• Title/Summary/Keyword: labor cost

Search Result 1,117, Processing Time 0.026 seconds

A study on the relationship between cost fluctuation and cost elements -focused on defense R&D project- (원가변동과 원가 비목 간 영향력에 관한 연구 -국방연구개발사업을 중심으로-)

  • Kang, Kyung-Mok
    • Journal of the Korea Convergence Society
    • /
    • v.9 no.3
    • /
    • pp.223-230
    • /
    • 2018
  • This study analyzes the cost fluctuation between cost in contract stage and cost in adjustment stage in defense R&D project. This research shows that certain costs hold with the cost fluctuation and their degree of influence. The results of first analysis show that 13 out of 17 costs have a relationship with the cost fluctuation. The estimate of direct labor cost is positive and significant at the 0.1% level(direct labor = 1.022, t = 38.355). The estimate of amount of cost paid to subcontractor is positive and significant at the 1% level(amount paid to subcontractor = 0.942, t = 51.894). The results of second analysis show that all the direct costs have a relationship with the cost fluctuation(The fact that cost system is focused on direct labor cost is a consideration in this analysis). The estimate of direct labor cost is positive and significant at the 0.1% level(direct labor = 2.014, t = 21.787). The estimate of amount of cost paid to subcontractor is positive and significant at the 0.1% level(amount of cost paid to subcontractor = 1.068, t = 15.636). This finding supports a proposal theory that cost system is focused on direct labor cost through actual proof analysis and an inducement that amount of cost paid to subcontractor is a way to reduce the R&D cost.

A Study of the Decommissioning Cost Estimation for Nuclear Facilities (원자력 시설 해체비용 산정에 관한 고찰)

  • 이동규;정관성;이근우;오원진
    • Proceedings of the Korean Radioactive Waste Society Conference
    • /
    • 2004.06a
    • /
    • pp.85-96
    • /
    • 2004
  • This paper is to study on the decommissioning cost estimation for nuclear facilities of advanced nuclear organizations and countries for deriving the cost factors to be taken considerations into accomplishing decommissioning projects. Of cost categories producing the factors of decommissioning costs, dismantling and waste processing & disposals activities are examined to increase the its costs. Of labor, materials and other costs categories, labor costs are summarized to have overall majorities in the decommissioning cost factors. The main parameters of all factors affecting the decommissioning costs are analyzed as work difficulty, regional labor costs, peripheral cost, disposal cost and final burial costs.

  • PDF

Analysis of Construction Cost Fluctuation Trends and Features on Apartment Housing

  • Park, Wonyoung;Kang, Tai-Kyung;Baek, Seung-Ho;Lee, Yoo-Sub
    • Journal of the Korea Institute of Building Construction
    • /
    • v.12 no.6
    • /
    • pp.624-635
    • /
    • 2012
  • Construction projects, including housing, are carried out over long periods of time. According to changes to the construction period, the cost of input materials and wages also changes. Therefore appropriate management is important in order to minimize cost risks caused by fluctuations in prices. In Korea, housing units are usually sold in lots prior to construction completion. Therefore, careful management of input elements such as materials and equipment that are sensitive to price fluctuations is very important. This study deals with how the price fluctuation of materials, labor, and equipment influences the change of housing cost and seeks a way for cost management through identifying key resources sensitive to price fluctuation. As a result, a change to the housing cost index multiplies depending on cost changes of materials and labor together. Labor costs are a major factor on the housing cost index. In addition, certain types of materials and labor input to housing construction greatly influence price fluctuations. Thus, it is found that managing those main cost factors is the key for effective cost management.

