• Title/Summary/Keyword: implementation feasibility

Search Result 587, Processing Time 0.026 seconds

Papers : Feasibility Study on Attitude Control of Spacecraft Using Pulsed Plasma Thrusters (논문 : 플라즈마 펄스 추력기를 이용한 인공위성 자세제어 기법 연구)

  • Ji, Hyo-Seon;Lee, Ho-Il;Lee, Hun-Gu;Tak, Min-Je
    • Journal of the Korean Society for Aeronautical & Space Sciences
    • /
    • v.30 no.3
    • /
    • pp.46-56
    • /
    • 2002
  • In this paper, the feasibility of the attitude control of a spacecraft using pulsed plasma thrusters(PPTs) is studied. The PPT consumes less propellant mass requied for the orbit management or attitude control owing to its high specific impulse characteristics, compared with traditional gas propulsion system. The PPT is expected to be highly adequete for the missions requiring long-duration operations because it has relatively long operation time and easy implementation. The feasibility of the PPT for attitude control of a small satellite system is addressed through realistic missions. The classical PD controller and a fuzzy logic controller are tested, and fuel saving fuzzy logic controller is then proposed for more flexible mission performance.

Model of Water, Energy and Waste Management for Development of Eco-Innovation Park ; A Case Study of Center for Research of Science and Technology "PUSPIPTEK," South Tangerang City, Indonesia

  • Setiawati, Sri;Alikodra, Hadi;Pramudya, Bambang;Dharmawan, Arya Hadi
    • World Technopolis Review
    • /
    • v.3 no.2
    • /
    • pp.89-96
    • /
    • 2014
  • Center for Research of Science and Technology ("PUSPIPTEK") has 460 hectares land area, still maintained as a green area with more than 30% green space. There are 47 centers for research and testing technology, technology-based industries, and as well as public supporting facilities in PUSPIPTEK area. Based on the concepts developed to make this area as an ecological region, PUSPIPTEK can be seen as a model of eco-innovation. The purpose of this research is to develop a model of water, energy and waste management with eco-innovation concept. As a new approach in addressing environmental degradation and maintaining the sustainability of ecosystem, studies related to eco-innovation policy that combines the management of water, energy and waste in the region has not been done. In order to achieve the objectives of the research, a series of techniques for collecting data on PUSPIPTEK existing conditions will be carried out, which includes utilities data (water, electricity, sewage) and master plan of this area. The savings over the implementation of the concept of eco-innovation in water, energy, and waste management were calculated and analyzed using quatitative methods. The amount of cost savings and feasibility were then calculated. Eco innovation in water management among other innovations include the provision of alternative sources of water, overflow of rain water and water environments utilization, and use of gravity to replace the pumping function. Eco-innovation in energy management innovations include the use of LED and solar cell for air conditioning. Eco-innovation in waste management includes methods of composting for organic waste management. The research results: (1) The savings that can be achieved with the implementation of eco innovation in the water management is Rp. 3,032,640 daily, or Rp.1,106,913,600 annually; (2) The savings derived from the implementation of eco innovation through replacement of central AC to AC LiBr Solar Powered will be saved Rp.1,933,992,990 annually and the use of LED lights in the Public street lighting PUSPIPTEK saved Rp.163,454,433 annually; (3) Application of eco innovation in waste management will be able to raise awareness of the environment by sorting organic, inorganic and plastic waste. Composting and plastic waste obtained from the sale revenue of Rp. 44,016,000 per year; (4) Overall, implementation of the eco-innovation system in PUSPIPTEK area can saves Rp. 3,248,377,023 per year, compared to the existing system; and (5)The savings are obtained with implementation of eco-innovation is considered as income. Analysis of the feasibility of the implementation of eco-innovation in water, energy, and waste management in PUSPIPTEK give NPV at a 15% discount factor in Rp. 3,895,228,761; 23.20% of IRR and 4.48 years of PBP. Thus the model of eco-innovation in the area PUSPIPTEK is feasible to implement.

