
    • /
    • pp.30-40
    • /
    • 2007
  • The demand for light-rail construction projects has recently been increasing, and they are mostly supervised by private construction companies. Therefore, a private construction company that aim to raise gains from the operation of the facilities during the contract period greater than what they invested should b able to accurately calculate the costs from the aspect of Life Cycle Cost (LCC). In particular, a light-rail transit bridge that has a heavier portion from the aspect of the cost of light-rail transit construction requires a more accurate calculation method than the conventional LCC calculation method. For this, an LCC analysis model was developed and a cost breakdown structure was suggested based on literature review. The construction costs by shape of the upper part of a light-rail transit were calculated based on the cost breakdown system presented in this paper, and the cost generation cycle and cost unit price were collected and analyzed based on records on maintenance costs, rehabilitation and replacement. In addition, after forming some hypotheses in order to perform the LCC analysis, economic evaluation was conducted from the aspect of the LCC by using performance data by item.

  • PDF

A Study on Mechanical Performance Evaluation and Economic Analysis by Reclaimed Hot Asphalt Pavement (순환 가열 아스팔트의 용도별 기계적성능 평가 및 경제성 분석 연구)

  • Mun, Sung Ho;Ka, Hyun Gil;Lee, Ci Won;Park, Yong Boo
    • Land and Housing Review
    • /
    • v.10 no.4
    • /
    • pp.51-59
    • /
    • 2019
  • The government is encouraging the notice of obligatory reclaimed asphalt as a result of the economic and social positioning of green growth to reduce the amount of waste resources and to solve natural resource problems by recycling continuously generated waste resources. However, it is necessary to develop application guideline for each application to apply reclaimed asphalt to the site because quality control of the reclaimed asphalt is difficult and the specifications are ambiguous as well. Therefore, in this study, the mix design, quality test, performance test, and finite element analysis about reclaimed Asphalt Pavement were conducted to develop application guideline for reclaimed hot asphalt. The mix design was carried out for the comparative general hot mix asphalt mixture, the reclaimed hot mix asphalt mixture using the additive, and the reclaimed hot mix asphalt mixture without the additive. Indirect tensile strength and tensile strength ratio tests were used to characterize the reclaimed hot mix asphalt mixture. Using the results of dynamic modulus test and FWD test for KPRP analysis and finite element analysis, the performance life was evaluated for general pavement and pavement using recycled aggregate. Finally, the life cycle cost analysis was used to compare and analyze the economics of reclaimed asphalt concrete pavement.

Economic Analysis of Reinforced Concrete Bridges Considering Performance Evalution (성능평가를 고려한 철근콘크리트교의 경제성 분석)

  • 손용우;정영채;김종길
    • Journal of the Computational Structural Engineering Institute of Korea
    • /
    • v.17 no.2
    • /
    • pp.141-150
    • /
    • 2004
  • Recently, it is really concerned about corrosion and aging of reinforced concrete bridges. Corrosional steel reinforcing in concrete affects not only safety of bridges structure but also bending strength of reinforced concrete's member. Rate of corrosion, characteristic of bending strength, and economical evaluation aren't clear in reinforced concrete, considering performance evaluation. The purpose of study is as follows. It studies about ability of resistance's strength and cost of life cycle according to reduction of steel reinforcing's corrosion. Moreover, it shows calculating formula of bending strength with corrosion of current rate and exactly evaluates about the rest life at corrosional reinforced concrete bridges.