• 제목/요약/키워드: interval chart

검색결과 118건 처리시간 0.024초

Markovian EWMA Control Chart for Several Correlated Quality Characteristics

  • Chang, Duk-Joon;Kwon, Yong-Man;Hong, Yeon-Woong
    • Journal of the Korean Data and Information Science Society
    • /
    • 제14권4호
    • /
    • pp.1045-1053
    • /
    • 2003
  • Markovian EWMA control chart for simultaneously monitoring mean vector of the several correlated quality characteristics is investigated. Properties of multivariate Shewhart chart and EWMA chart are evaluated for matched FSI (fixed sampling interval) and VSI(variable sampling interval) scheme. We obtained VSI EWMA chart is more efficient than Shewhart chart for small or moderate shifts. And, we obtained stablized numerical results with Markov chain method when the number of transient state is greater than 100.

  • PDF

Performances of VSI Multivariate Control Charts with Accumulate-Combine Approach

  • Chang, Duk-Joon;Heo, Sun-Yeong
    • Journal of the Korean Data and Information Science Society
    • /
    • 제17권3호
    • /
    • pp.973-982
    • /
    • 2006
  • Performances of variable sampling interval(VSI) multivariate control charts with accumulate-combine approach for monitoring mean vector of p related quality variables were investigated. Shewhart control chart is also proposed to compare the performances of CUSUM and EWMA charts. Numerical comparisons show that performances of CUSUM and EWMA charts are more efficient than Shewhart chart for small or moderate shifts, and VSI chart is more efficient than fixed sampling interval(FSI) chart. We also found that performances of the CUSUM or EWMA chart with accumulate-combine approach are substantially efficient than those of Shewhart chart.

  • PDF

Properties of VSI CUSUM Chart for Monitoring Dispersion Matrix

  • Chang, Duk-Joon;Shin, Jae-Kyoung
    • Journal of the Korean Data and Information Science Society
    • /
    • 제15권4호
    • /
    • pp.1003-1010
    • /
    • 2004
  • Properties of the variable sampling interval(VSI) CUSUM chart for monitoring dispersion matrix of related quality characteristics are investigated. Performances of the proposed charts are evaluated for matched fixed sampling interval(FSI) and VSI charts in terms of average time to signal(ATS) and average number of samples to signal (ANSS). Average number of swiches(ANSW) of the proposed VSI Shewhart and CUSUM charts are also investigated.

  • PDF

변량표본추출간격을 이용한 (equation omitted)x-R 관리도의 연구 (A study on the (equation omitted)x-R control chart with variable sampling interval scheme)

  • 이희춘
    • 산업경영시스템학회지
    • /
    • 제18권33호
    • /
    • pp.143-151
    • /
    • 1995
  • In this design the sampling interval that each sampling time changes according to the valuse of the previous to sample statistics, sample mean and ranges. The VSI scheme uses large sample if the sample statistics appear near in side the control limits and smaller sample otherwise. The efficiency of the VSI scheme is compare to the FSI. It is shown that VSI control chart improves the confidence of the procedure and performens better than FSI control chart.

  • PDF

VSI ${\overline{X}}$-CRL 합성관리도의 경제적 설계 (Economic design of VSI ${\overline{X}}$-CRL Synthetic Control Chart)

  • 송서일;박현규;정혜진
    • 산업경영시스템학회지
    • /
    • 제28권4호
    • /
    • pp.85-93
    • /
    • 2005
  • This paper is designed a VSI ${\overline{X}}$-CRL synthetic control chart in aspect of economy. We found the optimal sampling interval and various control limit factors under various cost parameters using cost function, proposed Lorenzen and Vance. Optimal design parameters include the sample size, control limit width, sampling interval, CRL/S chart control limit; L. Comparison and analysis of cost parameters are applied between synthetic VSI ${\overline{X}}$-CRL chart and FSI ${\overline{X}}$-CRL chart. The result of this paper shows that VSI ${\overline{X}}$-CRL chart brings cost-cutting effect of 3.04% control expense less than FSI control chart. It may not be difficult to establish the optimal economic control parameters to apply the practical cost parameters in the field.

VSI 런-규칙 관리도의 경제적-통계적 설계 (Economic-Statistical Design of VSI Run Rules Charts)

  • 강분규;임태진
    • 품질경영학회지
    • /
    • 제38권2호
    • /
    • pp.190-201
    • /
    • 2010
  • This research proposes a method for designing VSI (Variable Sampling Interval) control charts with supplementary run rules. The basic idea is to apply various run rules and the VSI scheme to a control chart in order to increase the sensitivity. The sampling process of the VSI run rules chart is constructed by Markov chain approach. A procedure for designing the VSI run rules chart is proposed based on Lorenzen and Vance's model. Sensitivity study shows that the VSI run rules charts outperform the FSI (Fixed Sampling Interval) run rules charts for wide range of process mean shifts. A major advantage of the VSI run rules chart over other charts such as CUSUM, EWMA, and adaptive charts is it's simplicity in implementation. Some useful guidelines are proposed based on the sensitivity study.

