• Title/Summary/Keyword: integrated model

Search Result 5,236, Processing Time 0.036 seconds

연결강도분석을 이용한 통합된 부도예측용 신경망모형

  • Lee Woongkyu;Lim Young Ha
    • Proceedings of the Korea Association of Information Systems Conference
    • /
    • 2002.11a
    • /
    • pp.289-312
    • /
    • 2002
  • This study suggests the Link weight analysis approach to choose input variables and an integrated model to make more accurate bankruptcy prediction model. the Link weight analysis approach is a method to choose input variables to analyze each input node's link weight which is the absolute value of link weight between an input nodes and a hidden layer. There are the weak-linked neurons elimination method, the strong-linked neurons selection method in the link weight analysis approach. The Integrated Model is a combined type adapting Bagging method that uses the average value of the four models, the optimal weak-linked-neurons elimination method, optimal strong-linked neurons selection method, decision-making tree model, and MDA. As a result, the methods suggested in this study - the optimal strong-linked neurons selection method, the optimal weak-linked neurons elimination method, and the integrated model - show much higher accuracy than MDA and decision making tree model. Especially the integrated model shows much higher accuracy than MDA and decision making tree model and shows slightly higher accuracy than the optimal weak-linked neurons elimination method and the optimal strong-linked neurons selection method.

  • PDF

Discriminant Model for Pattern Identifications in Stroke Patients Based on Pattern Diagnosis Processed by Oriental Physicians (전문가 변증과정을 반영한 중풍 변증 판별모형)

  • Lee, Jung-Sup;Kim, So-Yeon;Kang, Byoung-Kab;Ko, Mi-Mi;Kim, Jeong-Cheol;Oh, Dal-Seok;Kim, No-Soo;Choi, Sun-Mi;Bang, Ok-Sun
    • Journal of Physiology & Pathology in Korean Medicine
    • /
    • v.23 no.6
    • /
    • pp.1460-1464
    • /
    • 2009
  • In spite of many studies on statistical model for pattern identifications (PIs), little attention has been paid to the complexity of pattern diagnosis processed by oriental physicians. The aim of this study is to develop a statistical diagnostic model which discriminates four PIs using multiple indicators in stroke. Clinical data were collected from 981 stroke patients and 516 data of which PIs were agreed by two independent physicians were included. Discriminant analysis was carried out using clinical indicators such as symptoms and signs which referred to pattern diagnosis, and applied to validation samples which contained all symptoms and signs manifested. Four Fischer's linear discriminant models were derived and their accuracy and prediction rates were 93.2% and 80.43%, respectively. It is important to consider the pattern diagnosis processed by oriental physicians in developing statistical model for PIs. The discriminant model developed in this study using multiple indicators is valid, and can be used in the clinical fields.

The Case Study on Application of Software Reliability Analysis Model by Utilizing Failure History Data of Weapon System (무기체계의 고장 이력 데이터를 활용한 소프트웨어 신뢰도 분석 모델 적용 사례 연구)

  • Cho, Ilhoon;Hwang, Seongguk;Lee, Ikdo;Park, Yeonkyeong;Lee, Junghoon;Shin, Changhoon
    • Journal of Applied Reliability
    • /
    • v.17 no.4
    • /
    • pp.296-304
    • /
    • 2017
  • Purpose: Recent weapon systems in defense have increased the complexity and importance of software when developing multifunctional equipment. In this study, we analyze the accuracy of the proposed software reliability model when applied to weapon systems. Methods: Determine the similarity between software reliability analysis results (prediction/estimation) utilizing data from developing weapon systems and system failures data during operation of weapon systems. Results: In case of a software reliability prediction model, the predicted failure rate was higher than the actual failure rate, and the estimation model was consistent with actual failure history data. Conclusion: The software prediction model needs to adjust the variables that are appropriate for the domestic weapon system environment. As the reliability of software is increasingly important in the defense industry, continuous efforts are needed to ensure accurate reliability analysis in the development of weapon systems.

Development and Application of An Integrated Model for Quality Management Systems (품질경영시스템 통합모형 개발과 적용에 관한 연구)

  • Shin, W.S.;Yoo, J.S.;Na, S.B.
    • Journal of Korean Society for Quality Management
    • /
    • v.35 no.3
    • /
    • pp.75-87
    • /
    • 2007
  • This paper deals with an integration model of three major quality management systems. The well known global standards such as ISO 9001 quality system, Malcolm Baldrige model, and EFQM model are integrated as a prototype quality system. The proposed model is then applied to help a power generation company to select improvement tasks for enhancing quality management. Here, we discuss three quality management systems, an integration process of the three systems, the integrated model, and a real world application case.

RE circuit simulation for high-power LDMOS modules

  • fujioka, Tooru;Matsunaga, Yoshikuni;Morikawa, Masatoshi;Yoshida, Isao
    • Proceedings of the IEEK Conference
    • /
    • 2000.07b
    • /
    • pp.1119-1122
    • /
    • 2000
  • This paper describes on RF circuit simulation technique, especially on a RF modeling and a model extraction of a LDMOS(Lateral Diffused MOS) that has gate-width (Wg) dependence. Small-signal model parameters of the LDMOSs with various gate-widths extracted from S-parameter data are applied to make the relation between the RF performances and gate-width. It is proved that a source inductance (Ls) was not applicable to scaling rules. These extracted small-signal model parameters are also utilized to remove extrinsic elements in an extraction of a large-signal model (using HP Root MOSFET Model). Therefore, we can omit an additional measurement to extract extrinsic elements. When the large-signal model with Ls having the above gate-width dependence is applied to a high-power LDMOS module, the simulated performances (Output power, etc.) are in a good agreement with experimental results. It is proved that our extracted model and RF circuit simulation have a good accuracy.

