• 제목/요약/키워드: large-scale construction

검색결과 1,137건 처리시간 0.032초

GIS 및 지구통계학을 이용한 실시간 통합계측관리 프로그램 개발 (Development of Real Time Monitoring Program Using Geostatistics and GIS)

  • 한병원;박재성;이대형;이계춘;김성욱
    • 한국지반공학회:학술대회논문집
    • /
    • 한국지반공학회 2006년도 춘계 학술발표회 논문집
    • /
    • pp.1046-1053
    • /
    • 2006
  • In the large scale recent reclaiming works performed within the wide spatial boundary, evaluation of long-term consolidation settlement and residual settlement of the whole construction area is sometimes made with the results of the limited ground investigation and measurement. Then the reliability of evaluation has limitations due to the spatial uncertainty. Additionally, in case of large scale deep excavation works such as urban subway construction, there are a lot of hazardous elements to threaten the safety of underground pipes or adjacent structures. Therefore it is necessary to introduce a damage prediction system of adjacent structures and others. For the more accurate analysis of monitoring information in the wide spatial boundary works and large scale urban deep excavations, it is necessary to perform statistical and spatial analysis considering the geographical spatial effect of ground and monitoring information in stead of using diagrammatization method based on a time-series data expression that is traditionally used. And also it is necessary that enormous ground information and measurement data, digital maps are accumulated in a database, and they are controlled in a integrating system. On the abovementioned point of view, we developed Geomonitor 2.0, an Internet based real time monitoring program with a new concept by adding GIS and geo-statistical analysis method to the existing real time integrated measurement system that is already developed and under useful use. The new program enables the spatial analysis and database of monitoring data and ground information, and helps the construction- related persons make a quick and accurate decision for the economical and safe construction.

  • PDF

U리브 현장용접이음부 응력거동에 관한 연구 (Analysis of Stress Behavior on Field Welded Joints of U-rib in Steel Bridge)

  • 강창입;최성민;국승규;이동욱
    • 한국강구조학회 논문집
    • /
    • 제16권3호통권70호
    • /
    • pp.387-396
    • /
    • 2004
  • 본 연구에서는 강교량의 강상판에서 많이 사용되는 U리브 현장이음부에 대해 시공오차로 인한 단차의 영향을 조사하기 위해 실물 대모형에 대해 응력해석을 실시하였다. 또한 실물대모형 시험체를 제작하여 3점 휨 피로실험을 실시하였으며, 주사형전자현미경(SEM) 및 비치마크를 이용하여 피로균열 발생점 및 피로균열전파방향을 조사하였다. 실물대모형 모델에 대한 응력해석 결과, U리브의 하면 우각부에 응력이 크게 나타났으며, 단차가 커질수록 응력이 현저히 증가하는 것을 확인할 수 있었다. 실물대모형 시험체에 대한 정하중 및 피로실험에서도 U리브 하면의 우각부에 응력이 크게 나타났으며, 단차가 크면 피로수명은 단축되고 단차가 적으면 피로수명은 길어졌다. 또한 파단면 조사결과, 피로균열은 모재측 루트부에서 발생하여 용접비드 표면측으로 전파되었다.

대규모 절토사면의 효율적인 유지관리를 위한 연구 (A Study about efficient maintenance of large scale cut slope)

  • 박재영;신창건;정상
    • 한국지반공학회:학술대회논문집
    • /
    • 한국지반공학회 2009년도 세계 도시지반공학 심포지엄
    • /
    • pp.1051-1056
    • /
    • 2009
  • 절토사면 중 단일사면이 연장 200m, 높이 50m 이상일 경우 시설물 안전에 관한 특별법에 의거 2종 시설물로 지정되며 근래에 들어 광폭도로의 신설이 증가되어 2종 시설물에 속하는 절토사면의 개소수 또한 증가되는 상황이다. 대규모 절토사면의 경우 시공부터 유지관리까지 소규모에 비해 비교적 잘 이루어지는 상황이며, 보수 보강 공법 또한 잘 적용되어져 있다. 하지만 절취 면적이 넓고 대부분 식생 및 표면보호 등으로 인해 사면 내 육안조사가 용이하지 않다. 본 연구에서는 대규모 절토사면의 상태평가시 효율적인 평가 방안 및 평가결과에 따른 유지관리 방안을 논의하고자 한다.

  • PDF

AHP 기법을 응용한 건설업 협력업체 평가모형 개발에 관한 연구 (Subcontractor Evaluation Model for construction Industry Using AHP)

  • 김성수;이영훈
    • 경영과학
    • /
    • 제17권2호
    • /
    • pp.135-150
    • /
    • 2000
  • Korean construction companies are recently facing stiff competition in free market economy, and construction projects tend to be complex and large-scale. Such an environment demands that construction companies ensure specialized subcontractors. This paper suggested a subcontractor evaluation model for selection of competent subcontractors which are equipped with operational, technical and productive ability. For designing a subcontractor model, AHP method as a group decision-marking method is applied in assigning weighting indices of evaluation elements. To verify this method, actual data collected in one of construction companies are analysed statistically.

  • PDF

지하건설공사의 작업환경 개선에 관한 연구 -환기와 조명을 중심으로- (A Study on the improvement of working condition in the downtown Underground construction - Focused on the Ventilation and Lighting -)

  • 고성석;안홍섭
    • 한국안전학회지
    • /
    • 제12권2호
    • /
    • pp.119-132
    • /
    • 1997
  • According to the construction environmental changes due to the trend of large scale and complicated building construction, many construction methods(such as : TOPDOWN )are more often used. However, it is pointed out that occupational pulmonary diseases, reduction of the machinery lifetime and productivity caused to be narrow visual field and collision between the workers. Therefore, this study is mainly dealing with the views of productivity and safety improvement in order to improve work efficiency and to insure the safety in underground construction environment.

