Environmental Impact Assessment (EIA) is composed of various procedures, such as screening, scoping, inventory survey, prediction, assessment, alternative assessment, mitigation measures, and post management. Environmental monitoring data for air quality or water quality, etc. is applied in the EIA process, especially in prediction and post management. As an effective tool of environmental monitoring, the remote sensing method, introduced recently, was used in collecting nationwide data concerning ecosystem and land use. This article explains the current monitoring status in Korea. Monitoring factors include air quality, water quality, soil, ocean, odor, noise, and ecosystems. This report explains the organization of the environmental monitoring system managed by the Ministry of Environment in Korea. Furthermore, it shows the environmental criteria and environmental policies applied to EIA in Korea.
Proceedings of the Korean Society For Composite Materials Conference
/
2003.04a
/
pp.125-128
/
2003
Low-velocity impact damage is a major concern in the design of structures made of composite materials, because impact damage is hidden inside and cannot be detected by visual inspection. The piezoelectric thin film sensor can be used to detect variations in structural and material properties for structural health monitoring. In this paper, the PVDF and PZT sensors were used for monitoring impact damage initiation in Gr/Ep composite panel to illustrate this potential benefit. A series of impact test at various impact energy by changing impact mass and height is performed on the instrumented drop weight impact tester. The wavelet transform(WT) is used to decompose the piezoelectric sensor signals in this study. Test results show that the particular waveform of sensor signals implying the damage initiation and development are detected above the damage initiation impact energy. And it is found that both PZT and PVDF sensors can be used to detect the impact damage.
Proceedings of the Korean Society For Composite Materials Conference
/
2001.10a
/
pp.174-178
/
2001
The piezoelectric thin film sensor can be used to interpret variations in structural and material properties, e.g. for structural integrity monitoring and assessment. To illustrate one of this potential benefit, PVDF film sensors are used for monitoring impact damage initiation in Gr/Ep composite panel. Both PVDF film sensors and strain gages are surface mounted to the Gr/Ep specimens. A series of impact test at various impact energy by changing impact mass and height is performed on the instrumented drop weight impact tester. The sensor responses are carefully examined to predict the onset of impact damage such as matrix cracking, delamination, and fiber breakage, etc. Test results show that the particular waveforms of sensor signals implying the damage initiation and development are detected above the damage initiation impact energy. As expected, the PVDF film sensor is found to be more sensitive to impact damage initiation event than the strain gage.
Environmental Impact Assessment is composed of screening, scoping, inventory survey, prediction, assessment, alternative assessment, mitigation measure, and post management. Environmental monitoring data is applied to EIA process such as prediction and post management. It must he collected and managed systematically for effective applying in EIA process. This article explains factors such as air quality, water quality, soil, ocean, odor, noise & vibration, ecosystem, etc. and organizations of environmental monitoring managed by Ministry of Environment.
Monitoring of impact loads is a very important technique in the field of structural health monitoring (SHM). However, in most cases it is not possible to measure impact events directly, so they need to be reconstructed. Impact load reconstruction refers to the problem of estimating an input to a dynamic system when the system output and the impulse response function are usually known. Generally this leads to a so called ill-posed inverse problem. It is reasonable to use prior knowledge of the force in order to develop more suitable reconstruction strategies and to increase accuracy. An impact event is characterized by a short time duration and a spatial concentration. Moreover the force time history of an impact has a specific shape, which also can be taken into account. In this contribution these properties of the external force are employed to create a sample-force-dictionary and thus to transform the ill-posed problem into a sparse recovery task. The sparse solution is acquired by solving a minimization problem known as basis pursuit denoising (BPDN). The reconstruction approach shown here is capable to estimate simultaneously the magnitude of the impact and the impact location, with a minimum number of accelerometers. The possibility of reconstructing the impact based on a noisy output signal is first demonstrated with simulated measurements of a simple beam structure. Then an experimental investigation of a real beam is performed.
Environmental Impact Assessment(EIA) was first formally established in the Korea in 1981. Subsequently there has been a rapid growth in EIA activity, and over one hundred fifty environmental impact statements are now published in Korea each year. Although EIA now has almost 20 years of history in the Korea, elsewhere the development of roles and practice is more recent. Development is moving apace in many countries, including the Japan and the EU Member States. Such progress has not been without its problems, and a number of the current issues in EIA-scope of the assessment, the relative roles, the quality of assessment and monitoring and auditing after decision, and so on- are highlighted. So the purpose of this article is to reform the EIA roles and process, in extending the scope of activity, and assessing effectiveness. This article suggested improving the effectiveness of project assessment, widening the scope: stretegic environmental assessment, and extending EIA to project design process, environmental monitoring and feedback system.
