• Title/Summary/Keyword: installation

Search Result 12,379, Processing Time 0.036 seconds

Experimental Study for Installation Damage Assessment of Geogrid (지오그리드의 시공중 손상 평가를 위한 실험적 연구)

  • Cho, Sam-Deok;Lee, Kwang-Wu;Oh, Se-Yong
    • Journal of the Korean Society of Environmental Restoration Technology
    • /
    • v.8 no.1
    • /
    • pp.27-36
    • /
    • 2005
  • Geosynthetic reinforcements may be damaged during its installation in the filed. The installation damage mainly depends on two factors such as materials used and construction activities. This paper describes the results of a series of field tests, which are conducted to assess the installation damage of geogrid according to different maximum grain sizes of fills (40, 60, and 80 mm). These tests are done in three sites for twelve different kinds of geogrids. After field tests, the changes in tensile strength of the geogrids is determined from wide width tensile tests using both damaged and undamaged specimens. In the results of tests, tensile strength of the relatively flexible geogrids after field installation tests was decreased about from 20% to 40% according to the increment of the maximum grain size. On the other hand, for the relatively stiff geogrids, the loss of the tensile strength after site installation was examined below 5.2% independent of the maximum grain size of the soils. The results of this study show that the installation damage significantly depends on the stiffness of geogrid and is more obvious to a flexible geogrid and a fill material having higher maximum grain size.

Analysis of Transient Voltage by Lightning Stroke at 345kV Step-up Transformer (345kV 승압용 변전소의 뇌격에 의한 이상전압 해석)

  • Cho, Man-Young;Shin, Ho-Jeon;Huh, Jae-Sun;Kim, Jae-Chul
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.26 no.10
    • /
    • pp.95-101
    • /
    • 2012
  • Typically, large scale power generation facilities are linked to 345kV transmission line through a step-up transformer. If the value of transient voltage by generating lightning stroke is large more than electric equipment's BIL, devices insulation is destroyed. LA(Lighting Arrester) is used as a main means of prevention. However, the installation of LA takes the constraints of installation place and expensive installation costs. Therefore, we need to carefully study whether installation of installation can be omitted and the most efficient place of installation. In this paper, we simulated the transient voltage detected by lightning stroke at each equipments in the 345kV transmission power grid by using EMTP-RV program.

A Study of Structural Stability of HDPE Pipe during Installation (고밀도 폴리에틸렌 파이프의 설치중 구조안정성에 대한 연구)

  • Song, Hyun-Bae;Kim, Do-Kyun;Choi, Han-Suk;Park, Kyu-Sik
    • Journal of the Korean Society for Advanced Composite Structures
    • /
    • v.6 no.1
    • /
    • pp.59-66
    • /
    • 2015
  • In this study, structural stability of large diameter high density polyethylene (HDPE) pipe during installation was numerically investigated in order to investigate the effect of concrete collar dimension, water depth and tension (pulling force). From the numerical simulation results, the total stress of HDPE pipe with designed concrete collar was within 2.5%, so the total weight of concrete collar for sinking of HDPE is important rather than concrete collar dimension. Furthermore, the tension area for possible installation is decreased as the air filling rate is increased. Therefore, it is important to calculate the reasonable tension range before actual installation for safe installation of HDPE pipe.

Characteristics of Driving Efficiency and Bearing Capacity for Non-welded Long Steel Pipe Pile Method (무용접 장대강관말뚝 공법의 항타 및 지지력 특성)

  • 백규호;이상일;박진석
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 1999.10a
    • /
    • pp.381-388
    • /
    • 1999
  • The existing methods for installation of long steel pipe pile have some uneconomical problems such as increase of installation cost and period due to the welding of two piles and removal of soil plug, and decrease of driving efficiency due to the increase of driving resistance by time effect during the welding of piles and removal of soil plug, etc. Thus, in this study, new installation method for long steel pipe pile is suggested to work out the existing problems, and calibration chamber tests are peformed to investigate both driving and economical efficiency for the suggested method. The test results showed that the new installation method has increase bearing capacity as well as reduce installation cost and period for long steel pipe piles as compared with existing methods.

  • PDF

Interpretational Consideration of Geosynthetics Shear Behaviors (지오신세틱스 전단거동의 해석학적 고찰)

  • Jeon, Han-Yong;Kim, Cho-Rong
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2010.09a
    • /
    • pp.293-302
    • /
    • 2010
  • 2 types of geogrids and geotextiles was used to evaluate shear behaviors after installation damage test. Shear behaviors were compared after installation damage test and coefficient of resistance to direct sliding($f_{ds}$) was estimated by theoretical shear analysis. Shear strength of damaged geogrid decreased under high normal stress of 150kPa and shear strength of geotextile decreased with increasing normal stress. It is seen that $f_{ds}$ values after installation damage decreased than before installation damage through comparison calculated $f_{ds}$ by direct theoretical shear analysis. $f_{ds}$ values to be calculated by theoretical shear analysis were changed with before and after installation damage.

