• Title/Summary/Keyword: groundwater dam

Search Result 104, Processing Time 0.036 seconds

The Correlation between Groundwater Level and GOI with Snowmelt Effect in Ssangchun Watershed (쌍천유역의 지하수위와 융설 효과를 고려한 GOI의 상괸관계)

  • Yang, Jeong-Seok;Lim, Chang-Hwa;Park, Jae-Hyeon;Park, Chang-Kun
    • Journal of Korea Water Resources Association
    • /
    • v.39 no.2 s.163
    • /
    • pp.121-126
    • /
    • 2006
  • Snowmelt effect is identified from the analysis of the relationship between precipitation and groundwater level(GWL) data and Severe drawdown of GWL is observed in drought. Groundwater dam Operation Index (GOI), which is developed for the optimal operation of groundwater dam, is calculated by taking common logarithm of the moving average(MA) of precipitation data for a certain period. The period can vary from watershed to watershed because the period is decided by picking the maximum correlation coefficient between GWL and GOI of several MAs of precipitation. For Ssangchun watershed, the correlation was the strongest when we apply 70 day MA for GOI calculation. Snowmelt effect is considered by applying the temperature change by elevation($0.5^{\circ}C$ decrease per 100m) and examining the areal distribution of the watershed by elevation. Snow event is assumed when the daily average temperature is below $0^{\circ}C$ and snowmelt is assumed when the temperature is above zero degree Celsius. Total snowmelt is assumed for the day. When the snow event is occurred the precipitation data is separated into two components, snow and rainfall. The areal distribution by elevation is used for the calculation in the separation. The correlation between GWL and GOI is higher when we consider snowmelt effect than we neglected it.

Preliminary Analysis on Improvement of Water Supply Capacity of Sand Dam (샌드댐 설치에 따른 물공급 개선 효과 예비 분석)

  • Chung, Il-Moon;Lee, Jeongwoo
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.41 no.1
    • /
    • pp.29-37
    • /
    • 2021
  • It is important to introduce a local adaptive water supply system for upper mountainous regions, which provide a margin of water supply. This can be done through the process of securing a water source, planning for optimal use, and combining it with a water source that can be linked. In particular, in a mountainous region located at the uppermost part of the watershed, an approach should be found to utilize the groundwater discharge supplied through valley water and lateral discharge. This study sought to improve the water supply system using sand dams in drought-prone areas in Chuncheon, in Gangwon Province. Our approach involved virtually installing a sand storage tank under the existing water source to perform modeling in consideration of the current water intake and calculating the amount of water that can be taken from the sand dam. When the sand dam was applied at a size four times larger than the existing water source, it was found that the groundwater drainage increased significantly with changes in water surface slope and hydraulic conductivity.

Assessment of water resources by the construction of subsurface dam (지하댐 설치에 의한 수자원 개발량 평가)

  • Kim, Sang Jun
    • Journal of Korea Water Resources Association
    • /
    • v.50 no.11
    • /
    • pp.795-802
    • /
    • 2017
  • This study shows the assessment methodology for the water resources of subsurface dams. The study area is SSangcheon subsurface dam. It is at the estuary of SSangcheon watershed forming the unconfined alluvial aquifer. there are several candidate area which are geologically similar to it at East coast. The groundwater level was computed by a 2-D FDM model, where the watershed discharge is the input as the infiltration term. The baseflow computed as the mean value of 3 watershed dischrge model is $0.5m^3/sec$. And considering the inflow near the baseflow as the dry season inflow, The groundwater level according to the change of inflow and pumping rate was computed. Specifically, Using the real pumping rate $28000m^3/day$ which is equal to the supply amount of drinking water to Sokcho city, The inflow which induce the descended groundwater level to the bottom of aquifer or the ascended groundwater level that cause the surface flow was eatimated. The simulation for increased pumping rate and additional well construction to increase the water resources, was executed. And at the extreme dry season, available pumping rate was estimated.

