• Title/Summary/Keyword: instream flow

Search Result 111, Processing Time 0.025 seconds

Analysis of Scenarios for Environmental Instream Flow Considering Water Quality in Saemangeum Watershed (새만금유역의 수질을 고려한 환경유지용수의 시나리오 분석)

  • Kim, Se-Min;Park, Young-Ki;Won, Chan-Hee;Kim, Min-Hwan
    • Journal of Korean Society of Environmental Engineers
    • /
    • v.38 no.3
    • /
    • pp.117-127
    • /
    • 2016
  • In this study, analyzed scenarios of the environmental instream flow for water quality improvement in Saemangeum watershed. In order to get an environmental instream flow, Methodology is selected for Retention-Basin, reservoir expansion, new dam construction, Modification of water intake and drainage system, Rearrangement of plan for system which Yongdam and Seomjin river dam have been used water supply. The study composed of diverse scenario of Environmental instream flow increasement and analyzed the effect of improving the water quality by the QUAL2K model and calculation of runoff for saemangeum watershed by SWAT model. The following water quality indicators have been simulated in irrigation and non-irrigation period for BOD and T-P. When scenarios applied to water quality model, Improvement rate in the water quality for Total Maximum Daily loads of Mankyung B unit watershed during irrigation and non-irrigation period is BOD (28.70%), T-P (17.09%) and BOD (28.51%), T-P (28.68%) respectively. Dongjin A unit watershed during irrigation and non-irrigation period is BOD (14.39%), T-P (14.59%) and BOD (15.54%), T-P (19.46%) similary. Simulation results is to quantify the constribution of the improvement in the water quality. In particular, It was demonstrative that improving effect for water quality was evaluated to be great in non-irrigation period.

Increasing Instream flow in Nonsancheon by Water Storage Securing Scenario of Upstream Reservoirs (상류 저수지군의 저수량 확보 시나리오에 의한 논산천의 유지유량 증가)

  • Noh, Jae-Kyoung
    • Korean Journal of Agricultural Science
    • /
    • v.36 no.1
    • /
    • pp.99-109
    • /
    • 2009
  • This study was performed to evaluate the effect of increasing instream flow at Nonsancheon stream of Nonsan city by securing water storages in upstream reservoirs; Ge-ryong, Gyoung-cheon, Dae-dun, and Tab-jeong. The paralleled and cascaded upstream reservoir operations for 8 storage securing scenarios were considered to simulate daily streamflows at Nonsan station. Using Tab-jeong reservoir water storage, the DAWAST model's parameters were determined, and the verified result showed Nash-Schcliffe's coefficient of 0.666. Instream flows were analyzed to supply maximum $59.85Mm^3$ on an annually average from upstream reservoir storage securing scenarios. The storage securing set of 2 m heightened Ge-ryong, 5 m Dae-dun, and 1 m Tab-jeong showed that the additional secured water storages were $17.132Mm^3$ and instream flow at Nonsan station was increased to $2.183m^3/s$, 2 times of present condition.

  • PDF

Urban Instream Flow Augmentation Using Reclaimed Water in Korea (하수처리수 재이용을 통한 도시하천 물순환 및 수질 개선)

  • Jee, Yong-Keun;Ahn, Jong-Ho;Lee, Jin-Hee
    • Journal of Korean Society of Water and Wastewater
    • /
    • v.26 no.2
    • /
    • pp.285-294
    • /
    • 2012
  • Current urban stream conditions and their restoration projects were investigated by surveying the urban stream management experts in 29 cities with high population density (more than 1,000person/$km^{2}$). The survey results showed that the ratio of covered urban streams decreased by 1.4% (from 14% to 12.6%) in the last 5 years through steady river restoration projects promoted by governments. Nonetheless, 36.3% of 369 urban streams surveyed still report stream depletion problems; therefore, more efforts to alleviate the problems caused by distorted water circulation of urban streams are still necessary. Water depletion in many local urban streams, unlike national rivers, is accelerated due to negligence in stream management, budget shortage, and other reasons. To prevent stream depletion, the use of reclaimed water is suggested as one of the prevention plans. When available amounts of reused sewage are estimated through actual available nationwide sewage discharges of each watershed and instream flow of stream, annual instream flow supply of 780 million $m^{3}$ is expected; 4.8% reduction in the pollution load of public sewer treatment facilities is expected; and the creation of new value through water reuse service is expected. Thus, it is important for the reviews of feasibility and alternatives of water reuse projects for flow augmentation to consider not only investment budget reductions, but also environmental aspects. Also it is necessary to provide the financial support of unified government with strict water quality management policy.

Planning for Securing Instreamflow of Gapcheon Stream in Daejeon (대전 갑천의 유지유량 확보 방안)

