• 제목/요약/키워드: large river

검색결과 1,019건 처리시간 0.03초

낙동강유역의 하수처리장 방류수와 인접 하류하천의 수질상관관계 분석 (Water Quality Correlation Analysis between Sewage Treated Water and the Adjacent Downstream Water in Nakdong River Basin)

  • 조현경;김상민
    • 한국수자원학회:학술대회논문집
    • /
    • 한국수자원학회 2018년도 학술발표회
    • /
    • pp.493-493
    • /
    • 2018
  • The purpose of this study was to analyze the correlation between the effluent of the sewage treatment plant (STP) and the adjacent stream located downstream of the STP in Nakdong River. The flow and water quality such as BOD, COD, SS, T-N, and T-P data for 12 STPs and adjacent downstream monitoring stations in the main stream and tributaries of Nakdong River were collected from 2012 to 2015. As a result of correlation analysis between river flow and water quality at the river water quality measurement point, COD, SS and T-P were correlated positively with river flow rate at 6, 8, and 6 points, respectively. As a result of analyzing the water quality of sewage treatment plant effluent and downstream stream, BOD and COD were correlated at 2 and 3 points, respectively. T-N showed a positive correlation at 9 points, and 7 of them had a strong positive correlation, indicating that sewage treatment effluent had a large effect on downstream streams. In this study, we found that the correlation between river flow rate and water quality factors (COD, SS, TP) was high for river water measurement points, and the sewage treatment plant effluent was correlated with the T-N value of adjacent streams.

  • PDF

SWAT 모형을 이용한 대유역 강우-유출해석: 메콩강 유역을 중심으로 (Large Scale Rainfall-runoff Analysis Using SWAT Model: Case Study: Mekong River Basin)

  • 이대업;유완식;이기하
    • 한국농공학회논문집
    • /
    • 제60권1호
    • /
    • pp.47-57
    • /
    • 2018
  • This study implemented the rainfall-runoff analysis of the Mekong River basin using the SWAT (Soil and Water Assessment Tool). The runoff analysis was simulated for 2000~2007, and 11 parameters were calibrated using the SUFI-2 (Sequential Uncertainty Fitting-version 2) algorithm of SWAT-CUP (Calibration and Uncertainty Program). As a result of analyzing optimal parameters and sensitivity analysis for 6 cases, the parameter ALPHA_BF was found to be the most sensitive. The reproducibility of the rainfall-runoff results decreased with increasing number of stations used for parameter calibration. The rainfall-runoff simulation results of Case 6 showed that the RMSE of Nong Khai and Kratie stations were 0.97 and 0.9, respectively, and the runoff patterns were relatively accurately simulated. The runoff patterns of Mukdahan and Khong Chaim stations were underestimated during the flood season from 2004 to 2005 but it was acceptable in terms of the overall runoff pattern. These results suggest that the combination of SWAT and SWAT-CUP models is applicable to very large watersheds such as the Mekong for rainfall-runoff simulation, but further studies are needed to reduce the range of modeling uncertainty.

Application of S-HGMS and chemical coupling technology in river water treatment

  • Zhao, Xin;Li, Su-qin;Han, Shuai-shuai;Zhang, Peng;Jin, Jian-jiang;Guo, Peng-hui
    • 한국초전도ㆍ저온공학회논문지
    • /
    • 제22권2호
    • /
    • pp.12-16
    • /
    • 2020
  • Circulating cooling systems consume a lot of water, and most of the water from river, which contains a large amount of Ca2+, Mg2+, et al, and has the characteristics of high hardness and large turbidity. The water can form scale on the surface of the heat exchanger and the pipes, which would reduce the heat transfer efficiency and affect the heat exchanger's length of service. In this study, the Superconducting High Gradient Magnetic Separation (S-HGMS) technology was used in river water treatment and the effects of agent A, agent B, and S-HGMS on the removal of hardness and turbidity were discussed. The results showed that the hardness removal rate reached 71.3% and the turbidity was decreased to 0.5 NTU.