  • PDF

Integrated Generation and Transmission Expansion Planning Using Generalized Bender’s Decomposition Method

  • Kim, Hyoungtae;Lee, Sungwoo;Kim, Wook
    • Journal of Electrical Engineering and Technology
    • /
    • v.10 no.6
    • /
    • pp.2228-2239
    • /
    • 2015
  • A novel integrated optimization method based on the Generalized Bender’s Decomposition (GBD) is proposed to combine both generation and transmission expansion problems. Most of existing researches on the integrated expansion planning based on the GBD theory incorporate DC power flow model to guarantee the convergence and improve the computation time. Inherently the GBD algorithm based on DC power flow model cannot consider variables and constraints related bus voltages and reactive power. In this paper, an integrated optimization method using the GBD algorithm based on a linearized AC power flow model is proposed to resolve aforementioned drawback. The proposed method has been successfully applied to Garver’s six-bus system and the IEEE 30-bus system which are frequently used power systems for transmission expansion planning studies.

An Integrated Expert Model for Delay Management in Construction Projects

  • jalal, Majid Parchami;Yousefi, Elham
    • Journal of Construction Engineering and Project Management
    • /
    • v.7 no.3
    • /
    • pp.1-14
    • /
    • 2017
  • Delay claim should actually be supported by a set of proper information so that the contractors could prove their validity. The so-called information should be able to clarify the relationship between delay events and how they impact on the whole project. Therefore, exploiting an integrated system by people who are involved in construction business would certainly prove helpful. In the present study, delay analysis methods have been investigated along with selecting a relatively comprehensive method which has been modified, and eventually, a novel model and its required modules have been proposed for evaluating delay claims. The suggested integrated model is formed to identify delayed events, to classify delays, to measure the impacts of delays on the project scheduling, and finally to estimate the damages which were caused by those so-called delays. A decision support system (DSS) model which is related to the integrated system is actually extracted from Iran's general contract conditions, that is, 4311 magazine (equivalent to red FIDIC book). It is then programmed and coded by C# program. This DSS model can be used as an input of Easy Plan program. In addition, at the end of this research, the coded DSS has been used along with the so-called program so that a modified and developed model could be generated.

A Study Integrated-Power-System Simulation Model of All-Electric-Ship (전기추진선박의 통합전력계통 시뮬레이션 모델에 관한 연구)

  • Ku, Hyun-Keun;Kwak, Ki-Kon;Kim, Jang-Mok
    • The Transactions of the Korean Institute of Power Electronics
    • /
    • v.20 no.1
    • /
    • pp.45-50
    • /
    • 2015
  • The simulation model of All-Electric-Ship consists of electrical and mechanical systems. Running the total simulation requires considerable time and causes a lack of computer memory, because the two systems have different dynamic characteristics. Therefore, integrated simulation is practically impossible. This paper proposes the simplified model of electrical system to reduce simulation time significantly, compared to the detailed model. The validity of the proposed simplified model is verified by comparing detailed and simplified simulation results. Thus, the simplified models are applied to the integrated system. As a result, total system simulation can be implemented.

Integration of Process Planning and Operations Scheduling by Process Net Model and Genetic Algorithm (공정 네트 모델과 유전 알고리즘에 의한 공정 계획과 일정 계획의 통합)

  • 박지형;강민형;노형민
    • Journal of the Korean Society for Precision Engineering
    • /
    • v.15 no.3
    • /
    • pp.82-87
    • /
    • 1998
  • In order to provide a manufacturing system with efficiency and flexibility to cope with the changes in shop floor status, the integration of process planning and operations scheduling is required. In this paper, an integrated system of process planning and operations scheduling based on the concept of process net model and genetic algorithm is suggested. The process net model includes the alternative process plans. The integrated system is applied for prismatic parts.

  • PDF

An Integrated Approach Using Change-Point Detection and Artificial neural Networks for Interest Rates Forecasting

  • Oh, Kyong-Joo;Ingoo Han
    • Proceedings of the Korea Inteligent Information System Society Conference
    • /
    • 2000.04a
    • /
    • pp.235-241
    • /
    • 2000
  • This article suggests integrated neural network models for the interest rate forecasting using change point detection. The basic concept of proposed model is to obtain intervals divided by change point, to identify them as change-point groups, and to involve them in interest rate forecasting. the proposed models consist of three stages. The first stage is to detect successive change points in interest rate dataset. The second stage is to forecast change-point group with data mining classifiers. The final stage is to forecast the desired output with BPN. Based on this structure, we propose three integrated neural network models in terms of data mining classifier: (1) multivariate discriminant analysis (MDA)-supported neural network model, (2) case based reasoning (CBR)-supported neural network model and (3) backpropagation neural networks (BPN)-supported neural network model. Subsequently, we compare these models with a neural networks (BPN)-supported neural network model. Subsequently, we compare these models with a neural network model alone and, in addition, determine which of three classifiers (MDA, CBR and BPN) can perform better. This article is then to examine the predictability of integrated neural network models for interest rate forecasting using change-point detection.

  • PDF