대용변수를 이용한 가변형 부분군 채취 간격 X 관리도의 경제적 설계 (Economic Design of Variable Sampling Interval X Control Chart Using a Surrogate Variable)

  • 이태훈;이주호;이민구
    • 대한산업공학회지
    • /
    • 제39권5호
    • /
    • pp.422-428
    • /
    • 2013
  • In many cases, an $\bar{X}$ control chart which is based on the performance variable is used in industrial fields. However, if the performance variable is too costly or impossible to measure and a less expensive surrogate variable is available, the process may be more efficiently controlled using surrogate variables. In this paper, we propose a model for the economic design of a VSI (Variable Sampling Interval) $\bar{X}$ control chart using a surrogate variable that is linearly correlated with the performance variable. The total average profit model is constructed, which involves the profit per cycle time, the cost of sampling and testing, the cost of detecting and eliminating an assignable cause, and the cost associated with production during out-of-control state. The VSI $\bar{X}$ control charts using surrogate variables are expected to be superior to the Shewhart FSI (Fixed Sampling Interval) $\bar{X}$ control charts using surrogate variables with respect to the expected profit per unit cycle time from economic viewpoint.

Forecasting Symbolic Candle Chart-Valued Time Series

  • Park, Heewon;Sakaori, Fumitake
    • Communications for Statistical Applications and Methods
    • /
    • 제21권6호
    • /
    • pp.471-486
    • /
    • 2014
  • This study introduces a new type of symbolic data, a candle chart-valued time series. We aggregate four stock indices (i.e., open, close, highest and lowest) as a one data point to summarize a huge amount of data. In other words, we consider a candle chart, which is constructed by open, close, highest and lowest stock indices, as a type of symbolic data for a long period. The proposed candle chart-valued time series effectively summarize and visualize a huge data set of stock indices to easily understand a change in stock indices. We also propose novel approaches for the candle chart-valued time series modeling based on a combination of two midpoints and two half ranges between the highest and the lowest indices, and between the open and the close indices. Furthermore, we propose three types of sum of square for estimation of the candle chart valued-time series model. The proposed methods take into account of information from not only ordinary data, but also from interval of object, and thus can effectively perform for time series modeling (e.g., forecasting future stock index). To evaluate the proposed methods, we describe real data analysis consisting of the stock market indices of five major Asian countries'. We can see thorough the results that the proposed approaches outperform for forecasting future stock indices compared with classical data analysis.

VSSI-CRL 합성관리도 (A VSSI-CRL Synthetic Control Chart)

  • 이재원;임태진
    • 한국경영과학회지
    • /
    • 제30권4호
    • /
    • pp.1-14
    • /
    • 2005
  • We propose a VSSI-CRL(Variable Sampling Size and Samplina Interval-Conforming Run length) synthetic control chart in order to improve the statistical characteristics of both the VSSI chart and the CRL synthetic chart. The VSSI-CRL chart utilizes VSSI sampling scheme, but it produces a signal only when the CRI is less than a given limit. An algorithm for calculating the ARL(Average Run length) and ATS(Average Time to Signal) of the VSSI-CRL chart is developed by employing Markov chain method. We present some lemmas for describing the statistical characteristics of the VSSI-CRL chart under in-control state. A procedure for designing the VSSI-CRL chart is proposed based on the lemmas. Extensive comparative studios show that the VSSI-CRL chart is superior to the CRL synthetic chart or the VSSI chart in general, and is comparable to the EWMA chart in ATS performance.

가변샘플링기법을 이용한 합성관리도의 개발 (Development of VSI Synthetic Control Chart)

  • 송서일;박현규
    • 품질경영학회지
    • /
    • 제33권1호
    • /
    • pp.1-10
    • /
    • 2005
  • This paper develops a new VSI $\={X}-CRL$ synthetic control chart that considers convenience of use in the field, and perception of change of process applying VSI techniques to synthetic control chart, simultaneously. We found the optimal sampling interval and various control limit factor of the suggested chart using markov chain. Comparison and analysis is carried out between synthetic VSI $\={X}-CRL$ chart and other chart in the statistical aspect; $\={X}$ control chart, VSI $\={X}$ chart, another synthetic chart. In case that the process follows normal distribution, the proposed VSI $\={X}-CRL$ synthetic control chart in detecting process mean shift showed the best performance in aspect of statistical performance, regardless of control limit L of CRL/S control chart.