Effect of Underground Dam for the Prevention of Seawater Intrusion at the Seom-jin River (지하댐 설치 시 섬진강 하류 염수침입 방지 효과의 모델기반 분석)

  • Kim, Sungyun;Kim, Gyoobum;Park, Joonhyeong;Shin, Seonho
    • Journal of the Korean GEO-environmental Society
    • /
    • v.12 no.8
    • /
    • pp.51-57
    • /
    • 2011
  • Surface water at the lower part of the Seom-jin river has a high salinity because the erosion at river bottom has made sea water move upstream continuously since 1978. The effect of underground dam on the prevention of sea water intrusion was modelled in this study. Present chloride concentration in surface water decreases exponentially along a river and in groundwater is about one-tenth of surface water's. The finite element method model, FEFLOW, was conducted on the assumption that the underground dam with a height of 25m over a bedrock is located under a water surface at the site of 4.6km from an estuary. The result shows that the position with chloride concentration of 0.25psu moves downstream from the sites of 25km to 22km, if an enough sedimentation with 5m thickness happens in the upper reservoir of underground dam. On the other side, the underground dam is little effective for the prevention of sea water intrusion in case of non-sedimentation.

Large Scale SWAT Watershed Modeling Considering Multi-purpose Dams and Multi-function Weirs Operation - For Namhan River Basin - (다목적 댐 및 다기능 보 운영을 고려한 대유역 SWAT 모형 구축기법 연구 - 남한강 유역을 대상으로 -)

  • Ahn, So Ra;Lee, Ji Wan;Jang, Sun Sook;Kim, Seong Joon
    • Journal of The Korean Society of Agricultural Engineers
    • /
    • v.58 no.4
    • /
    • pp.21-35
    • /
    • 2016
  • This study is to evaluate the applicability of SWAT (Soil and Water Assessment Tool) model for multi-purpose dams and multi-function weirs operation in Namhan river basin ($12,577km^2$) of South Korea. The SWAT was calibrated (2005 ~ 2009) and validated (2010 ~ 2014) considering of 4 multi-purpose dams and 3 multi-function weirs using daily observed dam inflow and storage, evapotranspiration, soil moisture, and groundwater level data. Firstly, the dam inflow was calibrated by the five steps; (step 1) the physical rate between total runoff and evapotranspiration was controlled by ESCO, (step 2) the peak runoff was calibrated by CN, OV_N, and CH_N, (step 3) the baseflow was calibrated by GW_DELAY, (step 4) the recession curve of baseflow was calibrated by ALPHA_BF, (step 5) the flux between lateral flow and return flow was controlled by SOL_AWC and SOL_K, and (step 6) the flux between reevaporation and return flow was controlled by REVAPMN and GW_REVAP. Secondly, for the storage water level calibration, the SWAT emergency and principle spillway were applied for water level from design flood level to restricted water level for dam and from maximum to management water level for weir respectively. Finally, the parameters for evapotranspiration (ESCO), soil water (SOL_AWC) and groundwater level fluctuation (GWQMN, ALPHA_BF) were repeatedly adjusted by trial error method. For the dam inflow, the determination coefficient $R^2$ was above 0.80. The average Nash-Sutcliffe efficiency (NSE) was from 0.59 to 0.88 and the RMSE was from 3.3 mm/day to 8.6 mm/day respectively. For the water balance performance, the PBIAS was between 9.4 and 21.4 %. For the dam storage volume, the $R^2$ was above 0.63 and the PBIAS was between 6.3 and 13.5 % respectively. The average $R^2$ for evapotranspiration and soil moisture at CM (Cheongmicheon) site was 0.72 and 0.78, and the average $R^2$ for groundwater level was 0.59 and 0.60 at 2 YP (Yangpyeong) sites.

