International conference on construction engineering and project management
/
2009.05a
/
pp.1463-1467
/
2009
Construction projects are vulnerable to diverse internal and external factors, requiring systematic and consistent performance management along the entire life cycle of a project. In particular, urban renewal projects have a range of performance measures, including policy reconciliation and permits, project development, project financing, design, construction, and occupancy and maintenance. This requires a program-level megaproject approach, which integrates each stage of a project as well as variety of stakeholders' interests in pursuing a project from different perspectives. However, previous research on performance management has focused especially on the limited scopes of factors, including cost, quality, and schedule at the project level or on financial factors at the firm level. Given the lack of current approaches, this study suggests an integrated and systematic performance management scheme to control urban renewal megaprojects at the broadened perspectives of the program level. To this end, this study adopts the balanced scorecard approach and elicits key performance indices associated with various project configurations. Finally, an algorithm is presented for quantitatively assessing the level of performances along whole life cycle of urban renewal megaprojects.
International conference on construction engineering and project management
/
2015.10a
/
pp.700-701
/
2015
Nuclear power plant construction project can be called essential to establish a systematic project management system compared to other construction projects, taking into account the size and complexity and safety. To develop into a project management system for the Korea situation with the ongoing construction of the nuclear power plant was directed to promote nuclear power project management. In this paper, we introduce a comprehensive project management system for nuclear power projects. Currently considering the nuclear life cycle design, construction, and was developed by considering the flow of information to operate, and test each step linkage. The systems in English were developed to meet owner's requirements for advancing into overseas projects. Another point is that the systems were developed by management module, so that functions of each area can be selectively applied. It is expected that the system will establish itself as one that can be used for the entire lifecycle of nuclear power plants through gradual and systematic establishment of necessary data.
Kyung-Bae Jin;Young-Ho Kim;Eul-Bum Lee;Suk-Hwan Seo
International conference on construction engineering and project management
/
2013.01a
/
pp.145-150
/
2013
As a recent global trend, the majority of mega-size plant projects are delivered through EPC (Engineering, Procurement and Construction) contracts, where a single contract is awarded for engineering, procurement, and construction. Under this contracting mechanism, it is challenging for contractors to carry out the projects under traditional project management processes used in design-bid-build projects. A new EPC Plant, the POSCO Special Steel Plant in Changwon, was built successfully at the beginning of 2012 and it is currently in full-scale production. The project has encountered a number of major difficulties however, with some technical and managerial issues through its development process. As summarized in this paper, the authors (as project participants with the contractor) investigated it as a post construction analysis and recorded the Lessons-learned for future project management improvement.
Global economic recession, global market reduction, and the deteriorating economic recession are forcing the industry to reconsider the business plan and strategy related to supply chain regardless of the size of the companies. During the economic recession caused by financial anxiety, development of international collaborative producer is the key theme for a manufacturing industry to get over the situation. Especially, development of high-skilled people who are capable of handling global manufacturing management is the key factor in China which shifted from a world factory to a world market. In this background, we started the international project of global manufacturing education and training for Chinese company managers from 2009. In this paper, based on the research conducted by the universities and companies in China, a design of global manufacturing education and training is proposed. This presented design is based on the theory of Japanese production strategy and investigation of actual conditions for Chinese companies and the research methodology of business management practice with efficiency and productive for international level management organization. The effectiveness of the education design is evaluated by applying the international education and training project of Aoyama Gakuin Human Innovation Consulting Inc. and Vigor Management Technology Association.
Proceedings of the Korean Society of Crop Science Conference
/
1998.10a
/
pp.134-158
/
1998
The objectives of this article are to identify the current status of agricultural infrastructure in North Korea and to suggest some cooperation measures among South and North Koreas and international agencies in order to develop the North Korea's agricultural infrastructure. The area of cultivated land in North Korea is 1,992 thousand ha (paddy field: 585 thousand ha: upland: 1,407 thousand ha) in 1997. Major water use facilities in North Korea are 1,900 reservoirs (included 100 big dams), 36,400 irrigation pumping stations, 1,600 drainage pumping stations, and 14'a,000 wells. In addition, there is 'two thousand Ri canal construction project' linking the rivers of Aprok, Daeryong, Daedong, Jaeryong, and Yesong. The unit of paddy land consolidation is about 1 ha which is regarded as rational for agricultural mechanization. The project of 'Darak' upland construction to create small size farmland, which has been carried out since 1976 has been unsuccessful due to the shortage of construction equipment. The area of farmland created by reclamation by 1995 is only 75 thousand ha although the potential project area is at)out 320 thousand ha along the western coast. It is due to the fact that civil engineering technologies and equipments are old and investment funds are insufficient. These are a few suggested areas of cooperation among South and North Korea and international agencies in order to improve North Korea's agricultural infrastructure : i) see land reclamation and land consolidation projects to increase paddy fields for rice production; ii) rehabilitation project in farm land areas devastated by flood; and iii) agricultural water development project which including diagnosing and rehabilitating irrigation and drainage facilities.