  • PDF

MODEL FOR ORGANIZATIONAL STRATEGY IN INTERNATIONAL CONSTRUCTION JOINT VENTURES: ORGANIZATIONAL ECONOMICS PERSPECTIVE

  • Yi-Hsin Lin;S. Ping Ho
    • 국제학술발표논문집
    • /
    • The 1th International Conference on Construction Engineering and Project Management
    • /
    • pp.768-773
    • /
    • 2005
  • Among various joint ventures, International Construction Joint Ventures (ICJVs) have emerged as a popular approach worldwide to developing large scale projects through international participation. A model, based on economic analysis and represented by several hypotheses obtained from the analysis, will be developed. Furthermore, we will empirically test the hypotheses/model using Structural Equation Model (SEM). This research is expected to explain why there exist different organizational forms for ICJVs, and to develop a framework for choosing appropriate forms with respect to various characteristics of ICJVs.

  • PDF

추락 사고 방지를 위한 안전대 개발 (Development of Safety Strap to Prevent Fall Accidents)

  • 임경민;장명훈
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2021년도 봄 학술논문 발표대회
    • /
    • pp.159-160
    • /
    • 2021
  • Every year on a construction site safety scale of the crash of an accident, but the large and small, accounting for more than half. In Construction Field wearing safety belts for their safety, but the impact of fracture, including the risk of injury occurs. Accordingly, the death as well as by the crash, injuries that can reduce the size of the invention was driven by safety belts.

  • PDF

성과관리시스템(EVMS) 도입을 위한 원전 건설사업비 관리체계 세분화 방안에 관한 연구 (A Study on the Cost Hierarchical System of Nuclaer Power Plant Construction Project for Introcusting Earned Vaule Management System)

  • 이상현;김우중
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2019년도 춘계 학술논문 발표대회
    • /
    • pp.230-231
    • /
    • 2019
  • The nuclear power plant construction project is large-scale, has various stakeholders and computer system, and is produced and managed a large amount of information. The domestic nuclear power plant construction project has accumulated data based on many years of experience in the system. It has the competitiveness to suggeest alternatives that meet the requirement of the client in the overseas nuclear power plant project. Earned value management, which integrates schedule and cost, is possible to risk management. It was developed the earned value management system considering the the actual data properties and types of the preceding nuclear power plant construction projects. It will be able to increase the nuclaer power plant export competieiveness. Therefore, it was palned to carry out future stuies so that it be able to complement the measure to integrate cost and schedule in consideration of actual data(quantity of activity, etc.).

  • PDF

Methods of Reviewing Constructability of Nuclear Power Plants Utilizing a Data-based Technology

  • Kim, Woo Joong;Lim, Byung Ki;Byon, SuJin
    • 국제학술발표논문집
    • /
    • The 6th International Conference on Construction Engineering and Project Management
    • /
    • pp.147-149
    • /
    • 2015
  • A nuclear power plant construction project normally involves a large construction work of which the total project cost is over 5 trillion Won, Such a large-scale construction project has the risks of schedule delay and quality degradation due to increase in project cost, because designs are changed due to design errors. The reasons for design changes during installation are 1) insufficient engineering capability of the owner, 2) information discontinuance due to the multiple package method, and 3) inefficient constructability review processes. Accordingly, this study proposes, through problem analysis, a method of developing a constructability review system that utilizes constructability review processes and a data-based technology (3D modeling) that are optimized for nuclear power plant construction projects. It also presents a method of establishing a system for reviewing constructability in which constructability review processes and a Database (3D model, Schedule, Design change Items) are linked each other.

  • PDF

초대형 워크플로우 관리 시스템의 설계 및 구현 (Design and Implementation of a Very Large-Scale Workflow Management System)

  • 안형진;김광훈
    • 인터넷정보학회논문지
    • /
    • 제10권6호
    • /
    • pp.205-217
    • /
    • 2009
  • 최근 기업들은 조직 내외의 협업 또는 협력에 의해 발생되는 거대량의 업무들을 안정적으로 처리해줄 수 있는 초대형 워크플로우 관리 시스템의 등장을 요구하고 있다. 워크플로우 벤더들은 초대형 워크플로우 서비스를 지원하는 워크플로우 관리시스템을 구현하기 위해, 하드웨어들의 추가적 확장을 통한 워크플로우 관리 시스템의 성능 향상을 모색하고 있다. 그러나 워크플로우 관리 시스템의 소프트웨어적인 아키텍처를 고려하지 않은 단순한 물리적 확장은 시스템 구축에 소요되는 시간적 또는 비용적 낭비를 야기할 수 있다. 이러한 한계를 개선하기 위하여, 본 논문에서는 워크케이스 기반 워크플로우 아키텍처를 제안하고, 해당 아키텍처를 토대로 하는 초대형 워크플로우 관리 시스템을 구현한다. 또한 워크케이스 기반 초대형 워크플로우 관리 시스템에 관한 생성 반응 시간 관련 실험을 통해서, 논리적인 소프트웨어 아키텍처의 개선이 워크플로우 관리 시스템의 초대형성에 매우 큰 영향을 미칠 수 있음을 증명하고자 한다.

  • PDF