• Title/Summary/Keyword: licensing basis event

Search Result 3, Processing Time 0.017 seconds

A study on the Effects and Improvements of a Train Drivers' Licensing System (철도기관사 면허제 시행효과 및 개선방안에 관한 연구)

  • Lee, Chan-Bong;Park, Jin-Pyo
    • Journal of the Korean Society for Railway
    • /
    • v.18 no.1
    • /
    • pp.71-80
    • /
    • 2015
  • During normal subway rush hours, a train-driver is in charge of more than 3,000 people on a daily basis. When an emergency event occurs, millions of people and their property come to depend only on the train-driver's ability. After the Daegu subway fire disaster in February 2003, the Railway Safety Act was enacted in October 2004 and the 'Train Drivers' Licensing System' was introduced by the National Railroad Administration in July 2006 to secure and improve protection. This study was conducted to investigate and evaluate the effects of the Train Drivers' Licensing System since the Licensing System was first introduced eight years ago. In addition, the analysis will suggest better policies for the effectiveness of the 'Train Drivers' Licensing System'.

SSC risk significance in risk-informed, performance-based licensing of non-LWRs

  • James C. Lin
    • Nuclear Engineering and Technology
    • /
    • v.56 no.3
    • /
    • pp.819-823
    • /
    • 2024
  • The main criteria used in NEI 18-04 to define SSCs as risk-significant include (1) the SSC is required to keep all LBEs within the F-C target, and (2) the total frequency with the SSC failed exceeds 1% of the limit for at least one of the three cumulative risk metrics used for evaluating the integrated plant risk. The first one is a reasonable criterion in determining the risk significant SSCs. However, the second criterion may not be adequate to serve the purpose of determining the risk significance of SSCs. In the second criterion, the cumulative risk metric values representing the integrated plant risk (less the preventive and mitigative effects of the SSC being evaluated) are compared to a risk limit that represents a very small contribution to the overall integrated plant risk, which corresponds appropriately to the contributions from individual SSCs. The easiest approach to redefine the NEI 18-04 definition of risk-significant SSCs in relation to the integrated plant risk metrics is to compare the difference, between the risk metric value calculated with the SSC failed and the risk metric value calculated with the SSC credited, with 1% of the risk limit established for the integrated plant risk metrics.

A PRELIMINARY EVALUATION OF UNPROTECTED LOSS-OF-FLOW ACCIDENT FOR A PROTOTYPE FAST-BREEDER REACTOR

  • SUZUKI, TOHRU;TOBITA, YOSHIHARU;KAWADA, KENICHI;TAGAMI, HIROTAKA;SOGABE, JOJI;MATSUBA, KENICHI;ITO, KEI;OHSHIMA, HIROYUKI
    • Nuclear Engineering and Technology
    • /
    • v.47 no.3
    • /
    • pp.240-252
    • /
    • 2015
  • In the original licensing application for the prototype fast-breeder reactor, MONJU, the event progression during an unprotected loss of flow (ULOF), which is one of the technically inconceivable events postulated beyond design basis, was evaluated. Through this evaluation, it was confirmed that radiological consequences could be suitably limited even if mechanical energy was released. Following the Fukushima-Daiichi accident, a new nuclear safety regulation has become effective in Japan. The conformity of MONJU to this new regulation should hence be investigated. The objectives of the present study are to conduct a preliminary evaluation of ULOF for MONJU, reflecting the knowledge obtained after the original licensing application through CABRI experiments and EAGLE projects, and to gain the prospect of in-vessel retention for the conformity of MONJU to the new regulation. The preliminary evaluation in the present study showed that no significant mechanical energy release would take place, and that thermal failure of the reactor vessel could be avoided by the stable cooling of disrupted-core materials. This result suggests that the prospect of in-vessel retention against ULOF, which lies within the bounds of the original licensing evaluation and conforms to the new nuclear safety regulation, will be gained.