• Title/Summary/Keyword: just-in-time management

Search Result 352, Processing Time 0.028 seconds

The Effect of Supply Chain Management on Total Quality Management: An Application of Just-in-Time (JIT) Practices

  • ABDELRAHEEM, Abubkr Ahmed Elhadi;HUSSIEN, Asaad Mubarak
    • The Journal of Asian Finance, Economics and Business
    • /
    • 제10권1호
    • /
    • pp.9-17
    • /
    • 2023
  • The study attempted to answer the questions related to the expected effects of supply chain management variables which include: Partnership with Suppliers (PS), Relationships with Customers (RC), Quality of Information Exchange (QIE), and Postponement (P), as independent variables, total quality management (TQM) as a dependents variable, and just in time (JIT) as a mediator variable. The study relies on the descriptive approach by conducting an empirical study on commercial companies in Riyadh Governorate in the Kingdom of Saudi Arabia. Through the methods of descriptive and analytical statistics represented in exploratory factor analysis (EFA), confirmatory factor analysis (CFA), and structural equation modeling (SEM)), using the AMOS and SPSS programs, the results of the applied study indicated that: There is an effect of supply chain management variables (quality of information exchange, Postponement) on just in time (JIT), there is no effect of the supply chain variables (relationship with customers, partnership with suppliers) on just in time (JIT), there is an indirect effect of the quality of information exchange, Postponement, partnership with suppliers, the relationship with customers on total quality management (TQM), relationship with customers affect on total quality management (TQM) indirectly, just in time (JIT) does not affect total quality management (TQM)

GSCM전략과 사업성과에 관한 연구 -두리비전 사례를 중심으로- (A Study on the GSCM Strategy and Business Performance - Focus on DOOLEE VISION Case -)

  • 김창봉
    • 통상정보연구
    • /
    • 제8권1호
    • /
    • pp.325-336
    • /
    • 2006
  • This paper examines the global supply chain management strategy and business performance of Doolee Vision Co. Ltd.. Based on the analysis of eighty-seven cases, the following results were found. First, it was found that just-in-time of GSCM strategy of firm have a positive influences on the business performance in transformation sector. Second, just-in-time of GSCM strategy of firm have a positive influences on the business performance in custody sector. Third, just-in-time of GSCM strategy of firm have a positive influences on the business performance in order response and support sector. Forth, just-in-time of GSCM strategy of firm have a positive influences on the business performance in customs sector. Fifth, just-in-time of GSCM strategy of firm have a positive influences on the business performance in customer service sector. However, several limitations, such as measurement for intra-industry homogeneity, measurement for flexibility of global supply chain management strategy, and measurement for business performance of global supply chain management, that make the preceding conclusions be considered preliminary.

  • PDF

다수의 경쟁이 존재하는 환경에서 적시 스케줄링에 관한 연구 (Just-in-time Scheduling with Multiple Competing Agents)

  • 정대영;최병천
    • 한국경영과학회지
    • /
    • 제37권1호
    • /
    • pp.19-28
    • /
    • 2012
  • We consider a multi-agent scheduling problem such that each agent tries to maximize the weighted number of just-in-time jobs. Two objectives are considered : the first is to find the optimal solution for one agent with constraints on the other agents' weight functions, and the second is to find the largest set of efficient schedules of which corresponding objective vectors are different for the case with identical weights. We show that when the number of agents is fixed, the single machine case with the first objective is NP-hard in the ordinary sense, and present the polynomial- time algorithm for the two-machine flow shop case with the second objective and identical weights.

SUCCESS FACTORS FOR JIT MANAGEMENT OF PRIMARY COMMODITY SUPPLY CHAINS IN AUSTRALIA

  • Kim Tae Ho;Wegener Malcolm
    • 대한안전경영과학회지
    • /
    • 제6권3호
    • /
    • pp.141-152
    • /
    • 2004
  • Supply chains for agricultural commodities with their various constraints such as production lead time, seasonal production, and methods of storage are limited in the extent to which techniques like Just-in-Time (JIT) inventory management can be applied. It is beyond the ability of producers to control harvest time and many agricultural products are perishable so that they can incur exceptional losses in storage if they are not handled correctly. This is a source of additional costs and inefficiency in supply chain management. The purpose of this study is to reduce or eliminate such sources of loss and inefficiency and to identify success factors for the JIT inventory management system where it can be applied for agricultural products. Where JIT techniques can be applied in supply chain management for agricultural products, costs such as transportation, inventory, and storage losses can be reduced with concurrent increases in efficiency. In the paper, some of the problems associated with applying JIT inventory control methods in supply chain management for agricultural commodities will be reported through a series of case studies.

SUCCESS FACTORS FOR JIT MANAGEMENT OF PRIMARY COMMODITY SUPPLY CHAINS IN AUSTRALIA

  • Kim, Tae-Ho;Malcolm Wegener
    • 대한안전경영과학회:학술대회논문집
    • /
    • 대한안전경영과학회 2004년도 춘계학술대회
    • /
    • pp.191-201
    • /
    • 2004
  • Supply chains for agricultural commodities with their various constraints such as production lead time, seasonal production, and methods of storage are limited in the extent to which techniques like Just-in-Time (JIT) inventory management can be applied. It is beyond the ability of producers to control harvest time and many agricultural products are perishable so that they can incur exceptional losses in storage if they are not handled correctly. This is a source of additional costs and inefficiency in supply chain management. The purpose of this study is to reduce or eliminate such sources of loss and inefficiency and to identify success factors for the JIT inventory management system where it can be applied for agricultural products. Where ]IT techniques can be applied in supply chain management for agricultural products, costs such as transportation, inventory, and storage losses can be reduced with concurrent increases in efficiency. In the paper, some of the problems associated with applying ]IT inventory control methods in supply chain management for agricultural commodities will be reported through a series of case studies.