  • PDF

Protection Effects Associated with Installation Conditions of SPD (SPD의 설치조건이 보호효과에 미치는 영향)

  • Lee, Bok-Hee;Lee, Dong-Moon;Jeong, Dong-Cheol;Lee, Seung-Chil
    • Proceedings of the Korean Institute of IIIuminating and Electrical Installation Engineers Conference
    • /
    • 2005.05a
    • /
    • pp.298-302
    • /
    • 2005
  • This paper presents the protection effect of SPDs according to installation conditions. To develop the effective protection countermeasures of information and communication equipments against lightning surges, actual-sized experiments in relation to the protection effects on the installation positions of surge protective devices(SPDs), the length of branch circuit the materials and long of conduit were conducted. The best method for protecting the electronic equipments from surges is to install the SPD at the front point of the devices to be protected. The installation method of the metal conduit bonded with common ground conductor were more effective than that of the PVC conduit.

  • PDF

A novel approach for predicting lateral displacement caused by pile installation

  • Li, Chao;Zou, Jin-feng;Li, Lin
    • Geomechanics and Engineering
    • /
    • v.20 no.2
    • /
    • pp.147-154
    • /
    • 2020
  • A novel approach for predicting lateral displacement caused by pile installation in anisotropic clay is presented, on the basis of the cylindrical and spherical cavities expansion theory. The K0-based modified Cam-clay (K0-MCC) model is adopted for the K0-consolidated clay and the process of pile installation is taken as the cavity expansion problem in undrained condition. The radial displacement of plastic region is obtained by combining the cavity wall boundary and the elastic-plastic (EP) boundary conditions. The predicted equations of lateral displacement during single pile and multi-pile installation are proposed, and the hydraulic fracture problem in the vicinity of the pile tip is investigated. The comparison between the lateral displacement obtained from the presented approach and the measured data from Chai et al. (2005) is carried out and shows a good agreement. It is suggested that the presented approach is a useful tool for the design of soft subsoil improvement resulting from the pile installation.

A study on the improvement for installation guide of soundproofing facilities in construction site (공사장 방음시설 설치기준 개선방안에 관한 연구)

  • Park, Young-Min;Kim, Kyoung-Min
    • Journal of Environmental Impact Assessment
    • /
    • v.22 no.4
    • /
    • pp.361-367
    • /
    • 2013
  • Noise and vibration occurs during construction intermittently, but with the most arise complaints. There is a need to efficiently manage the construction noise and vibration problems because in case a residential facility that requires calmness around the construction site adversely affects the living conditions of nearby residents. The ministry of environment has mandating the installation of soundproofing facilities for the management of construction noise. In order to enforce a particular construction, the mandatory install with soundproofing facilities before the start of construction, and after construction. However, Installation guide of soundproofing facilities for construction sites were not considered affected areas by noise and there is no provision of performance evaluation for soundproofing facilities. In this study, investigated the status and problems of the installation guide for soundproofing facilities in construction sites, we propose an efficient installation guide of soundproofing facilities for the reduction construction noise.

Determination and application of installation sequence of piping systems in cramped spaces of ships and offshore structures considering geometric relationship of pipe elements

  • Jang, MiSeon;Nam, Jong-Ho
    • International Journal of Naval Architecture and Ocean Engineering
    • /
    • v.12 no.1
    • /
    • pp.60-70
    • /
    • 2020
  • The outfitting design of ships and offshore structures is mainly undertaken in a restricted space. Pipes occupying a large portion of outfitting design are normally manufactured outside the shipyard. This complicated manufacturing process results in frequent delivery delays. Inevitable design modifications and material changes have also resulted in inefficient pipe installation works. In this study, an algorithm is proposed to systematically determine the pipe installation sequence. An accurate and fast algorithm to identify the geometric relationship of piping materials is presented. To improve the calculation efficiency, the interference is gradually examined from simplified to complicated shapes. It is demonstrated that the calculation efficiency is significantly improved with successive geometric operations such as back-face culling and use of bounding boxes. After the final installation sequence is determined, the entire installation process is visualized in a virtual reality environment so that the process can be rendered and understood for a full-scale model.

KO AC/DC Converter System Installation Status and Commissioning Plan at ITER Site (이터 초전도자석 전원공급장치 현장 설치현황 및 시운전 계획)

  • Song, Inho;Oh, Jong-Seok
    • The Transactions of the Korean Institute of Power Electronics
    • /
    • v.27 no.5
    • /
    • pp.397-401
    • /
    • 2022
  • The construction of the ITER tokamak machine is ongoing at a 77% process rate to achieve the first plasma in 2025. The 18 sets of power supply systems comprising 400 MVA thyristor AC/DC converters for the superconducting magnets supplied by Korea (KO) are being installed with other systems, such as PF converters (China), DC busbars (Russia), and cooling water systems (India), in two buildings (Europe). The system interfaces have been defined during the design stage, and the systems have been manufactured. However, during the on-site installation work, several installation and integration issues emerged due to the manufacturing tolerance and design mistakes. To continue the installation and testing, the engineers of each system resolved the interface issues, planned the commissioning, and integrated the test plan. This paper describes the on-site installation status and issues and the commissioning plan of KO AC/DC converters.