Analysis of Actual Labor and Productivity for Based Work Crew Standard of Cement Liquid Watertight Construction (시멘트 액체방수 공사의 작업조 기반 품셈을 위한 생산량 및 노무량 분석)

  • Ha, Gee-Joo;Choi, Min-Kwon;Yi, Dong-Ryul;Ha, Min-Su;Ha, Jae-Hoon;Kim, Oe-Gun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2009.05b
    • /
    • pp.171-174
    • /
    • 2009
  • The standard estimation system, used to estimate the predetermined cost of construction work, is measured by the standard and typical construction methods and field conditions. And the standard estimation system is applied to basic data for the measuring of construction cost, such as the consumed quantity of material, labor hours, and machinery cost. However it does not reflect sufficiently for the diversity and reality of constructions work Therefore, this study is recognized the necessity of new cost estimation models for the rational construction cost estimation. To improve estimation technique and construction ability, it was analyzed labor hours, production volume based on the work crew in construction work.

  • PDF

Collection and Utilization of the Construction Labor Information Using PDA and Barcode (PDA 및 바코드 기술을 이용한 건설 노무정보의 수집 및 활용)

  • Oh Se-Wook;Kim Young-Suk;Lee Jun-Bok;Kim Han-Soo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.5 no.5 s.21
    • /
    • pp.65-75
    • /
    • 2004
  • Labor management has been considered as an important task in construction industry. However, labor management has not yet been systematically performed because of the wide variety of factors of construction industry such as the field work, the complexity of the work process, the daily employment. Most of the present labor managements are performed to collect the information of the number of labors input during the work period, and to calculate labor cost. The information of activities performed by labors can be effectively used to analyze project status related to schedule, cost and productivity, but the present labor management systems are not based on the activities. The main objective of this research is to develop a labor information management system using IT tools in order to measure the number of labors input on the activities, and to convert the labor information into productivity data. It is anticipated that the effective use of the developed system would be able to effectively assist the scheduling and cost management of a project.

The Effects of the workforce Age Structure on Productivity or Labor Costs (사업체 근로자의 연령구성이 생산성과 인건비에 미치는 영향)

  • Kim, Ki-Min
    • Management & Information Systems Review
    • /
    • v.37 no.1
    • /
    • pp.123-138
    • /
    • 2018
  • In this paper, we use panel dataset from Korean linked worker-firm to analyse the effects of the workforce age structure on the productivity or labor costs. We measure 'labor productivity' as added value per capita, 'cost of labor' as labor cost per capita and estimate a dynamic panel model to study the effects of the workforce age structure on the productivity or labor costs. Empirical analysis results show that the workforce age structure is positively related to productivity and labor costs, but only up to the aged of 35-39. That is, we find that an increase in the proportion of younger workers or elder workers rather than the aged 35-39 has a negative effect on productivity and labor cost. In particular, the difference between the estimation coefficient of productivity and labor cost when the share of workers aged 50 or older is increased instead of the aged 35-39 is higher than the difference between the estimation coefficient of productivity and labor cost when the share of workers aged 30 or younger is increased instead of the aged 35-39. Our results exhibit that it is reasonable for firms to worry about declining productivity of elderly workers, whereas firms already used older workers efficiently, such as by adjusting their labor costs.

Investigation on Selective Mechanization for Wet Season Rice Cultivation in Bangladesh

