• 제목/요약/키워드: large-scale construction projects

검색결과 191건 처리시간 0.026초

Performance assessment of precast concrete pier cap system

  • Kim, T.H.;Kim, Y.J.;Shin, H.M.
    • Computers and Concrete
    • /
    • 제13권4호
    • /
    • pp.501-516
    • /
    • 2014
  • The purpose of this study was to investigate the performance of precast concrete pier cap system. The proposed precast pier cap provides an alternative to current cast-in-place systems, particularly for projects in which a reduced construction time is desired. Five large-scale pier cap specimens were constructed and tested under quasistatic monotonic loading. The computer program, RCAHEST (Reinforced Concrete Analysis in Higher Evaluation System Technology) was used for the analysis of reinforced concrete structures. A bonded tendon element is used based on the finite element method, and can represent the interaction between the tendon and concrete of a prestressed concrete member. A joint element is used in order to predict the inelastic behaviors of segmental joints with a shear key. This study documents the testing of the precast concrete pier cap system under monotonic loading and presents conclusions and design recommendations based on the experimental and analytical findings. Additional full-scale experimental research is needed to refine and confirm design details, especially for actual detailing employed in the field.

시스템엔지니어링 기법 적용에 따른 경량전철사업의 RAM적용에 관한 고찰 (A Study on the RAM Application of a Light Rail Transit Business, Ac-cording to the Technique Application in System Engineering)

  • 이성권;민경세;전서탁;정계용
    • 시스템엔지니어링학술지
    • /
    • 제7권2호
    • /
    • pp.13-19
    • /
    • 2011
  • A LRT(Light Rail Transit) is one of the Future Urban Railway Development Project. The project's goal is to reduce a transportation congestion in the center of the city. New transportation is intensely required in order to overcome a limit of the ground transportation that is the existing public transportation, A LRT(Light Rail Transit) construction project to be based on an unmanned driving system is the large composition system that a vehicle, a signal, communication, electric, track etc. were organically integrated as echo-friendly urban transportation systems. It also put a huge budget, which is a large-scale infrastructure projects. It is international trend that Light Rail Transit projects apply a technique in System Engineering for a schedule, cost, quality elevations, and to approach in viewpoints of life-cycle from initial construction steps to operation, abolition. This paper intends to analyze RAM requirements taking into consideration ISO/IEC 15288 throughout life-cycle from concept, design, manufacture, operation and maintenance to the final phase, decommissioning, and the study seeks to suggest directions of efficient use to domestic LRT projects.

Intelligent cooling control for mass concrete relating to spiral case structure

  • Ning, Zeyu;Lin, Peng;Ouyang, Jianshu;Yang, Zongli;He, Mingwu;Ma, Fangping
    • Advances in concrete construction
    • /
    • 제14권1호
    • /
    • pp.57-70
    • /
    • 2022
  • The spiral case concrete (SCC) used in the underground powerhouse of large hydropower stations is complex, difficult to pour, and has high requirements for temperature control and crack prevention. In this study, based on the closed-loop control theory of "multi-source sensing, real analysis, and intelligent control", a new intelligent cooling control system (ICCS) suitable for the SCC is developed and is further applied to the Wudongde large-scale underground powerhouse. By employing the site monitoring data, numerical simulation, and field investigation, the temperature control quality of the SCC is evaluated. The results show that the target temperature control curve can be accurately tracked, and the temperature control indicators such as the maximum temperature can meet the design requirements by adopting the ICCS. Moreover, the numerical results and site investigation indicate that a safety factor of the spiral case structure was sure, and no cracking was found in the concrete blocks, by which the effectiveness of the system for improving the quality of temperature control of the SCC is verified. Finally, an intelligent cooling control procedure suitable for the SCC is proposed, which can provide a reference for improving the design and construction level for similar projects.

공구분할기반 공동주택 거푸집공사 작업조 구성 프로세스 (Process of Formwork Crew Team Formation Based on Work Zoning in Apartment Housing Projects)

  • 구교진;조동현;이준호;박상헌;박찬수
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2012년도 추계 학술논문 발표대회
    • /
    • pp.285-286
    • /
    • 2012
  • In the large scale projects, it is difficult to manage every blocks because of the apartment housing project have repetitive shapes and structures. Therefore, it is necessary to divide construction site into work zones and blocks considering site plan, the number of units per each floor, arrangement of blocks, etc. In this study, 20 influencing factors on the grouping of work zones and formwork crew team formation are identified through case study and literature review. Factors are analyzed to determine the degree of influence through experts interviews. A systematic process of crew formation based on work zoning and the considerations by each steps are presented.

