A STUDY ON ANALYSIS OF DELIVERY & CONTRACT SYSTEM FOR INTRODUCTION OF THE INTEGRATED PROJECT DELIVERY (IPD) TO KOREA - Focusing on Delivery and Contract of Public Works -

  • Sulmin Song;Seong-Ah Kim;Yea-Sang Kim;Sangyoon Chin
    • International conference on construction engineering and project management
    • /
    • 2011.02a
    • /
    • pp.142-148
    • /
    • 2011
  • Recently, much attention has been increasingly paid to the efficiency of the delivery system in order to manage construction project in a smooth and effective way. The integrated plan in consideration of the life cycle of building is required for the effective and integrated management of information in a huge amount. To this end, collaboration between each field is indispensable from the beginning of project. But there is a limitation that the designer and the constructor sign the contract separately in the conventional delivery system. In the US, the recent trend is that the Integrated Project Delivery (IPD) has been introduced to improve the effectiveness of project management in an increasing number of the cases where project is implemented by utilizing the IPD. In Korea, there is also an increasing need to introduce the IPD for the integrated project management. Consequently, the purpose of this study is to examine and analyze the laws and the contracts that are applied to domestic cases of placing order and signing contract based on the concept and principle of the IPD before the actual introduction of the IPD. Based on such examination and analysis, this study intends to figure out the constraints to the introduction of the IPD. It is expected that the results of this study will be used as basic data for IPD-related study in the future.

  • PDF

The Development of Cloud Computing-Based Integrated EHS Management System for the Construction Companies (클라우드 컴퓨팅 기반 건설사용 EHS 통합관리시스템 개발)

  • Seo, Kwang-Kyu
    • Proceedings of the KAIS Fall Conference
    • /
    • 2010.11b
    • /
    • pp.859-861
    • /
    • 2010
  • The construction companies are facing potential EHS(Environment, Health & Safety) of major accidents to cause casualties or a financial loss and increasing social responsibility. So, they have to voluntarily accomplish the EHS management system rather than passively with regard to EHS regulation. In this study, the integrated EHS management system is developed based on cloud computing, and construction companies are to materialize self-regulation EHS process of construction workplace and to standardize the total EHS business process using the developed system. The proposed system also provides risk analysis, education/control and continuous improvement for EHS tasks and users can easily access the system on the web at a low price through cloud computing service. Eventually, the integrated system contributes to the managerial improvement by minimizing economic and physical loss caused by construction accidents.

  • PDF

Development of Unique Registration Number System for Construction Site Integrated DB (건설 통합DB 구축을 위한 시공현장등록번호 체계 개발)

  • Hur, Youn Kyoung;Lee, Seung Woo;Yoo, Wi Sung;Kim, Sung Hwan;Sung, Yookyung
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2023.05a
    • /
    • pp.367-368
    • /
    • 2023
  • Kiscon, Seumteo, KONEPS and CSI are representative construction-related DBs. All four DBs are operated by the public. However, the characteristics of data are different depending on the purpose. Therefore, it is difficult to utilize integrated data and it is only used sparingly. Creating and sharing a unique key that can identify a construction site will enable integrated accumulation and management of construction-related data for various purposes. At this point, it is most efficient to assign a unique key based on KISCON. KISCOn data conforms to the construction site definition and covers most of the public, private, architectural and civil works. In addition, there is an advantage in that DB construction is performed in the construction situation, which is a relatively preceding process. In the future, it is necessary to create a practical construction site integrated DB through the production of an integrated key table containing linkage information of unique keys for site management, performance indicators, and statistics production.

  • PDF

Integrated Management System of Construction Documents and Drawings by Construction Information Classification System (건설정보 분류체계에 의한 설계도서 통합 관리 방안)

  • Seo Jung-Hun;Park Seong-Sik;Kang Leen-Seok
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.589-592
    • /
    • 2003
  • Our government suggested an integrated construction information classification system (CICS) for improving construction information exchange between project participants. However, because a database for integrating construction documents and drawings is insufficiently built, there are many restrictions in using CICS. Therefore, this study suggests a methodology to integrate and manage the construction documents and drawings by CICS. The methodology suggested in the study is verified to a web-based construction documents and drawings management system with integrated DB.

  • PDF

QUANTITATIVE ANALYSES USING 4D MODELS - AN EXPLORATIVE STUDY

  • Rogier Jongeling;Jonghoon Kim;Claudio Mourgues;Martin Fischer;Thomas Olofsson
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.830-835
    • /
    • 2005
  • 4D models help construction planners to develop and evaluate construction plans. However, current analyses using 4D models are mainly visual and limit the quantitative comparison of construction alternatives. This paper explores the usefulness of extracting quantitative information from 4D models to support time-space analyses. We use two 4D models of an industry test case to illustrate how to analyze 4D content quantitatively (i.e., work space areas and distances between concurrent activities). This paper shows how these two types of 4D content can be extracted from 4D models to support 4D-based-analysis and novel presentation of construction planning information. We suggest further research to formalize the content of 4D models to enable comparative quantitative analyses of construction planning alternatives. Formalized 4D content will enable the development of reasoning mechanisms that automate 4D-model-based analyses and provide the information content for informative presentations of construction planning information.

