International journal of advanced smart convergence
/
제9권3호
/
pp.59-70
/
2020
There are many limitations in applying agile methodology to projects so far. In fact, projects overlap with other development methodologies and management processes, resulting in confusing progress, while there are often cases where the benefits of agile cannot be embraced due to a lack of understanding of agile processes and the organization's inability to adapt to change. It is an important role of information system development to improve the quality of agile application projects by discovering the problems and improvements in these cases. In this paper, we analyze the differences between existing development and project management methods and agile, and analyze agile processes. The optimal agile methodology was proposed by analyzing and applying methodologies established and applied mainly by large domestic development companies. In addition, the effectiveness was verified through a questionnaire of IT experts, and the result of the questionnaire was verified to be 4.75 points on a 5-point scale.
This paper presents results from a computer-aided systems engineering application to system development projects. RDD-100 version of ALC Inc. was used in this work. The framework adopted in the study takes a unified approach to the system design and the process management associated with it, thereby coherent and full traceability between them is maintained. Conventional system engineering process supported by the tool is adopted in the system design. On the other hand, the same tool is also used to the systems engineering management to get full traceability between system design data and engineering management data. It is greatly helpful in managing many sub-contractors in the sense that the traceability can help identify the sub-project responsibility as well as the objectives of the project in coordination with interface requirements. We conclude with the advantage and limits of our unified approach.
The 6th International Conference on Construction Engineering and Project Management
/
pp.28-29
/
2015
The tire production facility is a large-scale construction with the complexity of a manufacturing process. The process utilities should be wide-ranging as an effective arrangement of them is highly important. All the necessary information should be clarified together with the manufacturer at the basic planning stage, and this design should be developed to comply with the local culture and regulations. It is important to carry out more advanced engineering in terms of process, cost and quality, even if it is difficult to standardize due to the cultural and geographical conditions and regulations. The key point is to reflect all the given conditions and make a clear design during the design stage, to eliminate the problems after the construction has begun. Another key point is the delivery system, which must be totally managed from the initial design stage until the construction stage by proven companies. Flexibility, quick action, and single responsibility will be the fundamental features in all the steps of the project.
The objective of this study is to investigate actual conditions of terrestrial vegetation part in Environmental impact statement, and to prepare a proposal for the efficiency of Environmental Impact Assessment. 13 E.I.S.s made out during 1996.6-1997.5. have been chosen and analysed with respect to scope of survey, item of survey, method of survey, and result of survey. Actual conditioins of terrestrial vegetation part in E.I.S. are summarized as follows : 1. The mean number of total participants in drawing up E.I.S. is 26.0 persons, that of participants in terrestrial vegetation part is 2.3 persons. 2. In case of planar project, the mean of scope of survey is 16.1 times as large as area of project . In case of linear project, the scope of survey has been determined arbitrarily. 3. The most part of survey has been dependent on literature, and field survey has been practically neglected. 4. Results of survey mostly missed the point that E.I.A. pursues. And proposals are as follows : 1. Participants in terrestrial vegetation part in drawing up E.I.S should be increased. 2. It is necessary to subdivide scope of survey in view of difference between planar project and linear project. 3. As for item and method of survey, field survey should be specially reinforced. 4. Several sheets of map as results of survey should be included in E.I.S. The vegetation map, the D.G.N. map, and the planting map should be included and drawn by smaller scale as possible.
As shown in the accident analysis from 2007, it has been found that causes of accidents on large-scale projects are different from those found in general construction projects. A 300-question survey regarding systematic and practical aspects of safety problems at construction sites was distributed to ten (10) different companies. Participants were to respond subjectively, so that the results could be used to assemble the first formal questionnaire survey. They were collected and compiled by an advisory committee for this study. The resulting surveys were then sent to the division chiefs of the top 100 construction companies in Korea, in order to improve the response rate. The Department of Safety & Health Direction, and the :Ministry of Labor, ROK sent the same sheets to medium and small construction companies that placed within 101-200th of all Korea construction companies. The above safety engineers were classified into four (4) levels, from 1st to 4th, followed by the project dollar amount and risk level. Formulae were developed to assign safety engineers to construction sites by engineer level, the project dollar amount, and the project risk level. Conclusions are summarized as follows: 1) Reviewing the assignment system of experienced safety engineers to large scaled projects - The more experienced the engineers assigned to a project, the higher the level of accident prevention. 2) Enforcing the assignment of advanced level safety engineers to large-scaled sites - At least one advanced-level safety engineer should be assigned to construction sites with projects valued at $15million USD (15,000,000,000). 3) For assigning safety engineers by risk level - Twenty models have been developed to calculate the number of safety engineers to be assigned by risk level. In the future, risk level for each job should be established by the government (as is now the practice in Germany).