  • PDF

건설 리프트의 적정 대수 산정에 관한 연구 (A Study on the Estimation of Proper Numbers of Construction Lifts)

  • 김선국;한갑규
    • 한국건축시공학회지
    • /
    • 제8권3호
    • /
    • pp.119-125
    • /
    • 2008
  • The volume of material and number of workers mobilized has been on the rise in line with the domestic projects getting higher, larger and complex currently. Particularly for the project in downtown, delivering the resources in timely manner is very crucial in carrying out the overall project as scheduled. Inappropriate lifting plan often causes inefficiency over the entire project, resulting in increase in schedule and cost. Despite of such importance of lifting plan for architectural work, lifting plans at the most of domestic projects, except a few cases for large scale high-rise buildings, have been heavily dependent on engineer's personal experience and intuition alone. To deal with such problems, the study was intended to develop and suggest a systematic and objective process for determining the lift, categorizing the lifting equipment into the two types, one for workers and another for material.

시공중 계측을 통한 어스앵커 축력변화 특성사례 연구 (Case Study of Earth Anchor Axial Force Change Characteristic through Monitoring during Construction Period)

  • 김성욱;한병원
    • 한국지반공학회:학술대회논문집
    • /
    • 한국지반공학회 2004년도 춘계학술발표회
    • /
    • pp.285-292
    • /
    • 2004
  • Earth Anchor method as a supporting system is widely used in the large scale deep excavation of urban areas or slope excavation project. Considering the application frequency of that method and catastrophe of that method under unproper construction management, we can find out many problems relevant to the domestic design and construction management of earth anchor method. When we encounter the cases of rapid increments and various decrements in earth anchor axial forces, considering the characteristic of earth anchor method, it is an essential point to catch the reasons and to prepare countermeasures. This article introduces two actual monitoring examples based on the close analyses of measured data in a typical large scale deep excavation project and slope excavation project. One is a rapidly increasing case of earth anchor axial forces with the continuous advance of incremental deformation in a geological layer interface. And another is a decreasing case of earth anchor axial forces with the construction conditions. The effort of this article aims to improve and develop the technique of design and construction in the coming projects having similar ground condition and supporting method.

  • PDF

Thermal and Electrical Energy Mix Optimization(EMO) Method for Real Large-scaled Residential Town Plan

  • Kang, Cha-Nyeong;Cho, Soo-Hwan
    • Journal of Electrical Engineering and Technology
    • /
    • 제13권1호
    • /
    • pp.513-520
    • /
    • 2018
  • Since Paris Climate Change Conference in 2015, many policies to reduce the emission of greenhouse gas have been accelerating, which are mainly related to renewable energy resources and micro-grid. Presently, the technology development and demonstration projects are mostly focused on diversifying the power resources by adding wind turbine, photo-voltaic and battery storage system in the island-type small micro-grid. It is expected that the large-scaled micro-grid projects based on the regional district and town/complex city, e.g. the block type micro-grid project in Daegu national industrial complex will proceed in the near future. In this case, the economic cost or the carbon emission can be optimized by the efficient operation of energy mix and the appropriate construction of electric and heat supplying facilities such as cogeneration, renewable energy resources, BESS, thermal storage and the existing heat and electricity supplying networks. However, when planning a large residential town or city, the concrete plan of the energy infrastructure has not been established until the construction plan stage and provided by the individual energy suppliers of water, heat, electricity and gas. So, it is difficult to build the efficient energy portfolio considering the characteristics of town or city. This paper introduces an energy mix optimization(EMO) method to determine the optimal capacity of thermal and electric resources which can be applied in the design stage of the real large-scaled residential town or city, and examines the feasibility of the proposed method by applying the real heat and electricity demand data of large-scale residential towns with thousands of households and by comparing the result of HOMER simulation developed by National Renewable Energy Laboratory(NREL).

