• Title/Summary/Keyword: inflow

Search Result 2,842, Processing Time 0.024 seconds

Calculation of Unit Hydrograph from Discharge Curve, Determination of Sluice Dimension and Tidal Computation for Determination of the Closure curve (단위유량도와 비수갑문 단면 및 방조제 축조곡선 결정을 위한 조속계산)

  • 최귀열
    • Magazine of the Korean Society of Agricultural Engineers
    • /
    • v.7 no.1
    • /
    • pp.861-876
    • /
    • 1965
  • During my stay in the Netherlands, I have studied the following, primarily in relation to the Mokpo Yong-san project which had been studied by the NEDECO for a feasibility report. 1. Unit hydrograph at Naju There are many ways to make unit hydrograph, but I want explain here to make unit hydrograph from the- actual run of curve at Naju. A discharge curve made from one rain storm depends on rainfall intensity per houre After finriing hydrograph every two hours, we will get two-hour unit hydrograph to devide each ordinate of the two-hour hydrograph by the rainfall intensity. I have used one storm from June 24 to June 26, 1963, recording a rainfall intensity of average 9. 4 mm per hour for 12 hours. If several rain gage stations had already been established in the catchment area. above Naju prior to this storm, I could have gathered accurate data on rainfall intensity throughout the catchment area. As it was, I used I the automatic rain gage record of the Mokpo I moteorological station to determine the rainfall lntensity. In order. to develop the unit ~Ydrograph at Naju, I subtracted the basic flow from the total runoff flow. I also tried to keed the difference between the calculated discharge amount and the measured discharge less than 1O~ The discharge period. of an unit graph depends on the length of the catchment area. 2. Determination of sluice dimension Acoording to principles of design presently used in our country, a one-day storm with a frequency of 20 years must be discharged in 8 hours. These design criteria are not adequate, and several dams have washed out in the past years. The design of the spillway and sluice dimensions must be based on the maximun peak discharge flowing into the reservoir to avoid crop and structure damages. The total flow into the reservoir is the summation of flow described by the Mokpo hydrograph, the basic flow from all the catchment areas and the rainfall on the reservoir area. To calculate the amount of water discharged through the sluiceCper half hour), the average head during that interval must be known. This can be calculated from the known water level outside the sluiceCdetermined by the tide) and from an estimated water level inside the reservoir at the end of each time interval. The total amount of water discharged through the sluice can be calculated from this average head, the time interval and the cross-sectional area of' the sluice. From the inflow into the .reservoir and the outflow through the sluice gates I calculated the change in the volume of water stored in the reservoir at half-hour intervals. From the stored volume of water and the known storage capacity of the reservoir, I was able to calculate the water level in the reservoir. The Calculated water level in the reservoir must be the same as the estimated water level. Mean stand tide will be adequate to use for determining the sluice dimension because spring tide is worse case and neap tide is best condition for the I result of the calculatio 3. Tidal computation for determination of the closure curve. During the construction of a dam, whether by building up of a succession of horizontael layers or by building in from both sides, the velocity of the water flowinii through the closing gapwill increase, because of the gradual decrease in the cross sectional area of the gap. 1 calculated the . velocities in the closing gap during flood and ebb for the first mentioned method of construction until the cross-sectional area has been reduced to about 25% of the original area, the change in tidal movement within the reservoir being negligible. Up to that point, the increase of the velocity is more or less hyperbolic. During the closing of the last 25 % of the gap, less water can flow out of the reservoir. This causes a rise of the mean water level of the reservoir. The difference in hydraulic head is then no longer negligible and must be taken into account. When, during the course of construction. the submerged weir become a free weir the critical flow occurs. The critical flow is that point, during either ebb or flood, at which the velocity reaches a maximum. When the dam is raised further. the velocity decreases because of the decrease\ulcorner in the height of the water above the weir. The calculation of the currents and velocities for a stage in the closure of the final gap is done in the following manner; Using an average tide with a neglible daily quantity, I estimated the water level on the pustream side of. the dam (inner water level). I determined the current through the gap for each hour by multiplying the storage area by the increment of the rise in water level. The velocity at a given moment can be determined from the calcalated current in m3/sec, and the cross-sectional area at that moment. At the same time from the difference between inner water level and tidal level (outer water level) the velocity can be calculated with the formula $h= \frac{V^2}{2g}$ and must be equal to the velocity detertnined from the current. If there is a difference in velocity, a new estimate of the inner water level must be made and entire procedure should be repeated. When the higher water level is equal to or more than 2/3 times the difference between the lower water level and the crest of the dam, we speak of a "free weir." The flow over the weir is then dependent upon the higher water level and not on the difference between high and low water levels. When the weir is "submerged", that is, the higher water level is less than 2/3 times the difference between the lower water and the crest of the dam, the difference between the high and low levels being decisive. The free weir normally occurs first during ebb, and is due to. the fact that mean level in the estuary is higher than the mean level of . the tide in building dams with barges the maximum velocity in the closing gap may not be more than 3m/sec. As the maximum velocities are higher than this limit we must use other construction methods in closing the gap. This can be done by dump-cars from each side or by using a cable way.e or by using a cable way.

