• Title/Summary/Keyword: international development project

Search Result 1,014, Processing Time 0.027 seconds

Serve as You Learn: Problem-Based Service-Learning Integrated into a Product Innovation and Management Class

  • Kim, Eundeok;Lee, Yoon-Jung
    • International Journal of Costume and Fashion
    • /
    • v.18 no.2
    • /
    • pp.29-43
    • /
    • 2018
  • Service-learning is a form of experiential education in which students participate in organized activities and develop a sense of civic responsibility while acquiring content knowledge of the discipline. The purpose of this study was first, to examine the underlying theories and principles of service-learning, and second, to present a case of systemic implementation of problem-based service-learning into a Product Innovation and Management class in higher education. The New Product Development for an E-Commerce Small Business project was developed for a community partner, BevShots, reflecting the needs of the firm, and was tightly woven into the course content. Students' participation in the project had a significant effect on increasing their awareness of the needs in the community and identifying their roles as citizens as well as enhancing their content knowledge learning. The community partner also received benefits for his business by participating in the project. Through this study, we aim to inspire fashion design and merchandising educators to implement service-learning projects/classes in the curriculum.

MODEL FOR DESIGN MANAGEMENT IN COLLABORATIVE ENVIRONMENT USING DESIGN STRUCTURE MATRIX AND DESIGN PARAMETERS' INFORMATION

  • Salman Akram;Jeonghwan Kim;Jongwon Seo
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.1307-1312
    • /
    • 2009
  • Design is an act based on multidisciplinary information. The involvement of various stakeholders makes it difficult to process, plan, and integrate. Iteration is frequent in most of the engineering design and development projects including construction. Design iterations cause rework, and extra efforts are required to get the optimal sequence and to manage the projects. The simple project management techniques are insufficient to fulfill the requirements of integrated design. This paper entails two things: design structure matrix and design parameters' information based model. The emphasis has been given to optimal sequence and crucial iteration using design structure matrix analysis technique. The design projects have been studied using survey data from industry. The optimal sequence and crucial iterations results have been utilized for proposed model. Model integrates two things: information about produced- required key design parameters and information of design changes during the design process. It will help to get familiar with Design management in order to fulfill contemporary needs.

  • PDF

Analysis of the BIM technology status and the development strategy in Korea

  • Yun, Seok-Heon;Kim, Sang-Chul;Lee, Namhun
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.648-649
    • /
    • 2015
  • BIM could be used for integrating project information through life cycle of building facilities. Also it could improve the accuracy and work efficiency through data interoperability with other disciplines. However, these benefits from adopting BIM could not be attained easily in real project cases. In order to make the most use of BIM and get the maximum benefits from it, the environments such as standards, guidelines and the related technologies are also could be supported. Therefore many countries are developing or already developed the technology roadmap for BIM. In this study, we tried to analyze the BIM technology status and develop the strategy for improve usability of BIM in Korea.

  • PDF

SUSTAINABLE AND ENVIRONMENTALLY RESPONSIBLE DESIGN USING BIM: A CASE STUDY OF A RESIDENTIAL PROJECT

  • Hyunjoo Kim;Kwok K. Tam
    • International conference on construction engineering and project management
    • /
    • 2011.02a
    • /
    • pp.84-87
    • /
    • 2011
  • This paper describes the application of the three sustainable design elements for a residential project in the county of Los Angeles, USA. The first design element is the green building design in which a base model will be created using the Autodesk REVIT MEP program for the analysis by Building Information Modeling (BIM) for the energy analysis modeling process to determine the energy savings for each of the recommended design features. The second element is the Low Impact Development design for the site design using specialty material and structural devices for infiltration and recycling of storm water for reuse. The third element is the application of drought tolerant plant species in the site's landscaping design as a means to conserve water. The construction cost associated with the application of these three elements will be reviewed to determine the practicality and effectiveness of this sustainable design approach.

  • PDF

SIMP: SLICKS AS INDICATORS FOR MARINE PROCESSES

  • Mitnik, Leonid M.;Gade, Martin;Ermakov, Stanislav A.;Lavrova, Olga Yu.;Silva, Jose B.C. da;Woolf, David K.
    • Proceedings of the KSRS Conference
    • /
    • v.2
    • /
    • pp.950-953
    • /
    • 2006
  • SIMP is an international project funded by INTAS aimed at improving the information content, which can be inferred from multi-sensor satellite imagery of marine coastal areas. Scientific teams from Germany, UK, Portugal, and Russia focus on the development of novel tools for marine remote sensing of the coastal zone. In particular, the project teams' benefit from the fact that surface films may enhance the signatures of hydrodynamic processes such as plumes, internal waves, eddies, etc., on microwave, optical, and infrared imagery. The project's objectives are to develop a robust methodology for identifying slick-related phenomena/processes through their surface signatures and thereby, to improve the discrimination capabilities between slicks and other oceanic and atmospheric phenomena by taking into account information gained from satellite imagery quasi-simultaneously recorded at microwave, visible and IR wavelengths. The results of the two project years are summarized. Examples are given for the project’s web presentation, laboratory and field experiments, and of the analyses of various satellite data.

