INTEGRATED PERFORMANCE MANAGEMENT FOR WHOLE PHASES OF URBAN RENEWAL MEGAPROJECTS

  • Heedae Park;Kang-Wook Lee;Seung Heon Han
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.1463-1467
    • /
    • 2009
  • Construction projects are vulnerable to diverse internal and external factors, requiring systematic and consistent performance management along the entire life cycle of a project. In particular, urban renewal projects have a range of performance measures, including policy reconciliation and permits, project development, project financing, design, construction, and occupancy and maintenance. This requires a program-level megaproject approach, which integrates each stage of a project as well as variety of stakeholders' interests in pursuing a project from different perspectives. However, previous research on performance management has focused especially on the limited scopes of factors, including cost, quality, and schedule at the project level or on financial factors at the firm level. Given the lack of current approaches, this study suggests an integrated and systematic performance management scheme to control urban renewal megaprojects at the broadened perspectives of the program level. To this end, this study adopts the balanced scorecard approach and elicits key performance indices associated with various project configurations. Finally, an algorithm is presented for quantitatively assessing the level of performances along whole life cycle of urban renewal megaprojects.

  • PDF

Development and Application of Integrated Management System in Nuclear Power Plant Construction Project

  • Lee, Sang Hyun;Byon, Su Jin
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.700-701
    • /
    • 2015
  • Nuclear power plant construction project can be called essential to establish a systematic project management system compared to other construction projects, taking into account the size and complexity and safety. To develop into a project management system for the Korea situation with the ongoing construction of the nuclear power plant was directed to promote nuclear power project management. In this paper, we introduce a comprehensive project management system for nuclear power projects. Currently considering the nuclear life cycle design, construction, and was developed by considering the flow of information to operate, and test each step linkage. The systems in English were developed to meet owner's requirements for advancing into overseas projects. Another point is that the systems were developed by management module, so that functions of each area can be selectively applied. It is expected that the system will establish itself as one that can be used for the entire lifecycle of nuclear power plants through gradual and systematic establishment of necessary data.

  • PDF

Steel Plant Construction (EPC) Project Case Study : Forensic Lessons-learned Analysis and Systems Engineering Improvement Recommendation

  • Kyung-Bae Jin;Young-Ho Kim;Eul-Bum Lee;Suk-Hwan Seo
    • International conference on construction engineering and project management
    • /
    • 2013.01a
    • /
    • pp.145-150
    • /
    • 2013
  • As a recent global trend, the majority of mega-size plant projects are delivered through EPC (Engineering, Procurement and Construction) contracts, where a single contract is awarded for engineering, procurement, and construction. Under this contracting mechanism, it is challenging for contractors to carry out the projects under traditional project management processes used in design-bid-build projects. A new EPC Plant, the POSCO Special Steel Plant in Changwon, was built successfully at the beginning of 2012 and it is currently in full-scale production. The project has encountered a number of major difficulties however, with some technical and managerial issues through its development process. As summarized in this paper, the authors (as project participants with the contractor) investigated it as a post construction analysis and recorded the Lessons-learned for future project management improvement.

  • PDF

A Study of Global Manufacturing Education and Training for Chinese Company Manager

  • Sun, Jing;Tamaki, Kin'ya;Yeh, Shihshui;Takiuti, Noboru
    • Industrial Engineering and Management Systems
    • /
    • v.13 no.3
    • /
    • pp.252-257
    • /
    • 2014
  • Global economic recession, global market reduction, and the deteriorating economic recession are forcing the industry to reconsider the business plan and strategy related to supply chain regardless of the size of the companies. During the economic recession caused by financial anxiety, development of international collaborative producer is the key theme for a manufacturing industry to get over the situation. Especially, development of high-skilled people who are capable of handling global manufacturing management is the key factor in China which shifted from a world factory to a world market. In this background, we started the international project of global manufacturing education and training for Chinese company managers from 2009. In this paper, based on the research conducted by the universities and companies in China, a design of global manufacturing education and training is proposed. This presented design is based on the theory of Japanese production strategy and investigation of actual conditions for Chinese companies and the research methodology of business management practice with efficiency and productive for international level management organization. The effectiveness of the education design is evaluated by applying the international education and training project of Aoyama Gakuin Human Innovation Consulting Inc. and Vigor Management Technology Association.

Cooperation Measures for Agricultural Infrastructure Development in North Korea (북한 농업생산기반조성 현황과 협력 방안)

  • Choe Jin Wook
    • Proceedings of the Korean Society of Crop Science Conference
    • /
    • 1998.10a
    • /
    • pp.134-158
    • /
    • 1998
  • The objectives of this article are to identify the current status of agricultural infrastructure in North Korea and to suggest some cooperation measures among South and North Koreas and international agencies in order to develop the North Korea's agricultural infrastructure. The area of cultivated land in North Korea is 1,992 thousand ha (paddy field: 585 thousand ha: upland: 1,407 thousand ha) in 1997. Major water use facilities in North Korea are 1,900 reservoirs (included 100 big dams), 36,400 irrigation pumping stations, 1,600 drainage pumping stations, and 14'a,000 wells. In addition, there is 'two thousand Ri canal construction project' linking the rivers of Aprok, Daeryong, Daedong, Jaeryong, and Yesong. The unit of paddy land consolidation is about 1 ha which is regarded as rational for agricultural mechanization. The project of 'Darak' upland construction to create small size farmland, which has been carried out since 1976 has been unsuccessful due to the shortage of construction equipment. The area of farmland created by reclamation by 1995 is only 75 thousand ha although the potential project area is at)out 320 thousand ha along the western coast. It is due to the fact that civil engineering technologies and equipments are old and investment funds are insufficient. These are a few suggested areas of cooperation among South and North Korea and international agencies in order to improve North Korea's agricultural infrastructure : i) see land reclamation and land consolidation projects to increase paddy fields for rice production; ii) rehabilitation project in farm land areas devastated by flood; and iii) agricultural water development project which including diagnosing and rehabilitating irrigation and drainage facilities.

