• Title/Summary/Keyword: international construction projects

검색결과 624건 처리시간 0.032초

THE CAUSES OF BAD PROFIT IN OVERSEAS CONSTRUCTION PROJECTS

  • Seung Heon Han;Du Yon Kim;Sang Hyuk Park
    • 국제학술발표논문집
    • /
    • The 1th International Conference on Construction Engineering and Project Management
    • /
    • pp.1237-1243
    • /
    • 2005
  • International construction projects are exposed to various and complicated risk factors stemming from different political, economical, social, and cultural backgrounds, which make contractors entering into international construction to experience severe losses. It implies that overseas markets do not necessarily secure the high return, which is typically expected to in the high risky attempts. Accordingly, contractors need to evaluate various risk factors faced with overseas construction projects that can possibly aggravate the profitability. This paper aims at establishing a valid groundwork for further research on developing the integrated risk management model. For this end, it analyzes the long-term trend of profitability on total of 3,487 projects performed by Korean global contractors in world-wide construction markets during the last four decades. Then, it investigates the possible factors/causes of bad profit that have affected the profitability significantly through the structured surveys of 90 real overseas projects based on the project-specific information and experiences of Korean contractors in overseas markets. Furthermore, it analyzes relative importance of these factors/causes and identifies the important features expected for the risk management of international construction projects. Finally, vital distinctions between success and failure projects and lessons learned to improve profitability are then distilled.

  • PDF

Development of A Computerized Risk Management System for International EPCS Projects

  • Yoo, Wi Sung;Kim, Woo-young;Sung, Yookyung
    • 국제학술발표논문집
    • /
    • The 6th International Conference on Construction Engineering and Project Management
    • /
    • pp.614-615
    • /
    • 2015
  • In these days, global construction market is speedily increasing and domestic construction companies have a chance of new contracts. In the meantime, international projects have been increasingly forced to cope with potential risks, which seriously impacted achieving the targeted time and cost. In this study, we introduce a computerized risk management system for international EPCS projects, which is constructed on the needs of practitioners and decision makers as an aid to proactively control the potential risks and to monitor continuously their status and variation. The system is called the Project Risk Management System (PRiMS) is useful for furnishing project managers with warning signals as a project is progressing and helpful for producing the total risk score and tracking risk variation.

  • PDF

해외건설 시장 분석을 통한 건설기술개발 전략 수립 (Development of Construction R&D Strategy through the International Construction Market Analysis)

  • 박환표;김석
    • 한국건설관리학회논문집
    • /
    • 제17권2호
    • /
    • pp.49-57
    • /
    • 2016
  • 국토교통연구개발 사업은 산학연 전문가 수요조사를 통하여 과제를 발굴하고, 세부 기획사업을 통하여 연구개발사업이 추진되고 있다. 이러한 연구개발사업은 대부분 국내 사업에 적용할 목적으로 추진되어 왔다. 그러나 국내에서는 지속적인 연구개발투자에도 불구하고 해외건설사업 수주와 연관성이 있는 사업 투자보다는 세계 최고기술 확보를 위하여 과제를 발굴하고 추진하여 왔다. 따라서 본 연구는 해외건설 경쟁력 강화를 위한 해외진출 국가에 적합한 기술개발을 추진하기 위하여 해외건설시장 동향과 수주 분석 그리고 국내외 해외건설 연구개발 동향을 분석하였다. 이를 기반으로 우리나라 기업의 해외진출 확대를 유도하기 위한 진출 국가별 연구개발 기술개발 방향과 연구개발과제를 도출하였다. 기술개발방향은 해외시장 맞춤형 시장확대 관련, 해외공사 수익성 강화 관련, 글로벌 신시장 개척 관련으로 크게 세 가지로 구분하였고, 이를 토대로 해외건설관련 전문가를 대상으로 수요조사를 통하여 38개 과제 도출과 도출된 과제에 대한 우선순위 평가를 통하여 세 가지 연구개발방향에 맞추어 10개 과제를 도출하였다.

COST PERFORMANCE PREDICTION FOR INTERNATIONAL CONSTRUCTION PROJECTS USING MULTIPLE REGRESSION ANALYSIS AND STRUCTURAL EQUATION MODEL: A COMPARATIVE STUDY

  • D.Y. Kim;S.H. Han;H. Kim;H. Park
    • 국제학술발표논문집
    • /
    • The 2th International Conference on Construction Engineering and Project Management
    • /
    • pp.653-661
    • /
    • 2007
  • Overseas construction projects tend to be more complex than domestic projects, being exposed to more external risks, such as politics, economy, society, and culture, as well as more internal risks from the project itself. It is crucial to have an early understanding of the project condition, in order to be well prepared in various phases of the project. This study compares a structural equation model and multiple regression analysis, in their capacity to predict cost performance of international construction projects. The structural equation model shows a more accurate prediction of cost performance than does regression analysis, due to its intrinsic capability of considering various cost factors in a systematic way.

  • PDF

CONSTRUCTION DELAY IN INTERNATIONAL PROJECTS: WITH SPECIAL REFERENCE TO GULF AREA CAUSES, DAMAGE ASSESSMENTS AND ENTITLEMENTS

  • Sami Fereig;Nabil Kartam
    • 국제학술발표논문집
    • /
    • The 1th International Conference on Construction Engineering and Project Management
    • /
    • pp.758-763
    • /
    • 2005
  • For international projects in general and the projects in the Gulf area in Particular, the most common cause of construction disputes and claims is construction delay. This paper will present different surveys to identify the causes of delay, the parties responsible, and how delay can be avoided. This paper will outline how these factors impact damage assessment and entitlement. Furthermore, a case study will be presented to show how the responsibility and damages due to delay are assessed and how entitlements are calculated.