  • Noh, Jae-Kyoung
    • Korean Journal of Agricultural Science
    • /
    • v.36 no.1
    • /
    • pp.87-98
    • /
    • 2009
  • The objective of this study is to evaluate the effect of increasing instream flow at Gapcheon stream of Daejeon city by considering two virtual reservoirs upstream, respectively; Geum-gok reservoir and Koe-gok reservoir upstream, respectively. The paralleled and cascaded reservoir operations were performed including the existing Jang-an and Bang-dong reservoirs. The results are summarized as follows. Firstly, from the Bang-dong and Geum-gok cascaded reservoir's water balance analysis, instream flow of $6.83Mm^3$ was able to be supplied to downstream, and water supply indexes of Geum-gok reservoir were analyzed to have the rate of water supply divided by watershed area of 403.4 mm, the rate of water supply divided by rainfall of 33.0 %, the rate of water supply divided by inflow of 96.4 %, the rate of water supply divided by storage capacity of 81.9 %, and the rate of inflow divided by storage capacity of 112.3 %. Secondly, from the Jang-an and Geum-gok paralleled reservoir's water balance analysis, flow durations at Gapcheon station were analyzed to have Q95 (the 95th high flow) of $4.806m^3/s$, Q185 (the 185th high flow) of $2.217m^3/s$, Q275 (the 275th high flow) of $1.140m^3/s$, and Q355 (the 355th high flow) of $0.887m^3/s$. Thirdly, inflow to Koe-gok reservoir was simulated including the Jang-an and Bang-dong paralleled reservoir's water balance analysis, instream flow of $49.60Mm^3$ was able to be supplied from Koe-gok reservoir to downstream, and water supply indexes of Koe-gok reservoir were analyzed to have the rate of water supply divided by watershed area of 246.5 mm, the rate of water supply divided by rainfall of 19.4 %, the rate of water supply divided by inflow of 40.8 %, the rate of water supply divided by storage capacity of 412.1 %, and the rate of inflow divided by storage capacity of 1,189.8 %. Fourthly, daily streamflows at Gapcheon stream were simulated including outflows from Koe-gok reservoir, flow durations at Gapcheon station were analyzed to have Q95 (the 95th high flow) of $4.501m^3/s$, Q185 (the 185th high flow) of $2.277m^3/s$, Q275 (the 275th high flow) of $1.743m^3/s$, and Q355 (the 355th high flow) of $1.564m^3/s$. The conclusion appeared that the effect of increasing instream flow at Gapcheon stream from Koe-gok reservoir was more higher than that from Geum-gok reservoir.

  • PDF

Determination of Instreamflow Requirement for Upstream Urban Watershed Using SWAT Model (SWAT 모형을 이용한 도시하천 상류유역의 하천유지유량 산정방안)

  • Lee Kil-Seong;Chung Eun-Sung;Shin Mun-Ju;Kim Young-Oh
    • Journal of Korea Water Resources Association
    • /
    • v.39 no.8 s.169
    • /
    • pp.703-716
    • /
    • 2006
  • The flow duration curves in the present and the ideal hydrologic cycle were derived using SWAT model. The present situation is the landuse and the groundwater withdrawal in the year of 2000 and the ideal situation is the landuse of 1975 and no groundwater withdrawal. These results were compared with the previous instream flow requirements which are the larger flow between the average drought flow and environmental control flow. As a result, the present and ideal drought flows of Ojeoncheon, Hakuicheon, Samseongcheon, and Sammakcheon, were the same and the drought flows of Samseongcheon and Sammakcheon were even zero since the baseflow is very little due to the small and mountainous watersheds. The previous instream flow requirement for the riverine function is also larger than the low flow of the ideal hydrologic cycle. The present method to set the instream flow requirement is not proper for the small mountainous watershed since it can be usually overestimated and drive the artificial measures to secure the streamflow Therefore, another method should be developed such as the low flow and the average flow between the drought flow and the low flow of the ideal hydrologic cycle using the proper hydrologic simulation model such as SWAT which can consider the landuse.

Estimation of Suitable Flow Needs for Maintaining Fish Habitat Conditions Using Water Quantity and Quality Simulation (수량.수질 모의치를 이용한 어류 서식 조건 유지에 필요한 적정 유량 산정)

  • Kim, Gyu-Ho;Jo, Won-Cheol;Jeon, Byeong-Ho
    • Journal of Korea Water Resources Association
    • /
    • v.33 no.1
    • /
    • pp.3-14
    • /
    • 2000
  • The primary objective of this study is to estimate the suitable flow in need for conservation and restoration of the fish habitat in running water ecosystem, which has very important status in the instream flow for stream environment. Year, monthly low flows are estimated to properly maintain the fish habitat. Water depth and velocity are simulated, and also water temperature and Dissolved Oxygen(DO) are predicted at gradually varied flow using estimated low flows. These simulated conditions for each low flow are graphically compared with the requirements to maintain fish habitat at each life stage. These processes were applied to 3 riffle transects located at Dalcheon(Dal stream) in the South Han river. Pirami (Zacco platypus) was selected as a representative fish species in Dalcheon. It was shown that the suitable flow for maintaining the representative fish habitat at each life stage depends on hydraulic conditions rather than water quality conditions, and the flow ranges from the 10-year minimum low flow to consecutive 7-day 2.33-year low flow.w flow.

  • PDF

Estimation of ecological flow rate for Zacco platypus based on habitat suitability index considering probability density function (확률밀도함수를 고려한 서식처 적합도 지수에 의한 피라미 생태유량 산정)

  • Jang, Kyeung Ho;Park, Young Ki;Kang, Jae Il;Kim, Min Hwan
    • Journal of Korea Water Resources Association
    • /
    • v.51 no.3
    • /
    • pp.207-219
    • /
    • 2018
  • In this study, the ecological flow rate of the Zacco playtypus habitat was simulated based on the Instream Flow Incremental Methodology (IFIM) in reachs of urban and natural stream using the habitat suitability index (HSI) of the probability density function (PDF). To apply this method, PHABSIM model was used in this study. However, in this study, the HSI of the probability density function was developed by adjusting the parameters of the PDF based on Kang (2010) HSI. As a result, the normal distribution is closest to the ecological flow rate of the Kang (2010) in the urban stream. However, the two-parameter log-pearson distribution tended to be the closest in the natural stream. The ecological flow rate was simulated by the HSI and the reach of stream with the PDF. Based on the comparison of simulation results, we propose an ecological flow rate estimation method using probabilistic method.