Development of Hardware Simulator for PMSG Wind Power System (영구자석동기발전기 풍력시스템의 하드웨어 시뮬레이터 개발)

  • Lee, Doo-Young;Yun, Dong-Jin;Jeong, Jong-Kyou;Yang, Seung-Chul;Han, Byung-Moon;Song, Seung-Ho
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.57 no.6
    • /
    • pp.951-958
    • /
    • 2008
  • This paper describes development of hardware simulator for the PMSG wind power system, which was designed considering wind characteristic, blade characteristic and blade inertia compensation. The simulator consists of three major parts, such as wind turbine model using induction motor, PMSG generator, converter-inverter set. and control system. The turbine simulator generates torque and speed signals for a specific wind turbine with respect to given wind speed. This torque and speed signals are scaled down to fit the input of 2kW PMSG. The PMSG-side converter operates to track the maximum power point, and the grid-side inverter controls the active and reactive power supplied to the grid. The operational feasibility was verified by computer simulations with PSCAD/EMTDC, and the implementation feasibility was confirmed through experimental works with a hardware set-up.

Development of Hardware Simulator for PMSG Wind Power System (영구자석동기발전기 풍력시스템의 하드웨어 시뮬레이터 개발)

  • Yun, Dong-Jin;Jeong, Jong-Kyou;Yang, Seung-Chul;Kwon, Gi-Hyun;Han, Byung-Moon
    • Proceedings of the KIEE Conference
    • /
    • 2008.04c
    • /
    • pp.215-217
    • /
    • 2008
  • This paper describes development of hardware simulator for the PMSG wind power system, which was designed considering wind characteristic, blade characteristic and blade inertia compensation. The simulator generates torque and speed signals for a specific wind turbine with respect to given wind speed. This torque and speed signals are scaled down to fit the input of 2kW PMSG. The PMSG-side converter operates to track the maximum power point, and the grid-side inverter controls the active and reactive power supplied to the grid. The operational feasibility was verified by computer simulations with PSCAD/EMTDC, and the implementation feasibility was confirmed through experimental works with a hardware set-up.

  • PDF

Study on 18-step Back-to-Back Voltage Source Converter for HVDC Application (직류송전 적용을 위한 18-스텝 Back-to-Back 전압원 컨버터에 관한 연구)

  • Lee, Hye-Yeon;Lee, Ji-Heon;Han, Byung-Moon;Li, Yulong;Choi, Nam-Sup
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.58 no.4
    • /
    • pp.748-755
    • /
    • 2009
  • This paper proposes a 18-step back-to-back voltage source converter using four sets of 3-Level converter module with auxiliary circuit to increase the number of steps. The proposed back-to-back voltage source converter has an independent control capability of active power and reactive power at the interconnected ac system. The operational feasibility of proposed system was verified through computer simulations with PSCAD/EMTDC software. The feasibility of hardware implementation was verified through experimental results with a scaled hardware model. The proposed back-to-back converter can be widely applied for interconnecting the renewable energy source to the power grid.

Development of PMSG Wind Power System Model using Wind Turbine Simulator and Matrix Converter (풍력터빈시뮬레이터와 매트릭스 컨버터를 적용한 PMSG 풍력발전 시스템 모델 개발)

  • Yun, Dong-Jin;Han, Byung-Moon;Cha, Han-Ju;Li, Yu-Long;Choi, Nam-Sup
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.58 no.6
    • /
    • pp.1130-1137
    • /
    • 2009
  • This paper describes a scaled model development of PMSG wind power system using wind turbine simulator and matrix converter. The wind turbine simulator, which consists of an induction motor with vector drive, calculates the output torque of a specific wind turbine using simulation software and sends the torque signal to the vector drive after scaling down the calculated value. The operational feasibility of interconnected PMSG system with matrix converter was verified by computer simulations with PSCAD/EMTDC software. The feasibility of hardware implementation was conformed by experimental works with a laboratory scaled-model of wind power system. The simulation and experimental results confirm that matrix converter can be effectively applied for the PMSG wind power system.

