• 제목/요약/키워드: large-scale construction

검색결과 1,138건 처리시간 0.03초

Communication Performance of BLE-based IoT Devices and Routers for Tracking Indoor Construction Resources

  • Yoo, Moo-Young;Yoo, Sung Geun;Park, Sangil
    • International Journal of Internet, Broadcasting and Communication
    • /
    • 제11권1호
    • /
    • pp.27-38
    • /
    • 2019
  • Sensors collect information for Internet of Things (IoT)-based services. However, indoor construction sites have a poor communication environment and many interfering elements that make it difficult to collect sensor information. In this study, a network was constructed between a Bluetooth Low Energy (BLE)-based IoT device based on a serverless IoT framework and a router. This experimental environment was applied to large- and small-scale indoor construction sites. Experiments were performed to test the communication performance of BLE-based IoT devices and routers at indoor construction sites. An analysis of the received signal strength indication (RSSI) graph patterns collected from the communication between the BLE-based IoT devices and routers for different testbed site situation revealed areas with good communication performance and poor communication performance due to interfering factors. The results confirmed that structural components of the building as well as the materials, equipment, and temporary facilities used in indoor construction interfere with the communication performance. Construction project managers will require improved technical knowledge of IoT, such as optimizing the router placement and matching communication between the router and workers, to improve the communication performance for large-scale indoor construction.

철도건설현장 건설기계 재해사례 및 실태분석에 관한 연구 (A Study on the Accident Case and Analysis on the Actual Condition of Construction Machinery in Railroad Construction Sites)

  • 손두현;송도흠;고성석
    • 한국안전학회지
    • /
    • 제30권5호
    • /
    • pp.20-28
    • /
    • 2015
  • Recently, railroad's preference greatly increased as the environment-friendly means of transportation as the importance in the aspects of environment and energy efficiency. So the government established the Korea Rail Network Authority which takes full charge of railroad construction in 20047 for regular railroad construction to combine major key points in the whole country with each other to be one city region by connecting them to each other to be within the commute time range of a hour and thirty minutes. And it has arranged large-scale railroad construction by establishing plans to build the 1st and 2nd national railroad networks as the national project and investing about 100 trillion won in it from 2006 to 2020. As large-scale railroad construction is promoted as the national project like this, there has been a string of safety accidents in it due to the large and complex construction project. As the government strengthened the safety accident prevention plans, safety accidents have tended to decrease in 2011. However, accidents of construction machinery have found to increase. Therefore, this study tried to investigate accident cases of the Korea Rail Network Authority for the recent 5 years and analyze accidents of construction machinery to prevent them in railroad construction sites and suggest accident prevention plans due to it by conducting, investigating, and analyzing the survey of its operators and superintendents of the construction sites and drawing the problems.

파랑작용에 의한 모래지반의 액상화에 관한 대형 수리모형실험 (Large-Scale Experiments on the Wave-Induced Liquefaction of Sandbed)

  • 강윤구;스즈끼고지로
    • 한국해양공학회지
    • /
    • 제21권3호
    • /
    • pp.26-32
    • /
    • 2007
  • A series of large-scale experiments were carried out in order to examine wave-induced liquefaction in a loosely packed sandbed, its afterward high densification and liquefaction by oscillatory pore pressure. The experiments were conducted in a Large Hydro-Geo Flume that can nearly solve the problems of scale effects of the sandbed, and the 50% sieve diameter of sand was 0.2 mm. The generation of residual pore pressure and its afterward high densification which had observed by Takahashi et al. (1999) in a wave flume experiment using fine sand with the size of 0.08 mm. As a result, the relative density of the sandbed after high densification was increased up to 79% and liquefaction by oscillatory pore pressure was not observed.

A PROPOSAL OF ENHANSED NEURAL NETWORK CONTROLLERS FOR MULTIPLE CONTROL SYSTEMS

  • Nakagawa, Tomoyuki;Inaba, Masaaki;Sugawara, Ken;Yoshihara, Ikuo;Abe, Kenichi
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 제어로봇시스템학회 1998년도 제13차 학술회의논문집
    • /
    • pp.201-204
    • /
    • 1998
  • This paper presents a new construction method of candidate controllers using Multi-modal Neural Network(MNN). To improve a control performance of multiple controller, we construct, candidate controllers which consist of MNN. MNN can learn more complicated function than multilayer neural network. MNN consists of preprocessing module and neural network module. The preprocessing module transforms input signals into spectra which are used as input of the following neural network module. We apply the proposed method to multiple control system which controls the cart-pole balancing system and show the effectiveness of the proposed method.

  • PDF

수치모형(數値模形)을 이용(利用)한 새만금 방조제(防潮堤) 축조후(築造後)의 조석(潮汐) 운동(運動) 예측(豫測) (Numerical Evaluation of Tidal Characteristic Changes after Saemangeum Sea-dike Closing)

  • 박창규;이남호
    • 농촌계획
    • /
    • 제7권1호
    • /
    • pp.61-76
    • /
    • 2001
  • During the performance of large scale tidal land reclamation project along the coast line, the construction of large scale structures such as sea-dikes, closing estuaries will induce big changes of near-shore hydraulic behavior. In this paper, its is aimed to verify the change of tide and currents after the construction of sea-dike of the Saemangeum project along the coast line. Numerical scale model "TRISULA" which development by Delft Hydraulics in the Netherlands was used. "TRISULA" is adopting the finite difference numerical scheme, and mostly using for hydro-dynamic solution along the sea and estuaries. Model boundary is covering $100{\times}170$ Km and constructed with $133{\times}337$ grids. Outer side boundary is divided 48 sections, and input 37 tidal components are gained from another big scale numerical "Yellow Sea" model. Model calibrations & verifications were performed th field tide & current datas which were measured along sea-dike alignment during Aug. $1997{\sim}Apr$. 1999. And then, numerical simulation with the tide condition dated 17 Apr. 1999 was performed with & without sea-dike construction condition for the comparison. Evaluated boundary is 20 km out-side from sea-dike alignment. Four cross lanes were set up, each of lane contains 3 points, for the comparison of sea-dike construction effects. Results showing the tidal amplitude is reducing approximately 20 cm after the construction of sea-dike during spring tide condition, amplitude 6.9m. Currents after construction of sea-dikes along the alignment, the northern part shows 50%(inner), 90%(outer) and the southern part shows 10%(inner) 50%(outer) of the currents before construction.