  • PDF

AN INTEGRATED REAL OPTION-RISK MANAGEMENT FRAMEWORK FOR PPP/PFI PROJECTS

  • Jicai Liu;Charles Y.J. Cheah
    • International conference on construction engineering and project management
    • /
    • 2007.03a
    • /
    • pp.729-738
    • /
    • 2007
  • The Public Private Partnership/Private Finance Initiative (PPP/PFI) schemes have made the private sector become a major participant involved in the development of infrastructure systems along with the government. Due to more integrated efforts among project participants and longer concession period, PPP/PFI projects are inherently more complex and risky. It is therefore very important to proactively manage the risks involved throughout the project life cycle. Conventional risk management strategies sometimes ignore managerial flexibility in the planning and execution process. This paper starts with a revised risk management framework which incorporates the real option concept. Following the presentation of the framework, a new risk classification is proposed which leads to different ways of structuring options in a project according to the stage of the project life cycle. Finally, the paper closes by discussing other issues concerning option modeling and negotiation.

  • PDF

DEVELOPMENT OF A FRONT END PLANNING TOOL FOR SUSTAINABILITY

  • Sang-Hoon Lee;Spencer Howard;Lingguang Song;Kyungrai Kim
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.506-513
    • /
    • 2009
  • The Construction Industry Institute (CII) developed the Project Definition Rating Index (PDRI), as a part of their Front End Planning best practices, which helps project managers assess and measure project scope definition risk elements. U.S. Green Building Council are seeing the benefits of sustainable building and Leadership in Energy and Environmental Design certification by positively impacting life cycle costs, building marketability, and organizational productivity. However, there have been no efforts to integrate these two planning tools in construction industry. By applying a supplemental tool which combines the PDRI with the LEED rating system, construction industry can develop and implement a tailored instrument that leads to total project success in sustainability. The objective of this research is to assemble a new front end planning mechanism for green buildings by incorporating the current PDRI and LEED systems.

  • PDF

A Study on Development of IT System Roadmap in Construction industry

  • Xue-Quan Lee;Moon-Seo Park;Hyun-Soo Lee
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.1404-1409
    • /
    • 2009
  • These days, the extension and complication of construction project has attached greater significance to IT system for effective project management. Construction companies inside the country have established IT system, but the fact is that they are not up to the expectations of investment provision, and the absense of objective and strategy about project management information system makes its efficiency doubtful. The research, from the point view of construction company, makes an estimate of indefinite future, and presents the process of making out IT system roadmap as a long-term strategy in building IT system.

  • PDF

Development of Review Processes and Tools for Liquidated Damages for EPC/Turnkey Project: Contractor's Perspective

  • Hahn, Ki Jeong;Lee, Eul-Bum;Kim, Young Ho
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.718-719
    • /
    • 2015
  • As a recent global trend, the majority of plant projects are delivered through EPC or EPC-turnkey contracts, where a contractor's liability is more complicated because of the mega size scale and financing method. Previous researches have been lacking a practical usability for project members for liabilities of contracts. Those were focused on solving the claims or schedule calculation issues only. The objective of the present study was to develop a validation process for LDs (liquidated damages) in contractor's liabilities with various case studies and expert judgments. As summarized in this paper, the processes and tools were developed with project life cycle process. The project preparation phase includes 3 step check lists to determine the Go or No-go for projects. In progress phase, contractors should focus on the response strategies for claims with liabilities. The study concludes that those developed processes and tools will help to manage risk of LDs for the contractors in the overseas projects.

  • PDF

A STUDY ON THE FEASIBILITY OF IPD METHOD IN CONSTRUCTION PROJECT IN CHINA

  • Teng Li;Jae-Jun Kim;Ju-Hyung Kim
    • International conference on construction engineering and project management
    • /
    • 2011.02a
    • /
    • pp.493-497
    • /
    • 2011
  • Project delivery systems have evolved over the years. Continuous changes in technology and the increasing sophistication in buildings required specialization of design and construction services. IPD as a delivery method has been used in the USA and other countries. With the development of BIM, lots of construction companies have been realizing this method since BIM came out in China. However IPD are not considered with BIM, IPD will be an important role in management system of construction. This study introduced the definition of IPD and based on the flow process of IPD, compared the process in china and other countries. Through the real project and the condition in China this paper analyzed the feasibility of IPD in China.

  • PDF