A Study on Implementation of rapid service in urban railway (In Seoul Metropolitan area) (도시철도의 급행운전 시행방안 연구)

  • Fujita Takayoshi;Roh Hyuk-Jae;Kim Gyeng-Chul
    • Proceedings of the KSR Conference
    • /
    • 2004.06a
    • /
    • pp.501-506
    • /
    • 2004
  • This paper aims to suggest the feasibility of rapid operation scheme generated in preceding study, 'A study on development of operation planning for rapid service in urban railway(An introduction)' through application it to present subway lines in Seoul Metropolitan area. In case of line 3, without the Passing Track 'Turning train outstrip mode' is the best policy. In case of line 4, with the Passing Trank 'Passing track mode' may be the best way to realize the this scheme. Also, there is feasibility in the line 1, line 5, line 6, line 7 but there is no possibility it is applied to line 2 and line 8. In conclusion, this paper is intend to suggest the possibility of rapid operation in urban railway by presenting real operation scheme, time tables and amount of power usage and the number of composing trains and variety of demand,

  • PDF

18-step Back-to-Back Voltage Source Converter with Pulse Interleaving Circuit for HVDC Application

  • Lee, Hye-Yeon;Jeong, Jong-Kyou;Lee, Ji-Heon;Han, Byung-Moon;Choi, Nam-Sup;Cha, Han-Ju
    • Journal of Electrical Engineering and Technology
    • /
    • v.5 no.3
    • /
    • pp.435-442
    • /
    • 2010
  • This paper proposes an 18-step back-to-back (BTB) voltage source converter using four sets of 3-Level converter modules with auxiliary circuits to increase the number of steps. The proposed BTB voltage source converter has the independent control capability of active power and reactive power at the interconnected ac system. The operational feasibility of the proposed BTB converter was verified through many simulations with PSCAD/EMTDC software. The feasibility of hardware implementation was verified through experimental results with a scaled hardware prototype. The proposed BTB converter could be widely applied for interconnecting the renewable energy source to the power grid.

Assessing the Feasibility of an Accident Management Strategy Using Dynamic Reliability Methods

  • Moosung Jae;Kim, Jae-Hwan
    • Nuclear Engineering and Technology
    • /
    • v.29 no.1
    • /
    • pp.1-6
    • /
    • 1997
  • This paper presents a new dynamic approach for assessing feasibility associated with the implementation of accident management strategies by the operators. This approach includes the combined use of both the concept of reliability physics and a dynamic event tree generation scheme. The reliability physics is based on the concept of a comparison between two competing variables, i.e., the requirement and the achievement parameter, while the dynamic event tree generation scheme on the continuous generation of the possible event sequences at every branch point up to the desired solution. This approach is applied to a cavity flooding strategy in a reference plant, which is to supply water into the reactor cavity using emergency fire systems in the station blackout sequence. The MAAP code and Latin Hypercube sampling technique are used to determine the uncertainty of the requirement parameter. It has been demonstrated that this combined methodology may contribute to assessing the success likelihood of the operator actions required during accidents and therefore to developing the accident management procedures.

  • PDF

Development of hardware simulator for PMSG wind power system composed of anemometer and motor-generator set (풍속계와 Motor-Generator를 이용한 영구자석동기발전기 풍력발전시스템 하드웨어 시뮬레이터 개발)

  • Jeong, Jong-Kyou;Han, Byung-Moon
    • Proceedings of the KIPE Conference
    • /
    • 2010.11a
    • /
    • pp.248-249
    • /
    • 2010
  • This paper describes development of hardware simulator for the PMSG(Permanent Magnet Synchronous Generator) wind power system, which was designed using real wind data. The simulator consists of a realistic wind turbine model using anemometer, vector drive, induction motor. The turbine simulator generates torque and speed signals for a specific wind turbine with respect to given wind speed. This torque and speed signals are scaled down to fit the input of 3kW PMSG. The PMSG-side converter operates to track the maximum power point and the grid-side inverter controls the active and reactive power supplied to the grid. The operational feasibility was first verified by computer simulations with PSCAD/EMTDC. The feasibility of real system implementation was confirmed through experimental works with a hardware set-up.

  • PDF