• 제목/요약/키워드: hydro power turbine-generator

검색결과 40건 처리시간 0.034초

양어장 방류수를 이용한 해양소수력발전소 구축에 관한 연구 (Construction of Marine Small Hydro Power Plant using Discharge Water of Fish Farm)

  • 황영철;최영도
    • 한국유체기계학회 논문집
    • /
    • 제16권5호
    • /
    • pp.11-17
    • /
    • 2013
  • This study is aimed to construct a marine small hydro power plant using discharge water of fish farm in Jeju Haengwon-ri. The difference of design methods between marine small hydro power plant and land small hydro power plant is to consider the tides. Moreover, ground condition should be examined because gushout sea water comes out from the ground at high tide in Jeju as the ground of Jeju beach consists of basalt stone. From the field test of the turbine generator after construction of the power plant, output power and efficiency of the turbine generator shows good conformance to the required conditions.

수차발전기 상태진단시스템을 이용한 예지보전체계 (Predictive Maintenance System using Condition Monitoring System of Hydro-turbine Generator)

  • 김응태;고성호;김현;정용채;최성필
    • 한국소음진동공학회:학술대회논문집
    • /
    • 한국소음진동공학회 2007년도 춘계학술대회논문집
    • /
    • pp.453-456
    • /
    • 2007
  • The purpose of this study is to explain the importance of Vibration Monitoring Device by introducing an example of Predictive Maintenance System using Condition Monitoring System of Hydro-turbine generator. Confirming vibration of generation equipment is commissioning procedure during equipment completion for checking guaranteed items. Data from Generator output range are used to determine output band to continue the performance of equipment. The Vibration Monitoring System is not absolute method of maintenance, but if it is used well with expert, it will be visible, data-analyzed, scientific maintenance more than others. And also, Condition Monitoring System is very important for remote controlled small hydro-power plant although most of it is installed in Large hydro-power plant.

  • PDF

수차발전기 상태진단시스템을 이용한 예지보전체계 (Predictive Maintenance System using Condition Monitoring System of Hydro-turbine Generator)

  • 김응태;고성호;김현;정용채;최성필
    • 유체기계공업학회:학술대회논문집
    • /
    • 유체기계공업학회 2006년 제4회 한국유체공학학술대회 논문집
    • /
    • pp.57-60
    • /
    • 2006
  • The purpose of this study is to explain the importance of Vibration Monitoring Device by introducing an example of Predictive Maintenance System using Condition Monitoring System of Hydro-turbine generator. Confirming vibration of generation equipment is commissioning procedure during equipment completion for checking guaranteed items. Data from Generator output range are used to determine output band to continue the performance of equipment. The Vibration Monitoring System is not absolute method of maintenance, but if it is used well with expert, it will be visible, data-analyzed, scientific maintenance more than others. And also, Condition Monitoring System is very important for remote controlled small hydro-power plant although most of it is installed in Large hydro-power plant.

  • PDF

수차발전기 상태진단시스템을 이용한 예지보전체계 사례 (Report on Predictive Maintenance System using Condition Monitoring System of Hydro-turbine Generator)

  • 고성호;정용채;최성필;곽영균;한승열
    • 한국유체기계학회 논문집
    • /
    • 제13권1호
    • /
    • pp.29-34
    • /
    • 2010
  • The purpose of this study is to explain the importance of Vibration Monitoring Device by introducing an example of Predictive Maintenance System using Condition Monitoring System of Hydro-turbine generator. Confirming vibration of generation equipment is commissioning procedure during equipment completion for checking guaranteed items. Data from Generator output range are used to determine output band to continue the performance of equipment. The Vibration Monitoring System is not absolute method of maintenance, but if it is used well with expert, it will be visible, data-analyzed, scientific maintenance more than others. And also, Condition Monitoring System is very important for remote controlled small hydro-power plant although most of it is installed in Large hydro-power plant.

소수력 수차발전기의 선정 주안점 (The Essential Point for the Selection of Small Hydropower Turbine & Generator)

  • 이은웅;이경배
    • 한국신재생에너지학회:학술대회논문집
    • /
    • 한국신재생에너지학회 2005년도 춘계학술대회
    • /
    • pp.452-455
    • /
    • 2005
  • We have studied the prearranged plan and the economy of a candidate site for the development of small hydro power. And also we have confirmed its economy by suggesting the technology of the unmanned operation and the selection of the water turbine generator which has a great efficiency. working rate and suitability to the topographical characteristics of various development sites, for example, irrigation reservoirs, water works pipes, sewage systems and cool ing water of a steam power stat ion. Besides we give more examples of the select ion of Francis, propeller turbine and induction generator which can achieve a maximum of power production at a minimum construction cost. With a water turbine which runs at the low head we are able to suggest many programs to boost a development of small hydro power more economically.

  • PDF

블레이드 형상 변화에 따른 마이크로 튜블러 수차의 CFD 성능해석 (CFD Performance analysis of Micro Tubular-type hydro turbine by blade shape)

  • 박지훈;황영철;모장오;김유택;이영호
    • 한국신재생에너지학회:학술대회논문집
    • /
    • 한국신재생에너지학회 2011년도 춘계학술대회 초록집
    • /
    • pp.206.1-206.1
    • /
    • 2011
  • Recently, various developments in the area of small hydropower have being made and small hydro turbines are suitable for domestic use because it is a clean and renewable energy source. A small hydropower generator produces power by using the different water pressure levels in pipe lines and energy which was initially wasted by use of a reducing valve at the end of the pipeline is instead collected by a tubular-type hydro turbine in the generator. In this study, in order to acquire the performance of tubular-type hydro turbine applied, the output power, head, efficiency characteristics due to the different guide vane and runner vane angle are examined in detail. Moreover, influences of pressure and velocity distributions with the variation of guide vane and runner vane angle on turbine performance are investigated by using a commercial CFD code.