  • PDF

Definition of the Modernized Hanok Information based on the OWL (온톨로지 개념 기반의 신한옥 건설정보 정의)

  • Lee, Heewoo;Lee, Yunsub;Lee, Minyong;Jung, Youngsoo
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2021.05a
    • /
    • pp.96-97
    • /
    • 2021
  • In the 4th Industrial Revolution and changes in the construction industry market, the importance of information management is becoming more emphasized. For efficient use of information, construction data must be collected, processed and analyzed more quickly and accurately, depending on the purpose of the project. Thus, data could be utilized as integrated knowledge. However, there is a limit to searching or managing construction information produced in various formats over the entire life cycle by index words. Therefore, this study proposes a construction information integrated management plan that reflects the characteristics of the construction industry by applying the OWL concept. For this, as an initial study, an architectural object of small size and clear features was needed. Therefore, a construction information management study using OWL was conducted for Korean traditional architectural style houses (Hanok) which has these characteristics.

  • PDF

A FRAMEWORK FOR ACTIVITY-BASED CONSTRUCTION MANAGEMENT SIMILATION

  • Boong Yeol Ryoo
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.732-737
    • /
    • 2009
  • Due to various project delivery methods and the complexity of construction projects in the construction industry, developing the framework of construction management for critical, highly complex projects in the construction industry has become problematic. Currently, a set of construction manuals play a pivotal role in planning and managing construction projects as subcontractors try to complete their scope of work according to the instructions of a general contractor. It is challenging for general contractors to write a construction management procedure manual to cover various types of project delivery methods and construction projects. In construction, the construction procedure manuals describe specific actions to be taken through the project. In reality a few contactors own such manuals and their construction schedules include more construction operation activities. Thus, it is hard to estimate the workload and productivity of construction managers because the manual and the schedule do not present the amount of management efforts required to complete a project. This paper proposes a framework to present construction management tasks according to project delivery methods which can be applied to various construction projects. Actions for management tasks were mapped and were integrated with construction activities throughout the project life cycle. The framework can then be used to give specific instructions to project participants, collect management actions, and replicate management actions throughout the project life cycle. The framework can also be can used to visualize complete construction project to analyze and manage construction management activities in each phase of a project in order to enhance productivity and efficiency. The studies of existing construction manuals were carried out to identify construction managers' responsibilities. An artificial intelligence program, CLIPS (C-Language Integrated Production System) was used to search for appropriate actions for impending tasks from a set of predefined actions to be performed for a given situation. The framework would significantly help construction managers to understand interrelations among management tasks or actions within a project. Furthermore, the framework can be embedded into Building Information Modeling (BIM) or Facility Management Systems (FMS) so that designers and constructors would execute constructability review before construction begins.

  • PDF

Integrated Knowledge Management System based on Construction Portal (건설포탈 기반통합형 지식관리시스템)

  • Park, Moon-Seo;Jang, You-Jin;Lee, Hyun-Soo;Yoon, You-Sang
    • Korean Journal of Construction Engineering and Management
    • /
    • v.11 no.4
    • /
    • pp.12-21
    • /
    • 2010
  • Construction companies recently have been highly interested in developing information system as following the advanced of IT technology. Especially, with advent of knowledge-based paradigm, Knowledge Management System(KMS) has been actively built. However, current KMS is not optimized and not satisfied because KMS is not integrated with existing information system and has problems of method of knowledge management. The objectives of this research is to develop integrated KMS, which synthesizes knowledge and functions of scattered information system. This research investigates current KMS and analyzes the requirements of KMS. Based on the requirements, the utilization of construction portal is suggested. And integrated knowledge management method, which has connections with applications in construction portal, is suggested and the system is developed.

Development of Construction Project Control System for Large Sized Construction by Process and Data Modeling (대형건설공사의 프로세스 및 데이터 모델링을 통한 건설프로젝트관리체계 구축에 관한 연구)

  • Choi Yoon-Ki;Lee Hyun-Soo;Hwang Young-Sam;Kim Young-Suk;Kim Woo-Young;Song Young-Woong
    • Korean Journal of Construction Engineering and Management
    • /
    • v.5 no.2 s.18
    • /
    • pp.153-161
    • /
    • 2004
  • The systematic material and labor management planning should be established on accomplished EVM data. The matrix method of integrated cost and schedule was used with common category concept according to the construction project control system. The construction project control system was suggested through analyzing process and data modeling based on integrated cost, schedule and material. Information of construction project can be developed the relationship between the field data and the integrated cost, schedule database. Process and data modelling is provide a standard data format which are related to the material, labor management based on integrated cost, schedule database.

A study on the integrated data modeling for the plant design management system and the plant design system using relational database (관계형 데이터베이스를 이용한 PDMS/PDS의 통합 데이터 모델링에 관한 연구)

  • 양영태;김재균
    • Journal of Ocean Engineering and Technology
    • /
    • v.11 no.3
    • /
    • pp.200-211
    • /
    • 1997
  • Most recently, offshore Engineering & Construction field is concerned about integration management technology such as CIM(Computer Integrated Manufacturing), PDM(Product Data Management) and Enterprise Information Engineering in order to cope with the rapid change of engineering and manufacturer specification as per owner's requirement during construction stage of the project. System integration and integrated data modeling with relational database in integration management technology improve the quality of product and reduce the period of the construction project by reason of owing design information jointly. This paper represents the design methodology of system integration using Business Process Reengineering by the case study. The case study is about the offshore plant material information process from front end engineering design to detail engineering for the construction and the basis of monitoring system by integrating and sharing the design information between the 2D intelligent P&ID and 3D plant modeling using relational database. As a result of the integrated data modeling and system integration, it is possible to maintain the consistency of design process in point of view of the material balancing and reduce the design assumption/duration. Near future, this system will be expanded and connected with the MRP(Material Requirement Planing) and the POR (Purchase Order Requisition) system.

  • PDF