• Title/Summary/Keyword: high-rise compound building

Search Result 3, Processing Time 0.022 seconds

The Program of progress control and quality control for the high-rise compound building (초고층 주상복합건물의 수장공사 공정관리 및 품질관리 방안)

  • Jung, Eul-Kyu;Lim, Chil-Soon
    • Journal of the Korea Institute of Building Construction
    • /
    • v.3 no.4
    • /
    • pp.111-117
    • /
    • 2003
  • Recently SAMWOO EMC received order and built interior walls which was used the day process in several high-rise compound buildings. On the way to build, this process was brought about several matter according to the progress and qualify control. So, this study is the improving way of the dry process from experiences on those constructions

A Study on the improvement of Strength delay according to Low Temperature of Cold Weather Concrete (한중콘크리트의 저온에 의한 강도지연 개선연구)

  • Lee, Sang-Soo
    • Journal of the Korean Recycled Construction Resources Institute
    • /
    • v.7 no.1
    • /
    • pp.51-59
    • /
    • 2012
  • The cold weather concrete poured in the winter season can cause the problem of the Due to recent high-rise building is made. In this research, the nominal mix of the early strength in concrete tried to be set through the mixing proportion experiment for each empirical variable and each component strength properties for the early strength improvement tries to be examined. In the cold weather concrete experiment, the cement and high early strength (type3) cement improving in OPC than OPC was excellent. The polycarboxylic acid based compound was exposed to be excellent in the intensity revelation properties. Because the using of the fly ash was disadvantageous it was excluded from this experiment. It showed the optimum temperature for the intensity revelation up over $12^{\circ}C$.

  • PDF