• 제목/요약/키워드: large diameter dilled shaft

검색결과 1건 처리시간 0.015초

선단유압재하시험을 이용한 단층파쇄대에 설치된 대구경 현장타설말뚝의 선단지지력 측정 사례 (Case Studiy on Measurement of End Bearing Capacity for Large Diameter Drilled Shaft Constructed in Fault Zone using Loading Test)

  • 정창규;김태훈;정성민;황근배;최용규
    • 한국지반공학회:학술대회논문집
    • /
    • 한국지반공학회 2004년도 춘계학술발표회
    • /
    • pp.74-81
    • /
    • 2004
  • In this study, static end loading tests with load transfer measurement were accomplished for large diameter drilled shaft constructed in fault zone. Yield pile capacity (or ultimate pile capacity) from load-settlement curve was determined and axial load transfer behavior was measurd. The end bearing capacity was increased 2 times due to grouting the toe ground under pile base.

  • PDF