  • PDF

A Decision Support System for Small & Medium Construction Companies (SMCCs) at the early stages of international projects

  • Park, Chan Young;Jang, Woosik;Hwang, Geunouk;Lee, Kang-Wook;Han, Seung Heon
    • 국제학술발표논문집
    • /
    • The 6th International Conference on Construction Engineering and Project Management
    • /
    • pp.213-216
    • /
    • 2015
  • Despite the significant increase of Korean contractors in the international construction market, many SMCCs (Small & Medium Construction Companies) have suffered in the global financial crisis, and some of them have been kicked out of the international market after experiencing huge losses on projects. SMCCs face obstacles in the international market, such as an insufficient ability to gather information and inappropriate management of associated risks, which lead to difficulties in establishing effective business strategies. In other words, making immature decisions without an effective business strategy may cause not only the failure of one project but also the bankruptcy of the SMCC. To overcome this, the research presented herein aims to propose a decision support system for SMCCs, which would screen projects and make a go/no-go decision at the early stages of international projects. The proposed system comprises a double axis: (1) a profit prediction model, which evaluates 10 project properties using an objective methodology based on a historical project performance database and roughly suggests expected profit rate, and (2) a feasibility assessment model, which evaluates 17 project environment factors in a subjective and quantitative methodology based on experience and supervision. Finally, a web-based system is established to enhance the practical usability, which is expected to be a good reference for inexperienced SMCCs to make proper decisions and establish effective business strategies.

  • PDF

INTERNATIONAL PROJECT MANAGEMENT OF SUZHOU SCIENCE AND CULTURAL ART CENTRE AND SUZHOU INTERNATIONAL EXPO CENTRE

  • Tan Wei Szu Jackson
    • 국제학술발표논문집
    • /
    • The 2th International Conference on Construction Engineering and Project Management
    • /
    • pp.19-29
    • /
    • 2007
  • This paper shares our project management experience in the 2 large-scale projects in managing a diverse international project team of consultants and managing in a foreign land. The first part introduces the two projects, second part addresses management of the projects and the last portion presents some of the challenges we experienced and highlights the importance of understanding the peculiarities of the operating environment, their norms, cultures, effectiveness and limitations of conventional project management tools while operating in a foreign country.

  • PDF

Development of International Project Risk Index (IPRI)

  • Yoo, Wi Sung;Kim, Woo-young
    • 국제학술발표논문집
    • /
    • The 6th International Conference on Construction Engineering and Project Management
    • /
    • pp.49-50
    • /
    • 2015
  • Since the mid-2000s, Korean large-sized construction companies have pursued in earnest to expand their business to global construction market in surroundings that domestic market have a continuous and long-term stagnation. However, during last a few years, they have experienced the serious financial loss from international projects. In the meantime, for the sound improvement of Korean construction industry, many stakeholders long for efficient early warning signals to generally monitor and track the potential risks of international projects. In this study, we introduce an International Project Risk Index (IPRI), which is derived from massive data provided by large-sized companies, and expect to provide the practitioners and decision makers as an aid to proactively cope with the change of the potential risks. The outcomes from the IPRI can be utilized to prepare a timely management strategy and to establish an appropriate government support regulation.

  • PDF

TOTAL RISK INDEX FOR ASSESSING RISK LEVELS OF OVERSEAS CONSTRUCTION PROJECTS

  • Du Yon Kim;Seung Heon Han;Heedae Park
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.1414-1418
    • /
    • 2009
  • International construction projects typically manifest difficult, complex, and varied types of risk exposures; because of this, there is a need for accurate evaluation of risk-integrated performances during the timeframe of project execution. Given the financial crisis currently affecting the world economy recession, risk management has become a more crucial part for the success of international project management. However, the majority of risk management approaches, particularly for overseas projects, are focused primarily on simple forms of checklists, formalization of risk variables affecting project performance for a specific phase, or more complicated computational methods that restricting practical utilization in real-world projects; moreover, these methods lack the conceptual basis to broadly visualize the level of risk over all phases of a project. This study suggests an efficient, yet simple risk-integrated total index to successfully assess the risk levels of overseas construction projects. To this end, this paper first investigates the life cycles and key processes of decision-making for a given project and then derives formulas to represent the total risk index (TRI) along the key decision-making processes. In addition, the study examines the relationships between TRI and performance levels based on the analysis of 126 real-world project samples. Validations using the proposed TRI showed a high correlation to project performance, signifying the usefulness of the proposed approach for construction firms when investigating the level of risks and key areas for management focus.

  • PDF

PROGRAMMATIC AND PROJECT-LEVEL RISKS: ESTABLISHING A RISK MANAGEMENT PROCESS FOR MIDDLE EAST PLANT PROJECTS

  • G. Edward Gibson Jr.;John Walewski;SangBum Kim;Clayton Ingam;Hamid Hajian
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.1000-1014
    • /
    • 2009
  • Research sponsored by the Korean Government investigated the establishment of a risk management process by Korean contractors involved with plant projects in the Middle East. This research effort builds upon the work completed by the Construction Industry Institute (CII), called the International Project Risk Assessment (IPRA) tool and method, and also explored how CII's Project Definition Rating Index (PDRI) could be incorporated to improve project planning by addressing risks and scope development issues. Specific findings and recommendations were developed including the creation of the Contractor Critical Areas of Concern (CCAC) risk screening tool for Korean contractors pursuing Middle East oil and gas projects.

  • PDF