하천수 취수량 분석을 위한 전력량법의 적용성 연구 (A study on the applicability of power usage method for the analysis of river water intake)

  • 백종석;김치영;차준호;송재현
    • 한국수자원학회논문집
    • /
    • 제52권12호
    • /
    • pp.975-984
    • /
    • 2019
  • 하천수의 체계적이고 통합적인 관리를 위한 필수 전제로, 하천으로 공급되고, 하천에서 방류되는 유량 등의 기초자료 확보가 필요하다. 현행되는 하천수 사용 허가제도에 의하면 2017년 허가시설 중 59.1%는 유량 계측기기가 없는 것으로 확인되었고, 특히 농업용수의 경우, 보고량의 상당부분이 사용자의 자발적인 보고로 이루어져 신뢰성 있는 자료의 확보가 어려운 실정이다. 본 연구에서는 양수장의 전력사용량을 통해 유량을 산정하는 간접 유량 계측방법을 적용하여 경제적이고 신뢰성 있는 유량자료의 확보에 대한 연구를 수행하였다. 특히, 전력량법에 의해 산정된 유량이 하천의 수위에 따라 실측 유량과 차이가 나는 점에 집중하여, 하천수위를 반영한 전력량법의 개선 및 유량자료의 정확도 향상에 대한 적용성 연구를 수행하였다. 하천수위를 고려한 전력량법으로 산정된 유량을 회귀분석, 백분율 차이, 평균 제곱근 오차 등의 상관성 분석 방법 등을 이용하여 분석한 결과, 기존의 전력량법과 비교하여 보다 더 실측 유량에 근사한 결과를 산정하는 것으로 확인하였다. 이를 통해, 양수장에서는 기존의 전력량법으로도 신뢰성 있는 유량 자료를 확보할 수 있지만, 하천의 수위 변동폭이 큰 지점에서 개선된 전력량법을 사용한다면, 보다 정확한 하천수 취수량 자료를 확보할 수 있을 것으로 기대한다.

Variations of Calcium, Bicarbonate, and Cation in the Lacustrine Zone by Interannual Differences in Up-River Discharge

  • An, Kwang-Guk;Lee, Jae-Hoon;Han, Jeong-Ho
    • 생태와환경
    • /
    • 제43권4호
    • /
    • pp.471-476
    • /
    • 2010
  • Monthly up-river discharge in the riverine zone analysis resulted in large interannual variations and differences in calcium ($Ca^{2+}$), bicarbonate ($HCO_3^-$), and cations in the lacustrine zone (Lz) of Daecheong Reservoir during the wet year (Wy, 1993) vs. dry year (Dy, 1994). Total up-river discharge in the Wy was four times that of the Dy, and the up-river discharge in July~August of the Wy was eight times greater than that of same period of Dy. Annual water retention time in the Lz showed large difference between the two years. Water residence time (WRT) was minimum when the up-river discharge peaked, whereas the WRT was maximum when the up-river discharge was at minimal condition. This peak discharge from the up-river on early July reduced residence time in the Lz on mid-July~late July. Monthly pattern, based on data of May~November, was similar between the two years, but, but mean retention time in the Wy was 50 days shorter than in the Dy. Such hydrology, up-river discharge, and WRT reduced $Ca^{2+}$, $HCO_3^-$, and cations in the Lz. At low up-river discharge in Wy during April~May, the cation content of Ca+Mg+Na+K averaged 1.17meq $L^{-1}$ (range=1.09-1.26meq $L^{-1}$), but as the up-river discharge increased suddenly, the values decreased. Seasonal fluctuations of $Ca^{2+}$ showed exactly same pattern with bicarbonate ion of $HCO_3^-$. The minimum $Ca^{2+}$ (0.03meq $L^{-1}$) was occurred in the early August of wet year and coincided with the minimum $HCO_3^-$. These results suggest that the magnitude of variation in $Ca^{2+}$, bicarbonate, and cations in the lacustrine zone is directly determined by the peak magnitude of up-river discharge. The magnitude of up-river discharge determined water retention time and the magnitude of ionic dilution in the lacustrine zone, resulting in functional changes of the ecosystem.

Time Lags between Hydrological Variables and Phytoplankton Biomass Responses in a Regulated River (the Nakdong River)

  • Kim, Myoung-Chul;Jeong, Kwang-Seuk;Kang, Du-Kee;Kim, Dong-Kyun;Shin, Hyun-Suk;Joo, Gea-Jae
    • Journal of Ecology and Environment
    • /
    • 제32권4호
    • /
    • pp.221-227
    • /
    • 2009
  • This study describes time lag responses between hydrological variables and phytoplankton biomass in a regulated river system, the lower Nakdong River in South Korea. The lower Nakdong is a typical flow-controlled lotic system, and its limnological characteristics are influenced by climatic variation such as monsoons and summer typhoons. Mean rainfall in the area during summer is about 1,200 mm, which comprises >60% of annual rainfall. Our results show that the regulation of flow in the Nakdong by multi-purpose dams from 1995 to 2004 affected phytoplankton dynamics. Diatom blooms occurred in winter, when the limited discharge allowed for proliferation of the phytoplankton community. Using multiple regression analysis, we detected significant time-delayed relationships between hydrological variables and phytoplankton biomass. These results may be useful for water resource managers, and suggest that 'smart flow' control would improve water quality in large regulated river systems of the Republic of Korea.

