This paper analyzed the fault current limiting characteristics of the previously proposed transformer superconducting fault current limiter (TSFCL) interruption system according to its transformer type. The TSFCL interruption system is an interruption technology that combines a TSFCL, which uses a transformer and a superconductor, and a mechanical DC circuit breaker. This technology first limits the fault current using the inductance of the transformer winding and the quench characteristics of the superconductor. The limited fault current is then interrupted by a mechanical DC circuit breaker. The magnitude of the limited fault current can be controlled by the quench resistance of the superconductor in the TSFCL and the turns ratio of the transformer. When the fault current is controlled using a superconductor, additional costs are incurred due to the cooling vessel and the length of the superconductor. When the fault current is controlled using step-up and step-down transformers, however, it is possible to control the fault current more economically than using the superconductor. The TSFCL interruption system was designed using PSCAD/EMTDC-based analysis software, and the fault current limiting characteristics according to the type of the transformer were analyzed. The turns ratios of the step-up and step-down transformers were set to 1:2 and 2:1. The results were compared with those of a transformer with a 1:1 turns ratio.
Zhu, Junpeng;Gu, Wei;Jiang, Ping;Song, Shan;Liu, Haitao;Liang, Huishi;Wu, Ming
Journal of Electrical Engineering and Technology
/
제12권6호
/
pp.2146-2156
/
2017
When a failure occurs in active distribution system, it will be isolated through the action of circuit breakers and sectionalizing switches. As a result, the network might be divided into several connected components, in which distributed generations could supply power for customers. Aimed at decreasing customer interruption cost, this paper proposes a theoretically optimal island partition model for such connected components, and a simplified but more practical model is also derived. The model aims to calculate a dynamic island partition schedule during the failure recovery time period, instead of a static islanding status. Fluctuation and stochastic characteristics of the renewable distributed generations and loads are considered, and the interruption cost functions of the loads are fitted. To solve the optimization model, a heuristic search algorithm based on the hill climbing method is proposed. The effectiveness of the proposed model and algorithm is evaluated by comparing with an existing static island partitioning model and intelligent algorithms, respectively.
In this paper, when photovoltaic systems are connected to distribution system, most effective capacity and location of PV system are studied considering customer interruption costs of power distribution system. The reliability model of PV system considering the duration of sunshine, the model of time-varying load and Roy Billinton test system (bus2 model) are used. To simulate the effects of PV system, various cases are selected; (1) base case which is no connection of PV system to power distribution system when faults are occurred, (2) 3MW case which is 3[MW] connection of PV system (3) 4[MW] case, and (4) 20[MW] case which is 20[MW] connection of PV system to the bus of power distribution system. The capacity limit of connected PV system is settled to 14[MW] for all cases except case 4. The reliability and customer interruption costs for residential, general, industrial, and educational customer is evaluated.
본 연구에서는 현 직접부하제어사업의 실태 및 문제점을 도출하고 국내 실정에 맞는 직접부하제어 활용 및 개선을 위하여 직접부하제어 사업 계약자를 대상으로 제도 개선사항, 지원금액 개선사항 및 제도 실시 등에 대한 설문조사를 하였다. 대표적으로 개선되어야 할 방안으로는 직접부하제어사업 참여 업체 증가를 위하여 기본지원금 및 제어지원금의 검토 방안과 소비자의 의견을 반영한 수요측 입찰 실시 방안이 필요하며, 시장운영과 계통운영에 있어서 페널티, 차단시간, 차단 횟수, 통보시간, 계약기간 등에 대한 기준을 정립할 필요가 있음을 확인하였다.
This paper presents computer simulation results for developing new type of SF$_{6}$ Circuit Breaker in terms of cold gas flow after small current interruption. This cold gas flows down a nozzle into the chamber of a circuit breaker. There are many difficult problems in analyzing the gas flow due to complex geometry, moving boundary, shock wave and so on. When predicting the dielectric capability of a gas circuit breaker after interruption, the gas pressure and density distributions due to the cold gas must be considered in addition to the electrical field imposed across the gas. A self-coded computational fluid dynamics (CFD) program is used for the simulation of cold gas flow in order to evaluate the electrical field characteristic across open contacts and transient characteristics of insulations after small current interruption.
