• Title/Summary/Keyword: hydro power

Search Result 995, Processing Time 0.07 seconds

An Application Case Study of Improving Performance of Small Hydro-power (소수력 성능향상 사례연구)

  • Kim, Sang-Gyun;Park, Ji-Kun;Lee, Yeon-Ju
    • 한국신재생에너지학회:학술대회논문집
    • /
    • 2011.11a
    • /
    • pp.165.1-165.1
    • /
    • 2011
  • In this paper, it is intended to study about deferences of design and operation properties between large and small hydro-power house's turbine which type is reaction. In generally, turbine of large hydro-power has a more safe and effective energy output mechanisms than small hydro-power's because the turbine of small hydro-power is more sensitive to hydraulic losses. But, it is more effective for the all energy market to improve the capability and efficiency of small hydro-power in the present status of increasing construction of small hydro-power than large hydro-power. Therefore, we intend to investigate and introduce the way to enhance the efficiencies of reaction turbine adopted to small hydro-power.

  • PDF

Conceptual Design for HIC Transport Package

  • Chung, Sung-Hwan;Kim, Duck-Hoi;Baek, Chang-Yeol;Kim, Sang-Bok;Choi, Byung-Il;Yang, Kye-Hyung;Lee, Heung-Young
    • Proceedings of the Korean Nuclear Society Conference
    • /
    • 2005.05a
    • /
    • pp.159-160
    • /
    • 2005
  • PDF

Hydro-electric Power Generation System of Multi-purpose Dams in Koresa - A Framework for Investment Justification and Economic Operation - (한국의 다목적댐 수력발전 체계 - 투자의 정당화와 경제적 운영 -)

  • 이승규;박용삼
    • Korean Management Science Review
    • /
    • v.12 no.1
    • /
    • pp.157-173
    • /
    • 1995
  • Hydro-electric power generation from multi-purpose dams has been playing important roles in the electric power supply network in Korea. Although the total share of hydro power in national electricity supply now becomes very small, the peak-shaving and frequency control capability of hydro power helps the power company enormously in maintaining the quality of power. But since the company that builds and operates the multi-purpose dams in Korea has to sell all the electricity produced to the monopolistic utility, there have been various problems in justifying the investment, designing pricing mechanism, and controlling operations of the power plants. In addition, economic evaluation of the hydro power has been distorted by a variety of reasons and hence it has been very difficult to encourage effective development and utilization of national water resources. To make the problem worse, both parties are public companies with X-inefficiency problems. Thus, changing environment requires to reengineer the system that governs hydro power generation. We address the problems of Korean hydro-electric power generation system in four areas: the investment justification process, the operations decison right of the hydro power plants, the pricing of the purchased-power, and the negotiation of contract revision. Then we propose improvement directions of new hydro-electric power system in view of static and dynamic efficiency, X-inefficiency and equity.

  • PDF