섬진강 하구의 환경가치 추정 (Measurement of the Environmental Value of the Seomjin-River Estuary)

  • 유승훈
    • 환경정책연구
    • /
    • 제6권2호
    • /
    • pp.1-25
    • /
    • 2007
  • 본 논문에서는 비교적 잘 보존되어 있지만 개발의 위협에 직면해 있는 섬진강 하구의 환경가치를 추정하고자 한다. 특히 하구의 4가지 속성에 대한 가치를 도출하기 위해 다속성 효용이론에 근거한 조건부 가치측정법(CVM)을 적용하되, CVM 연구에서 지켜야 할 다양한 지침을 엄격하게 준수하면서 가구조사를 시행하였다. 구체적으로 하구 인근지역(광양, 순천, 여수, 하동, 남해) 300가구와 7개 대도시 지역(서울, 부산, 인천, 대구, 대전, 광주, 울산) 350 가구를 무작위로 추출하여 일대일 개별면접을 통해 섬진강 하구 관리방안에 대해 얼마나 지불할 의사가 있는지를 물었다. 응답자들은 전반적으로 조건부 시장을 잘 받아들였으며, 가구당 연 평균 지불의사액은 하구 인근지역의 경우 5,763원, 7개 대도시 지역의 경우 1,883원으로 분석되어 지역에 따라 큰 차이가 났다. 이 값을 해당 지역의 모집단으로 확장하였더니, 각각 연간 15.2억 원 및 140.5억 원이었다. 이 값은 하구의 보존 대 개발과 관련된 계획 수립 및 의사결정에 있어서 중요한 정량적 정보로 활용될 수 있을 것이다.

  • PDF

하천수 열원 2단 압축 열펌프시스템의 부분부하 운전특성에 관한 실험적 연구 (An Experimental Study on the Part-Load Performance of a River Water Source 2-Stage Heat Pump)

  • 김지영;백영진;이영수;나호상
    • 대한기계학회:학술대회논문집
    • /
    • 대한기계학회 2007년도 춘계학술대회B
    • /
    • pp.1964-1968
    • /
    • 2007
  • The river water heat source heat pump has the advantage in the performance compared to air source heat pump. Although its better performance, the large temperature difference between load and source makes system performance worse by nature. In this study, 2-stage compression is considered as the solution of this problem. Generally, heat pump is designed for maximum capacity rate, but it actually operates at part load condition in many cases. Therefore, an information on the part-load character is very important in view of the system overall performance. In this study, part-load performance tests of a R134a 2-stage compression heat pump were carried out over the river water and supply heating water temperature changes. The experimental results show that the system performance is influenced by the part load rates, river water temperature, load temperature, etc.

  • PDF

분당선 철도 한강 하저터널에서 대구경 쉴드장비 선정 (Determination of a large shield TBM for a tunnel under the Han river in the Bundang railway)

  • 김용일;김동현;조상국
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2003년도 추계학술대회 논문집(II)
    • /
    • pp.569-578
    • /
    • 2003
  • In this paper a determination of the optimal excavation method and machine type for a tunnel under the Han river between the Sungsoo-dong, Sungdong-Gu and the Chungdaw-dong, Kangnam-Gu in the Bundang railway. The geological investigation results show that some fractured zones exist locally under the northern boundary of the Han river bed, but the other regions consist mostly of hard rocks of good quality in the tunnel excavation level. Also, a hign water pressure of $5kgf/cm^2$ and a flash inflow of river water due to old boring holes are expected during tunnel excavation. A EPB shield TBM is selected as a optimal excavation machine for the Han river tunnel considering the geological and ,site conditions.

  • PDF

소수력발전입지의 수계별 설계변수 특성(I) (Design Parameters of Small Hydro Power Sites for River Systems(I))

  • 박완순;이철형
    • 한국태양에너지학회 논문집
    • /
    • 제30권4호
    • /
    • pp.86-91
    • /
    • 2010
  • The characteristics of hydrologic design parameters for small hydro power(SHP) sites located in four major river systems have been studied. The model, which can predict flow duration characteristic of stream, was developed to analyze the variation of inflow. And another model to predict hydrologic performance for SHP plants is established. The results from hydrologic performance analysis for SHP sites located on five major river systems based on the models developed in this study show that the specific design flowrate and specific output of SHP site have large difference between the river systems. The load factor, however, have small difference compared with specific design flowrate and specific output for all river systems. Also, it was found that the models developed in this study can be used to predict the primary design specifications of SSHP plants effectively.