Reliability assurance problem is an important issue in advanced company with good R&D capacity. In Korea, long-term and large-scale project for reliability improvement and certification have been conducted from 2000, 4 years ago. Generally, assurance is composed of system assurance and lot assurance. For reliability lot assurance. it is prerequisite to development reliability sampling plan with time-saving and minimum cost. In this paper, we aim to investigate previous study on reliability lot assurance focused on reliability sampling plans and propose some suggestions for the future study.
Due to locally torrential downpours which shows Increasing trend, high tide of the southern sea of Korea and etc. submerged and Inundated districts at the lowlands of Nakdong River Basins has been Increasing year by year In order to protect flood hit, it is necessary to make an early implementation of flood control dam and other flood protection works according to Nakdong River Comprehensive Development Project. In addition to the large scale comprehensive projects, local key measures, such as lowland development control, embankment reinforcement, leakage protection, maintenance and management of facilities, increase in pumping station, will be highly effective.
The Comprehensive Rural Village Development Project, a resident-led bottom-up regional development project, began in 2004. This study investigated difficulties and problems in the operation process after the completion of the project, and future improvement plans, through in-depth interviews with the former and current chairman of the steering committee, steering committee members, and office managers, targeting three regions in Jeollanam-do, 15 years after the completion of the project. As a result of the survey and analysis, it was effective in improving the living environment and characteristics of each village and revitalizing the area. And while there were well-run facilities depending on the type of project, there were also many idle facilities. In the case of communal facilities, there was a high possibility of problems in operation and management when the scale of the new building was large. Conflicts occurred between villages in the process of independently operating the area after the completion of the project. Therefore, it is necessary to provide an S/W project program to prepare for after completion. Local governments need to utilize City and County Capacity Enhancement Projects to support regional leaders to participate in educational programs after completion and provide guidance and supervision for village operations.
International Journal of Internet, Broadcasting and Communication
/
제11권1호
/
pp.27-38
/
2019
Sensors collect information for Internet of Things (IoT)-based services. However, indoor construction sites have a poor communication environment and many interfering elements that make it difficult to collect sensor information. In this study, a network was constructed between a Bluetooth Low Energy (BLE)-based IoT device based on a serverless IoT framework and a router. This experimental environment was applied to large- and small-scale indoor construction sites. Experiments were performed to test the communication performance of BLE-based IoT devices and routers at indoor construction sites. An analysis of the received signal strength indication (RSSI) graph patterns collected from the communication between the BLE-based IoT devices and routers for different testbed site situation revealed areas with good communication performance and poor communication performance due to interfering factors. The results confirmed that structural components of the building as well as the materials, equipment, and temporary facilities used in indoor construction interfere with the communication performance. Construction project managers will require improved technical knowledge of IoT, such as optimizing the router placement and matching communication between the router and workers, to improve the communication performance for large-scale indoor construction.
구조실험에서 정확성과 효율성을 높이기 위해서는 적절한 실험장치를 적용하는 것은 중요한 요소이다. 특히, 대규모의 구조 실험에서 적절한 실험장치는 비용과 시간을 절감할 수 있다. 액츄에이터와 유압잭 및 UTM은 실험체의 휨 능력을 평가하는 데 일반적으로 적용되고 있다. 그러나, 대규모 실험체에서 다점 다하중 가력하중이 적용되어야 하는 경우에는 기존의 UTM 등을 이용하는 실험방법은 정확한 하중을 가력하기에 어려움이 많다. 이를 해결하기 위하여 본 연구에서는 실험결과의 정확성과 효율성을 높이기 위하여 기존의 실험장치로 조합된 새로운 방법을 개발하였다.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.