Environmental monitoring system has been adopted and supplemented as inspection measures for the quantitative and qualitative changes of environmental impact assessment (EIA). Meanwhile it has been continuously pointed out that there is insufficient connection between environmental monitoring system and EIA. Often the agreed environmental impact assessment has not been fulfilled due to the argument of the cost, timing and situations of construction sites. Thus the purpose of this study is in search of the rationalized environmental monitoring system in order to harmonize the development and environmental conservation through the improvement of unreasonable aspects of the current EIA execution process. As to comply with the purpose, this research was carried out with three different but complimentary sources: environmental laws and regulations, foreign case studies of Japan, U.S.A. and Canada, and interviews with 73 experts. Finally, improved environmental monitoring system has been introduced reflecting the present process of EIA.
Simultaneous monitoring in many locations is necessary to evaluate the air quality and analyze future trend of a city, For this purpose, it is essential to install air pollution monitoring network. The first automatic air pollution monitoring network was introduced Seoul in 1973. As of 1995, 20 monitoring stations are now in operation. Concerning the management of the air pollution monitoring network, there was some argument among the relavant scholars, non-governmental organization(NGO) and the government organization. So far, there was no extensive evaluation and analysis about the network. The purpose of this study was to evaluate the representativeness of air quality monitoring network through actual measurement of the concentration of the air pollutant. The concentration of NOx was extensively measured widely in Seoul area three times using the TEA simple measuring technique. Even the judgement level for the area representativeness was lowered to 80%, Ssangmun-dong monitoring station tend to overestimate the pollutant concentration of the covered area. While, Sinlimdong monitoring station tend to underestimate the pollutant concentration of the covered area.
Journal of Fisheries and Marine Sciences Education
/
v.28
no.4
/
pp.957-970
/
2016
This study diagnosed the status of marine environmental impact assessment(MEIA) for project near the habitat of marine protected seagrass species such as Zostera caespitosa, Zostera asiatica, Phyllospadix iwatensis. For the preparation of a marine environmental impact statement, different monitoring parameters are used without any specific guideline for the assessment of current status. And also, both tools and techniques for MEIA are needed to improve for implementing. The monitoring plans and parameters are not considered well with the accuracy of the environmental predictions and effectiveness of any applicable mitigation measures. This study suggested the reasonable standard of the MEIA for the conservation of the marine protected seagrass species which have the habitat located near affected area. The inshore seagrasses need to be monitored including shoot count based on the "No Net Loss of Seagrass" as part of the monitoring parameters to assess the status of marine environment of environmental impact statement. In a process of effect prediction, we suggested a concentration of 10 mg/L suspended solids which added by the new developmental project near seagrasses habitat, referring to study of overseas case. But a further study for an appropriate standard is necessary effectively. In a mitigating process, priority needs to be considered in order of avoidance, minimization, reduction, compensation. In a post-monitoring process, it is necessary to monitor the seagrass species abundance to identify the variation of b/a (before and after) project. And in a case of implementing transplantation, survival rate need to be included to determine a success of project.
Proceedings of the Korean Society for Noise and Vibration Engineering Conference
/
2008.11a
/
pp.687-692
/
2008
In a nuclear power plant, loose part monitoring and its diagnostic technique is one of the major issues for ensuring the structural integrity of the reactor system. Typically, accelerometers are mounted on the surface of a reactor vessel to localize impact location caused by the impact of metallic substances on the reactor system. However, in some cases, the number of the accelerometers is not enough to estimate the impact location precisely. In such a case, one of alternative plan is to utilize another type sensors that can measure the vibration of the reactor structure even though the measuring frequency ranges are different from each others. The AE sensors installed on the reactor structure can be utilized as additional sensors for loose part monitoring. In this paper, we proposed a new method to estimate impact location by using both accelerometer signal and AE signal, simultaneously. The feasibility of the proposed method is verified by an experiment. The experimental results demonstrate that we can enhance the reliability and precision of the loose part monitoring.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.