  • PDF

Just-in-time하의 단일 버퍼를 갖는 생산시스템의 칸반 운영에 관한 연구 (An efficient kanban operation method in just-in-time production system with a single buffer)

  • 김동민;이종태
    • 한국경영과학회:학술대회논문집
    • /
    • 대한산업공학회/한국경영과학회 1996년도 춘계공동학술대회논문집; 공군사관학교, 청주; 26-27 Apr. 1996
    • /
    • pp.294-296
    • /
    • 1996
  • JIT(just-in-time) 생산시스템은 제조라인의 재공품 재고량을 최소화하고, 필요한 품목을 적시에 필요한 양만큼만 생산하여 공급하는 것을 목적으로 한다. 이러한 시스템은 사용하는 칸반의 수에 따라 single-card kanban system과 two-card kanban system으로 구별할 수 있다. 또한 각 공정이 입력버퍼(input buffer)와 출력버퍼(output buffer)를 갖는 경우와 공정간에 하나의 버퍼를 갖는 경우로 나누어 볼 수 있다. 본 연구는 기계간의 물류(material handling)가 필요한 시점에 즉시 이루어진다는 가정하에 기계간 버퍼가 하나이고, 그 버퍼의 용량이 1인 경우의 single-card kanban의 효율적인 운용방안을 개발하였다. 본 연구의 목적은 생산지시칸반의 회수시기를 적절히 조절하여 생산라인의 이용효율(utilization)을 극대화하고자 하는 것이다. 칸반회수시기 결정을 위한 상황분석의 범위를 10대의 기계로 제한하여 시뮬레이션에 의해 분석하였다. 기존의 칸반운영방식과 생산라인에서의 재고를 최소화하는 운영 알고리듬, 그리고 생산기계의 효율을 최대화할 수 있는 운영 알고리듬을 개발하여 비교.분석하였다.

  • PDF

A Multi-Objective Differential Evolution for Just-In-Time Door Assignment and Truck Scheduling in Multi-door Cross Docking Problems

  • Wisittipanich, Warisa;Hengmeechai, Piya
    • Industrial Engineering and Management Systems
    • /
    • 제14권3호
    • /
    • pp.299-311
    • /
    • 2015
  • Nowadays, the distribution centres aim to reduce costs by reducing inventory and timely shipment. Cross docking is a logistics strategy in which products delivered to a distribution centre by inbound trucks are directly unloaded and transferred to outbound trucks with minimum warehouse storage. Moreover, on-time delivery in a distribution network becomes very crucial especially when several distribution centres and customers are involved. Therefore, an efficient truck scheduling is needed to synchronize the delivery throughout the network in order to satisfy all stake-holders. This paper presents a mathematical model of a mixed integer programming for door assignment and truck scheduling in a multiple inbound and outbound doors cross docking problem according to Just-In-Time concept. The objective is to find the schedule of transhipment operations to simultaneously minimize the total earliness and total tardiness of trucks. Then, a multi-objective differential evolution (MODE) is proposed with an encoding scheme and four decoding strategies, called ITSH, ITDD, OTSH and OTDD, to find a Pareto frontier for the multi-door cross docking problems. The performances of MODE are evaluated using 15 generated instances. The numerical experiments demonstrate that the proposed algorithm is capable of finding a set of diverse and high quality non-dominated solutions.

적시생산방식을 이용한 가구공사 개선방안에 관한 연구 (A Study on Analysis and Improvement of Furniture Work for Just-in-Time)

  • 김현우;송영웅;안재봉;최윤기
    • 한국건설관리학회논문집
    • /
    • 제5권4호
    • /
    • pp.71-78
    • /
    • 2004
  • 최근 우리나라의 건설 환경은 도심지 내 대형 건설공사가 증가하는 추세이며, 건설공사 관리 요소 중 기존 골조공사의 관리 중요성에 더하여 마감공사관리의 중요성이 부각되고 있다. 마감공사의 체계적인 관리를 위해서는 마감공사의 공정 중 자재 양중 측면, 공사기간 측면에서 많은 부분을 차지하고 있는 세대 내 가구공사의 관리체계 정립이 필수적이라 할 수 있다. 본 연구에서는 초고층 주거건축을 위한 마감공사 중 양중 측면에서 주 고려 대상이 되고 있는 가구공사의 관리체계를 정립하기 위하여, 적시생산(Just-In-Time)방식과 린건설(Lean Construction)의 개념을 도입하였다. 이를 바탕으로 가구공사의 프로세스를 분석하고 그에 따른 개선방안을 제시하였다. 이러한 분석과 개선방안의 제시는 마감공사의 원활한 흐름을 유도할 수 있으며, 또한 공사기간을 단축하고 공사비용을 절약함으로써 프로젝트의 성공에 기여할 수 있다.

적시생산 관리시스템에 관한 연구 - 철근공사를 중심으로 - (A Study on Prototype of Just In Time Production Management System)

  • 이규현;최인성
    • 한국건축시공학회지
    • /
    • 제5권4호
    • /
    • pp.153-164
    • /
    • 2005
  • This study aims at establishing JIT production management system to enable manage the resources input into from procurement through construction based on correct identification of the process, an analysis on the amount of input materials and information sharing. This study has focused on the process control and working process of rebar work in domestic apartment house construction where the overall scope of Process from the planning phase to the construction phase has been analyzed in this study. Also construction phase was selected for the application of a sample case. A basic model for JIT production was generated with these processes. Furthermore A questionnaire and the on-site survey with process, checklist and control data were prepared and performed for the application of JIT production management model into rebar work. The governing scopes of JIT production management system include process management, material management, yard loading and moving management and inventory control, and the operation of each control item