Korean Journal of Construction Engineering and Management
/
v.18
no.3
/
pp.84-94
/
2017
Recently, domestic construction companies have increasingly engaged in international PPP projects a result of both uncertainties in the domestic construction market and low competitiveness in international EPC project business. These international PPP projects usually require long-term preparations and substantial sales costs, which make it important for decision-makers to select winning-award potential project in early stage of the projects. However, most previous research has analyzed success factors in terms of project development across all stages. Thus, this study investigated 28 success factors of 4 categories in the early stage of 31 international PPP projects. First, results indicate that unsolicited PPP projects require better implementation capabilities and financial conditions compared to solicited PPP projects. Second, implementation capability is important because it is not easy to improve as the project proceeds. Third, commercial conditions are identified as important even if conditions are not fixed in the early stage of PPP projects. Fourth, non-commercial conditions, strategy, and public interest are not found to be meaningful in the early stage of PPP projects because they can vary as the project proceeds. This study helps to improve selection criteria aimed towards more winning-award potential project in the early stage of international PPP projects.
The main purpose of this research project is to monitor the present state of agricultural environment and to develope the countermeasures for the protection of the environment from the pollution by animal wastes. The results of this research were described largely 3 parts, 1) Monitoring of present state of environmental pollution by animal wastes, 2) Monitoring of animal wastes treatment technology, 3) Strategies for the protection of environmental pollution from animal wastes in future. The current most important problems from animal wastes are water pollution and air pollution commonly regardless of domestic or foreign country. Especially, intensive livestocks breeding pattern in restricted area is actually a real reason of eutrophication, soil acidification, ground water contamination, irrigation water pollution. As a result from this research project, authors recommend the 3 type of strategies for the protection of environmental pollution by animal wastes, 1 . Development of non-discharge type of wastes treatment technology 2. Manufacturing local structure for animal waste recycling system 3. Development of new international environmental program for transfer bioresource and soil environment prevention.
International conference on construction engineering and project management
/
2015.10a
/
pp.710-711
/
2015
A nuclear power plant construction is a complex form of construction which comprises various stakeholders and contractors. Therefore, contract disputes will occur due to conflicting interests of contracting parties and unpredictable factors which arise during construction work. Even if the contract is well prepared, it cannot fully prepare for future situations in actuality. Claims management is very important in carrying out construction management. This study intends to define claim, and delve into development of claims management processes from the viewpoint of owners and contractor through consideration on international contract terms on claims management and the details of the claims management of the Construction Extension to the PMBOK. In addition, it is needed to accumulate and manage data on claims that have occurred so that they can be referenced in the future. As information should be accumulated so that type classification can be carried out and that lessons can be learned on claims that have occurred in each business site, study on establishing data-based systems relating to claims processes will be needed in the future.
International conference on construction engineering and project management
/
2005.10a
/
pp.824-829
/
2005
This paper focuses on construction cost volatility for the purpose of private sector investment by use of a financial model with key indices of IRR and DSCR (Debt Service Coverage Ratio). A case project, 1,000 MW pumped storage hydropower plant, has shown that its financial impacts by cost volatility of underground works are less measured than interest rates impacts by interest rate of loans. Probabilistic analysis of costs under geotechnical conditions has been made by Indicator Kriging method. And, in the modeling of interest rates, geometric Brownian motion has been applied. Both of these impacts are measured on the same financial model.
International Journal of Advanced Culture Technology
/
v.12
no.1
/
pp.262-269
/
2024
The "AR Campus Diary" project innovates in the realm of art through integrating augmented reality (AR) with interactive storytelling, fostering personal and interpersonal development through artistic expression. This artistic endeavor metaphorically represents the growth and fruition of individual stories, facilitated by a series of progressive art activities that emphasize continual interaction between self and others. Set against the backdrop of a university campus, the project employs AR markers designed to unfold stories in phases through a dedicated application, allowing participants to experience and influence the narrative uniquely. Diverging from traditional film editing techniques, "AR Diary" offers viewers the autonomy to navigate through story segments of their choosing, marking a departure from conventional cinematic storytelling by leveraging marker-based plot progression. This project not only showcases the fusion of technology and art but also pioneers a participatory form of art education based on engagement and play.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.