  • Islam, AKM Saiful;Islam, Md Tariqul;Rahman, Md Shakilur;Rahman, Md Abdur;Kim, Youngjung
    • Journal of Biosystems Engineering
    • /
    • v.41 no.4
    • /
    • pp.294-303
    • /
    • 2016
  • Purpose: This study aimed to evaluate the profitability of four selective mechanization systems in rice cultivation. Methods: Field experiments were conducted in the farmers' field during the wet season (June to November) of 2015 in Bangladesh. Mechanization systems were applied to evaluate four different selective levels (treatment) in eleven consequent operations. Seedlings were raised in a traditional seedbed and trays for manual and mechanical transplanting, respectively. Land preparation, irrigation, fertilizer, pesticide, carrying, and threshing and cleaning operations were performed using the same method in all the experimental plots. The mechanical options in the transplanting, weeding, and harvesting operations were changed. The mechanization systems were $S_1$ = hand transplanting + hand weeding + harvesting by sickle, $S_2$ = mechanical transplanting + Bangladesh Rice Research Institute (BRRI) weeder + reaper, $S_3$ = mechanical transplanting + BRRI power weeder + reaper, and $S_4$ = mechanical transplanting + herbicide + reaper. This experiment was performed in a randomized complete block design with four replications. Power tiller, rice transplanter, BRRI weeder, BRRI power weeder, self-propelled reaper, BRRI open drum thresher, and BRRI winnower were used in the respective operations. Accordingly, the techno-economic performances of the different technologies were calculated and compared with those of the traditional system. Results: The mechanically transplanted plot produced 6-10% more yield than the hand transplanted plot because of the use of tender-aged seedlings. Mechanical transplanting reduced 61% labor and 18% cost compared to manual transplanting. The BRRI weeder, BRRI power weeder, and herbicide application reduced 74, 91, and 98% labor, respectively. The latter also saved 72, 63, and 82% cost, respectively, compared to hand weeding. Herbicide application reduced the substantial amount of labor and cost in the weeding operation. Mechanical harvesting also saved 96% labor and 72% cost compared to the traditional method of harvesting using sickle. Selective mechanization saved 15-17% input cost compared to the traditional method of rice cultivation. Conclusions: Mechanical transplanting with the safe use of herbicide and harvesting by reaper is the most cost- and labor-saving operation. The method might be the recommended set of selective mechanization for enhancing productivity.

A case for productivity improvement by time study in high tech industry (하이테크 부품산업에서 작업분석/실행을 통한 생산성 향상의 프로젝트 방법론 연구)

  • Lee, Won-Jae;kim, Joong-Hoi;Kang, Sung-Woo;Kang, Kyung-Sik
    • Journal of the Korea Safety Management & Science
    • /
    • v.17 no.1
    • /
    • pp.225-230
    • /
    • 2015
  • Productivity is the essential comparative advantage in high tech industry company in 21 century. These company endless endeavor for low cost production. Low cost production can be led by low facility operation cost and low labor cost. But reducing facility operation cost arise much investment. Thus many high tech company drive reduction of labor cost. These article suggest model for reducing labor cost and prove a effect by example of some company.

A Study on the Cost-Volume-Profit Analysis Adjusted for Learning Curve (C.V.P. 분석에 있어서 학습곡선의 적용에 관한 연구)

  • 연경화
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.5 no.6
    • /
    • pp.69-78
    • /
    • 1982
  • Traditional CVP (Cost-Volume-Profit) analysis employs linear cost and revenue functions within some specified time period and range of operations. Therefore CVP analysis is assumption of constant labor productivity. The use of linear cost functions implicity assumes, among other things, that firm's labor force is either a homogenous group or a collection homogenous subgroups in a constant mix, and that total production changes in a linear fashion through appropriate increase or decrease of seemingly interchangeable labor unit. But productivity rates in many firms are known to change with additional manufacturing experience in employee skill. Learning curve is intended to subsume the effects of all these resources of productivity. This learning phenomenon is quantifiable in the form of a learning curve, or manufacturing progress function. The purpose d this study is to show how alternative assumptions regarding a firm's labor force may be utilize by integrating conventional CVP analysis with learning curve theory, Explicit consideration of the effect of learning should substantially enrich CVP analysis and improve its use as a tool for planning and control of industry.

  • PDF

Selection of a Probability Distribution for Modeling Labor Productivity during Overtime

  • Woo, Sung-Kwon
    • Korean Journal of Construction Engineering and Management
    • /
    • v.6 no.1 s.23
    • /
    • pp.49-57
    • /
    • 2005
  • Construction labor productivity, which is the greatest source of variation in overall construction productivity, is the critical factor for determining the project performance in terms of time and cost, especially during scheduled overtime when extra time and cost are invested. The objective of this research is to select an appropriate type of probability distribution function representing the variability of daily labor productivity during overtime. Based on the results of statistical data analysis of labor performance during different weekly work hours, lognormal distribution is selected in order to take advantage of easiness of generating correlated random numbers. The selected lognormal distribution can be used for development of a simulation model in construction scheduling, cost analysis, and other applications areas where representation of the correlations between variables are essential.