  • PDF

Successful Winning Award Factors in Early Stage of International Public Private Partnership Projects (해외개발사업 발굴단계의 수주성공요인 분석)

  • Jung, Wooyong;Han, Seungheon
    • Korean Journal of Construction Engineering and Management
    • /
    • v.18 no.3
    • /
    • pp.84-94
    • /
    • 2017
  • Recently, domestic construction companies have increasingly engaged in international PPP projects a result of both uncertainties in the domestic construction market and low competitiveness in international EPC project business. These international PPP projects usually require long-term preparations and substantial sales costs, which make it important for decision-makers to select winning-award potential project in early stage of the projects. However, most previous research has analyzed success factors in terms of project development across all stages. Thus, this study investigated 28 success factors of 4 categories in the early stage of 31 international PPP projects. First, results indicate that unsolicited PPP projects require better implementation capabilities and financial conditions compared to solicited PPP projects. Second, implementation capability is important because it is not easy to improve as the project proceeds. Third, commercial conditions are identified as important even if conditions are not fixed in the early stage of PPP projects. Fourth, non-commercial conditions, strategy, and public interest are not found to be meaningful in the early stage of PPP projects because they can vary as the project proceeds. This study helps to improve selection criteria aimed towards more winning-award potential project in the early stage of international PPP projects.

Present State and Strategies on Environmental Pollution by Animal Wastes (축산분뇨에 의한 환경오염현황과 대책)

  • 이명규;이재일
    • Journal of Animal Environmental Science
    • /
    • v.2 no.1
    • /
    • pp.63-78
    • /
    • 1996
  • The main purpose of this research project is to monitor the present state of agricultural environment and to develope the countermeasures for the protection of the environment from the pollution by animal wastes. The results of this research were described largely 3 parts, 1) Monitoring of present state of environmental pollution by animal wastes, 2) Monitoring of animal wastes treatment technology, 3) Strategies for the protection of environmental pollution from animal wastes in future. The current most important problems from animal wastes are water pollution and air pollution commonly regardless of domestic or foreign country. Especially, intensive livestocks breeding pattern in restricted area is actually a real reason of eutrophication, soil acidification, ground water contamination, irrigation water pollution. As a result from this research project, authors recommend the 3 type of strategies for the protection of environmental pollution by animal wastes, 1 . Development of non-discharge type of wastes treatment technology 2. Manufacturing local structure for animal waste recycling system 3. Development of new international environmental program for transfer bioresource and soil environment prevention.

  • PDF

Basic Research on Nuclear Power Plant Construction Claims and Dispute Management Processes Development

  • Son, HyeJin;Lee, SangHyun;Byon, SuJin
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.710-711
    • /
    • 2015
  • A nuclear power plant construction is a complex form of construction which comprises various stakeholders and contractors. Therefore, contract disputes will occur due to conflicting interests of contracting parties and unpredictable factors which arise during construction work. Even if the contract is well prepared, it cannot fully prepare for future situations in actuality. Claims management is very important in carrying out construction management. This study intends to define claim, and delve into development of claims management processes from the viewpoint of owners and contractor through consideration on international contract terms on claims management and the details of the claims management of the Construction Extension to the PMBOK. In addition, it is needed to accumulate and manage data on claims that have occurred so that they can be referenced in the future. As information should be accumulated so that type classification can be carried out and that lessons can be learned on claims that have occurred in each business site, study on establishing data-based systems relating to claims processes will be needed in the future.

  • PDF

A CASE STUDY ON INVESTMENT EVALUATION OF A PRIVATE SECTOR PROJECT WITH GEOTECHNICAL RISKS

  • Yoshiki Onoi;Hiroyasu Ohtsu
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.824-829
    • /
    • 2005
  • This paper focuses on construction cost volatility for the purpose of private sector investment by use of a financial model with key indices of IRR and DSCR (Debt Service Coverage Ratio). A case project, 1,000 MW pumped storage hydropower plant, has shown that its financial impacts by cost volatility of underground works are less measured than interest rates impacts by interest rate of loans. Probabilistic analysis of costs under geotechnical conditions has been made by Indicator Kriging method. And, in the modeling of interest rates, geometric Brownian motion has been applied. Both of these impacts are measured on the same financial model.

  • PDF

Research on Storytelling Elements in Augmented Reality Cinema through the Process of Image Abstraction: A Case Study of 'AR Campus Diary'

  • Tae-Eun, Kim
    • International Journal of Advanced Culture Technology
    • /
    • v.12 no.1
    • /
    • pp.262-269
    • /
    • 2024
  • The "AR Campus Diary" project innovates in the realm of art through integrating augmented reality (AR) with interactive storytelling, fostering personal and interpersonal development through artistic expression. This artistic endeavor metaphorically represents the growth and fruition of individual stories, facilitated by a series of progressive art activities that emphasize continual interaction between self and others. Set against the backdrop of a university campus, the project employs AR markers designed to unfold stories in phases through a dedicated application, allowing participants to experience and influence the narrative uniquely. Diverging from traditional film editing techniques, "AR Diary" offers viewers the autonomy to navigate through story segments of their choosing, marking a departure from conventional cinematic storytelling by leveraging marker-based plot progression. This project not only showcases the fusion of technology and art but also pioneers a participatory form of art education based on engagement and play.