  • PDF

Inflow at Ssangyongmun Gate During the Goryeo Dynasty and Its Identity (고려시대 쌍룡문경(雙龍紋鏡) 유입(流入)과 독자성(獨自性))

  • Choi, Juyeon
    • Korean Journal of Heritage: History & Science
    • /
    • v.52 no.2
    • /
    • pp.142-171
    • /
    • 2019
  • The dragon is an imaginary animal that appears in the legends and myths of the Orient and the West. While dragons have mostly been portrayed as aggressive and as bad omens in the West, in the Orient, as they symbolize the emperor or have an auspicious meaning, dragons signify a positive meaning. In addition, as the dragon symbolizes the emperor and its type has been diversified considering it as a divine object that controls water, people have tried to express it as a figure. The records related to dragons in the Goryeo dynasty appeared with diverse topics in 'History of Goryeo' and are generally contents related to founding myths, rituals for rain, and Shinii (神異), etc. The founding myth emphasizes the legality of the Goryeo dynasty through the dragon, and this influenced the formation of the dragon's descendants. In addition, the ability to control water, which is a characteristic of the dragon, was symbolized as an earth dragon related to the rainmaking ritual, i.e., wishing for rain during times of drought. Since the dragon was the symbol of the royal family, the use of the dragon by common people was strictly restricted. Furthermore, the association of a bronze dragon mirror with the royal family is hard to be excluded. The type and quantity of bronze double dragon mirrors discovered to have existed during the Goryeo dynasty is great, and the production and the distribution of bronze mirrors with double dragons seem to have been more active compared to other bronze mirrors, as bronze mirrors with double dragons produced during Goryeo and bronze mirrors originating in China were mixed. Therefore, in this article, the characteristics of diverse bronze mirrors from the 10th century to the 14th century in China were examined. It seems that the master craftsmen who produced bronze mirrors with double dragons during the Goryeo dynasty were influenced by Chinese composition patterns when making the mirrors. Because there were many cases where a bronze mirror's country of origin could not easily be determined, in order to identify the differences between bronze double dragon mirrors produced during the Goryeo dynasty and bronze mirrors produced in China, meticulous analysis was required. Thus, to ascertain that Goryeo mirrors were not imitations of bronze mirrors with double dragons originating in China but produced independently, the mirrors were examined using the bronze double dragon mirror type classification system existing in our country. Bronze mirrors with double dragons are classified into three types: Type I, which has the style of the Yao dynasty, includes the greatest proportion; however, despite there being only a small quantity for comparison, Types II and III were selected for the analysis of the bronze mirrors with double dragons made in Goryeo because they have unique composition patterns. As mentioned above, distinguishing bronze mirrors made during Goryeo from bronze mirrors made in China is challenging because Goryeo bronze mirrors were made under the influence of China. Among them, since the manufacturing place of the bronze mirrors with double dragons found at the nine-story stone pagoda in Woljeongsa Temple in Pyeongchang is questionable and the composition pattern of the bronze mirror is hard to find on bronze mirrors with double dragons made in China, the manufacturing place of those bronze mirrors were examined. These bronze mirrors with double dragons were considered as bronze mirrors with double dragons made during the Goryeo dynasty adopting the Yao dynasty style composition pattern as aspects of the composition pattern belonged to Type I, and the detailed combination of patterns is hard to find in mirrors produced in China.