  • PDF

An Advanced User-Construction Requirement Within the EFD for the Development of Large-scale Information Systems

  • Park, Won-Seok;Park, Man-Gon
    • 한국멀티미디어학회논문지
    • /
    • 제6권4호
    • /
    • pp.723-735
    • /
    • 2003
  • This research focuses ell an approach for the building of a requirements model for the development of large-scale information systems. It will suggest a set of requirements engineering processes as a procedure of the implementation for building the requirements model. It will also emphasise the evaluation requirements model aimed to refine and complete the requirements model by the different user groups as a cross reference. This paper provides an advanced user-construction requirements within the Event Flow Diagram as a set of requirements engineering process.

  • PDF

서해안 해수욕장의 침식원인 분석결과와 시사점 (Study on Erosion Cause Analysis and Implication)

  • 최정훈;최진용;조영권
    • 한국관개배수논문집
    • /
    • 제19권1호
    • /
    • pp.3-18
    • /
    • 2012
  • In recent years, as environmental problems have become great concerns among many people, th loss of beach sand has become one of the highly controversial issue. Major reasons for the beach erosion within the cases of West Coast can be classified as: 1) erosion at Unyeo, Baeksajang beaches are caused by the wave refraction according to the large-scale sand dredging, 2) erosion at Kkotji, Baeksajang, and Unyeo beaches are caused by large-scale embankment construction and the coastal road construction, and 3) erosion at Chollipo and Hakampo beaches are caused by construction of small ports. Erosion in the west coast of Korea coast beach erosion control measures, include groin, zeotube, terraced stone, jetty groin, and beach nourishment. Erosion control measures initially installed to prevent erosion showed a positive effect. However, if there is no continuous source of sand, the effect of measures is fewness.

  • PDF

KS F 2278을 적용한 대면적 시료 열관류율 시험 실측에 관한 연구 (An Experimental Study on Thermal Resistance of Large-scale Specimen Using KS F 2278)

  • 문재식;이원균;김영봉;조병영;노상태
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2018년도 춘계 학술논문 발표대회
    • /
    • pp.306-307
    • /
    • 2018
  • In Korea, The thermal resistance test of window sets is performed according to KS F 2278 standard, and is performed only on a specimen size of 2000 × 2000 (mm). In this study, a standard panel measuring 4000 × 3000 (mm) size was used to measure the heat flux in each part of the specimen, and to calculate the resistance to heat transfer And to seize whether the KS F 2278 standard is applicable to large Specimen.

  • PDF

시공중 계측을 통한 어스앵커 축력변화 특성사례 연구 (Case Study of Earth Anchor Axial Force Change Characteristic through Monitoring during Construction Period)

  • 김성욱;한병원
    • 한국지반공학회:학술대회논문집
    • /
    • 한국지반공학회 2004년도 춘계학술발표회
    • /
    • pp.285-292
    • /
    • 2004
  • Earth Anchor method as a supporting system is widely used in the large scale deep excavation of urban areas or slope excavation project. Considering the application frequency of that method and catastrophe of that method under unproper construction management, we can find out many problems relevant to the domestic design and construction management of earth anchor method. When we encounter the cases of rapid increments and various decrements in earth anchor axial forces, considering the characteristic of earth anchor method, it is an essential point to catch the reasons and to prepare countermeasures. This article introduces two actual monitoring examples based on the close analyses of measured data in a typical large scale deep excavation project and slope excavation project. One is a rapidly increasing case of earth anchor axial forces with the continuous advance of incremental deformation in a geological layer interface. And another is a decreasing case of earth anchor axial forces with the construction conditions. The effort of this article aims to improve and develop the technique of design and construction in the coming projects having similar ground condition and supporting method.

  • PDF

RISK MANAGEMENT IN CIVIL CONSTRUCTION PROJECTS - FROM COST ESTIMATING PERSPECTIVE

  • Ashley Jaensch;Jian Zuo;Nicholas Chileshe
    • 국제학술발표논문집
    • /
    • The 4th International Conference on Construction Engineering and Project Management Organized by the University of New South Wales
    • /
    • pp.162-167
    • /
    • 2011
  • Construction projects are full of risks. This is particularly the case in civil construction projects that are often featured with large scale, complexity and involving a large number of participating parties. The eventuation of risks typically results in extended project durations leading to an increase in the total project budget. The consequence can be amplified considering the significant impacts of civil construction projects on the society, from economical, environmental and social perspectives. This research investigates the significance of risks within civil construction projects and approaches to deal with risks. Semi-structured interviews were undertaken with local industry practitioners in South Australia on this matter. It is found that the industry is fairly aware of risks associated with civil construction projects and subsequently has procedures in place to attempt to minimize the impacts of these risks on the project outcomes. The interview results also indicate that there is limited utilization of software for the risk management purpose from the cost estimation perspective.

  • PDF