  • PDF

수력 발전기 제어시스템의 계자상실 모델링과 시뮬레이션 (Modeling and Simulation of Loss of Excitation of Hydro Generator Control System)

  • 박철원
    • 전기학회논문지P
    • /
    • 제63권2호
    • /
    • pp.74-80
    • /
    • 2014
  • Generator protection device has to detects an internal fault conditions in generator and abnormal operating conditions must be due to the hazards. Loss of excitation may cause generator itself failure as well as serious operating problem in power system, and then requires an appropriate response of generator protection device. Details modeling of generator control system and analysis of transient states in generator are important for optimal operation in power plants. In addition, the fault simulation data are also used for testing the characteristics of IED. In this paper, the hydro generator control system using PSCAD/EMTDC, visual simulation for power systems, was modeled. The generator control system which is composed of generator, turbine, exciter, governor was implemented. The parameters of generator control system model were obtained from field power plant. Loss of excitation simulations were performed while varying the fixed load. Several signals analysis were also performed so as to analyze transients phenomena.

수력 원통형 터빈 가이드 베어링의 저부하/저편심 성능향상 설계 - 패드 선단 테이퍼의 도입 (Low-Load/Low-Eccentricity Performance Improvement Designs for Hydro Power Application of Cylindrical Turbine Guide Bearings - Introduction of Pad Leading-Edge Tapers)

  • 이안성;장선용
    • Tribology and Lubricants
    • /
    • 제33권2호
    • /
    • pp.65-70
    • /
    • 2017
  • In vertical hydro/hydraulic power turbine-generator applications, traditionally, cylindrical turbine guide bearings (TGBs) are widely used to provide turbine runner shafts with smooth rotation guides and supports. All existing cylindrical TGBs with simple plain pads have drawbacks such as having no pressure generation and film stiffness at the no-load condition and in addition, at the low-load/low-eccentricity condition, having very low film stiffness values and lacking design credibility in the stiffness values themselves. In this paper, in order to fundamentally improve the low-load/low-eccentricity performance of conventional cylindrical TGBs and thus enhance their design-application availability and usefulness, we propose to introduce a rotation-directional leading-edge taper to each partitioned pad, i.e., a pad leading-edge taper. We perform a design analysis of lubrication performance on $4-Pad{\times}4-Row$ cylindrical TGBs to verify an engineering/technical usefulness of the proposed pad leading-edge taper. Analysis results show that by introducing the leading-edge taper to each pad of the cylindrical TGB one can expect a constant high average direct stiffness with a high degree of design credibility, regardless of load value, even at the low-load/low-eccentricity condition and also control the average direct stiffness value by exploring the taper height as a design parameter. Therefore, we conclude that the proposed pad leading-edge tapers are greatly effective in more accurately predicting and controlling rotordynamic characteristics of vertical hydro-power turbine-generator rotor-bearing systems to which cylindrical TGBs are applied.

해양소수력발전소 튜블러 수차 성능평가를 위한 현장시험 (Field Test for Performance Evaluation of a Tubular Turbine in Marine Small Hydro Power Plant)

  • 황영호;이영호;최영도
    • Journal of Advanced Marine Engineering and Technology
    • /
    • 제35권8호
    • /
    • pp.1070-1077
    • /
    • 2011
  • 본 연구는 해양소수력발전소에서의 튜블러 수차의 성능평가를 위한 현장시험 및 그 결과에 대한 내용을 포함하고 있다. 현장시험용 수차의 발전기 최소출력은 측정된 유효낙차, 출력 그리고 효율을 이용하여 검토되었다. 정격 및 최대 출력시험은 수차 설치현장의 조수간만의 차에 의한 영으로 인하여 동일한 실험조건을 확보할 수 없었기 때문에 모델시험에 의한 성능 데이터를 이용하여 환산된 값을 사용하였다. 현장시험에 의한 수차의 성능은 최소출력, 정격출력, 최대출력 운전점에서 보증출력 및 보증효율을 만족시키는 결과를 나타냄을 확인하였다.

A Voltage and Frequency Controller for Stand Alone Pico Hydro Generation

  • Kasal, Gaurav Kumar;Singh, Bhim
    • Journal of Power Electronics
    • /
    • 제9권2호
    • /
    • pp.267-274
    • /
    • 2009
  • This paper deals with a voltage and frequency (VF) controller for an isolated power generation system based on an asynchronous generator (AG) driven by a pico hydro turbine. The proposed controller is a combination of a static compensator (STATCOM) and an electronic load controller (ELC) for decoupled control of the reactive and active powers of the AG system to control the voltage and frequency respectively. The proposed generating system along with its VF controller is modeled in MATLAB using SIMULINK and PSB (Power System Block Sets) toolboxes. The performance of the controller is verified for the proposed system and feeding various types of consumer load such as linear/non-linear, balanced/unbalanced and dynamic loads.