시장정비사업의 효율적 실시를 위한 제도개선방안 연구 (A Study on the System Improvement Plan for an Efficient Market Maintenance Project)

  • 김승희;김영기
    • 유통과학연구
    • /
    • 제11권4호
    • /
    • pp.23-35
    • /
    • 2013
  • Purpose - This paper attempts to identify the problems and limitations of a market maintenance project conducted according to the 「Special Act for the Development of Traditional Markets and Shopping Street」 and to present a revised direction for the special law and lay the groundwork for market maintenance projects to be promoted smoothly. Research design, data, and methodology - The revised direction for the legislation and the proposal were written based on an investigation of the problems and the legal system, and proposed measures for market maintenance operation and system improvements to derive the improvements needed for market maintenance projects. Results - A market maintenance project has been conducted as a means to reinvigorate traditional markets that are economically depressed, and to revive the local economy. It was largely conducted in the form of reconstruction and redevelopment and represents the interests of landowners and merchants. Thus, it is most likely to contribute to the gradual disappearance of traditional markets. First, as part of a market maintenance project, many companies are building multipurpose buildings or high-rise residential buildings to increase profits. In these high-rise buildings, they can raise rents, which may not be affordable for some existing small businesses. To solve such problems, the large-scale store registration requirement needs to be relaxed or abolished once the market maintenance project is completed. If the large-scale store registration requirement is to be abolished, the term 'large retail store' should be changed in the 「Special Act for the Development of Traditional Markets and Shopping Street」. After registration, the Small and Medium Business Administration should train merchants, offer consultations, and support events, to the extent that the existing traditional market management modernization project permits, and further continue to manage and support its ongoing activities. However, unless large-scale store registration is abolished, adding an exception clause in the special law to relax large-scale store registration criteria, and permitting changes to building use is another option. At the end of a market maintenance project, empty stores should be purchased by the Small and Medium Business Administration, and local government, etc., at the actual construction cost, to utilize them as public rental shopping areas, which in turn may be re-utilized as a temporary market for another market maintenance project. The second problem in market maintenance projects is merchant-protection. Currently, the special law prescribes that a temporary market be created for merchants to conduct business during the rental period of a market maintenance project. Conclusions - In reality, a market maintenance project is conducted usually in big metropolitan cities with 500,000 residents or more. The main building type created under these projects is a multipurpose building. For this reason, it is very difficult to secure a location for a temporary market in the surrounding area of such a project. To solve this problem, this study suggests 'public rental shopping areas' as mentioned above.

  • PDF

충청남도 하수처리시설의 공정 및 운영 특성 분석 (Analysis of Process and Operating Characteristics for Chung Nam Province Sewage Treatment Plants)

  • 어성욱;이상진
    • 한국물환경학회지
    • /
    • 제25권4호
    • /
    • pp.553-559
    • /
    • 2009
  • Currently, small scale sewage works are getting increase in Chung Nam Province and it is strongly required for those plants to get the information of optimized procedures and technologies. Most processes for sewage works in Korea were designed for large scale plants, so many difficulties are observed in small scale sewage works. This study was conducted to evaluate the propriety of O&M and construction cost for sewage treatment plants in Chung Nam Province. The treatment results and process stability of 32 public sewage treatment plants were also investigated. It is expected to provide optimum O&M and construction cost for future small scale sewage works and improving projects of existing plants by these results. Pollution problems caused by small scale plants are usually restricted to small areas; however, in view of the high cost per unit population, treatment requirements and alternatives have to be studied carefully. In comparison to larger plants, more pronounced and different boundary conditions such as unstable influent load, per capita costs and a large variety of feasible treatment and disposal systems were considered.

A Review of Large-Scale Hydropower Project in Public Sector of Pakistan

  • Umair, Muhammad;Choudhary, Muhammad Abbas;Jahanzaib, Mirza
    • Journal of Construction Engineering and Project Management
    • /
    • 제4권4호
    • /
    • pp.47-59
    • /
    • 2014
  • Client organization inadequate project planning before awarding the contract and insufficient monitoring and control system among the parties involved create severe problems. Ultimately, large-scale projects go beyond the expected cost and time control limits. This paper discusses the major issues involved with a large-scale Hydropower Project in Pakistan Public Sector environment. The latest approved Baseline Plan of project was reviewed and analyzed using Variance Analysis and Trend Analysis techniques in Primavera project management software to assess the efforts made of the parties involved. It was found that Project is 202% Cost overrun and 25% time delays from original contract award. After analysis of baseline plan and quantification of various variance issues in impacted activities, the questionnaire survey was conducted to identify the impact of causative factors. There were almost 17 most significant causative factors identified among 60 identified factors and responsibilities are assigned accordingly. At the end recommendations are made for strategic decisions as lessons learned during project evaluation.