This research is intended to find out the causes of the career interruption of highly-educated housewives, their experiences of caring for their children after career interruption, their psychological conflicts and coping strategies, and their attitudes toward reemployment. The participants were university-graduated housewives in their thirties who have pre-school children older than 2 years. The participants in this research consisted of twenty-nine participants. The essence of this study is the belief system that career and maternal roles are not compatible. Specifically, the participants possessed a certain motherhood ideology, so they gave up working in order to care for their children, deferring their careers for a while. The participants had ambivalent feelings about working mothers, and described their children by highlighting their negative aspects. Additionally, the participants experienced persistent conflicts about developing their careers and caring for their children during their period of career interruption. The participants seemed to possess a vague sense of hope about their careers, and their attitudes toward their careers were ambiguous in the past, present, and even in the future.
Vacuum circuit breakers(VCB) are widely used for current interruption of high-voltage inductive loads such as induction motors. This VCB can be chopped off before the current zero due to its high arc-extinguishing capability. One of the outstanding features of VCB is that it can cut off high frequency re-ignition current more than other circuit breakers. If the transient recovery voltage generated in the arc extinguishing is higher than the dielectric strength of the circuit breaker, a re-ignition phenomenon occurs. The surge voltage of the re-ignition is very high in magnitude and the steepness of the waveform is so severe that it can act as a high electrical stress on the winding. If the high frequency current of one phase affects the other two phases when the re-ignition occurs, it may cause a high surge voltage due to the virtual current chopping. If the magnitude of the voltage allowed in the motor winding is high or the waveform level is too severe, it may lead to insulation breakdown. Therefore, it is necessary to reduce the voltage to within a certain range. In this study, we briefly explain the various phenomena at the time of interruption, analyzed the magnitude of the dielectric strength and the transient recovery voltage at the simultaneous three-phase interruption that can give the greatest influence to the inductive load, proposed a method to reduce the impact.
It is concentrated on a methodology to establish a scheme of investment on power distribution systems of components. This paper provides a methodology to estimate the scheme as using a customer interruption cost regarding reliability indices in power distribution systems. The proposed method basically uses the failure rate depending on time for explaining the deterioration of a component. Therefore, the theory of the sensitivity is used for deciding the precedence of the investment to consider an effect of each component's failure rate on the system reliability. After Estimating the sensitivity on component investment cost making incremental reliability level is produced by component's investment cost accumulated according to the precedence of the sensitivity. After that, the failure rate corresponding with reliability level on the curve of investment cost is used as producing the curve of customer interruption cost. Two curves have the crossing point that is proposed to acceptable reliability level for customer and utility. In this paper, the acceptable reliability level for customer with the utility is assessed to analyze customer interruption cost and sensitivity of reliability indices. In conclusion the result of investment based on this method is shown to the reliability level with two cost.
우리나라에서 연, 아연, 동, 주석, 니켈, 알루미늄 등의 베이스메탈의 수급구조는 양극화된 특성을 지니고 있다. 연, 아연, 동 등은 국내에 세계적 규모의 생산기업이 있는 반면, 주석, 니켈, 알루미늄 등은 국내 생산기업이 전무하거나, 생산량이 미비하여 내수량의 대부분을 수입에 의존하고 있다. 따라서 베이스메탈의 수입중단 또는 국내생산기업의 생산 중단 등의 공급중단에 따른 리스크에 대한 대비가 필요하다. 본 연구에서는 베이스메탈 6종(구리, 연, 아연, 알루미늄, 니켈, 주석)을 대상으로 수입중단 리스크 발생 시 대응이 필요한 물량과 시장이 대응할 수 있는 물량, 정부가 대응해야 하는 물량(전략비축)을 정량화하였다.
본 논문에서는 해석적방법론에 의한 산업용 수용가의 공급지장비를 산정할 수 있는 방법론을 개발하기 위해 산업용 수용가 1,026호를 방문하여 설문조사를 수행하는 미시적 접근법을 사용하여 산업용 수용가의 종별 공급지장비를 표준산업분류에 의한 18개의 업종으로 조사하였다. 얻어진 조사결과를 계층화의사 결정법(AHP; Analytic Hierarchy Process)으로 최적의 공급지장비용 함수(SCDF; Sector Customer Demage Function)를 선정하였다. 이를 통하여 배전계통에서의 신뢰도 가치평가(VBDRA; Value Based Distribution Reliability Assessment)를 위해서 주어진 배전계통 예상 공급지장에너지(EENS; Expected Energy Not Supply), 정전비용기대치(ECOST; Expected Interruption Cost), 차단에너지비율(IEAR; Interrupted Energy Assessment Rate)을 계산하여 그 가치를 평가하였다. 이를 배전계통에 적용하기 위해서 사례연구로 적용하고 공급지장비용을 도출하여 그 특성을 분석하였다.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.