Bhumipol Dam Operation Improvement via smart system for the Thor Tong Daeng Irrigation Project, Ping River Basin, Thailand

  • Koontanakulvong, Sucharit;Long, Tran Thanh;Van, Tuan Pham
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2019.05a
    • /
    • pp.164-175
    • /
    • 2019
  • The Tor Tong Daeng Irrigation Project with the irrigation area of 61,400 hectares is located in the Ping Basin of the Upper Central Plain of Thailand where farmers depended on both surface water and groundwater. In the drought year, water storage in the Bhumipol Dam is inadequate to allocate water for agriculture, and caused water deficit in many irrigation projects. Farmers need to find extra sources of water such as water from farm pond or groundwater as a supplement. The operation of Bhumipol Dam and irrigation demand estimation are vital for irrigation water allocation to help solve water shortage issue in the irrigation project. The study aims to determine the smart dam operation system to mitigate water shortage in this irrigation project via introduction of machine learning to improve dam operation and irrigation demand estimation via soil moisture estimation from satellite images. Via ANN technique application, the inflows to the dam are generated from the upstream rain gauge stations using past 10 years daily rainfall data. The input vectors for ANN model are identified base on regression and principal component analysis. The structure of ANN (length of training data, the type of activation functions, the number of hidden nodes and training methods) is determined from the statistics performance between measurements and ANN outputs. On the other hands, the irrigation demand will be estimated by using satellite images, LANDSAT. The Enhanced Vegetation Index (EVI) and Temperature Vegetation Dryness Index (TVDI) values are estimated from the plant growth stage and soil moisture. The values are calibrated and verified with the field plant growth stages and soil moisture data in the year 2017-2018. The irrigation demand in the irrigation project is then estimated from the plant growth stage and soil moisture in the area. With the estimated dam inflow and irrigation demand, the dam operation will manage the water release in the better manner compared with the past operational data. The results show how smart system concept was applied and improve dam operation by using inflow estimation from ANN technique combining with irrigation demand estimation from satellite images when compared with the past operation data which is an initial step to develop the smart dam operation system in Thailand.

  • PDF

Application of Geophysical Methods to Detection of a Preferred Groundwater Flow Channel at a Pyrite Tailings Dam (황철석 광산 광미댐에서의 지하수흐름 경로탐지를 위한 물리탐사 적용)

  • Hwang, Hak Soo
    • Economic and Environmental Geology
    • /
    • v.30 no.2
    • /
    • pp.137-142
    • /
    • 1997
  • At the tailings dam of the disused Brukunga pyrite mine in South Australia, reaction of groundwater with the tailings causes the formation and discharge of sulphuric acid. There is a need to improve remediation efforts by decreasing groundwater flow through the tailings dam. Geophysical methods have been investigated to determine whether they can be used to characterise variations in depth to watertable and map preferred groundwater flow paths. Three methods were used: transient electromagnetic (TEM) soundings, direct current (DC) soundings and profiling, and self potential (SP) profiling. The profiling methods were used to map the areal extent of a given response, while soundings was used to determine the variation in response with depth. The results of the geophysical surveys show that the voltages measured with SP profiling are small and it is hard to determine any preferred channels of groundwater flow from SP data alone. Results obtained from TEM and DC soundings, show that the DC method is useful for determining layer boundaries at shallow depths (less than about 10 m), while the TEM method can resolve deeper structures. Joint use of TEM and DC data gives a more complete and accurate geoelectric section. The TEM and DC measurements have enabled accurate determination of depth to groundwater. For soundings centred at piezometers, this depth is consistent with the measured watertable level in the corresponding piezometer. A map of the watertable level produced from all the TEM and DC soundings at the site shows that the shallowest level is at a depth of about 1 m, and occurs at the southeast of the site, while the deepest watertable level (about 17 m) occurs at the northwest part of the site. The results indicate that a possible source of groundwater occurs at the southeast area of the dam, and the aquifer thickness varies between 6 and 13 m. A map of the variation of resistivity of the aquifer has also been produced from the TEM and DC data. This map shows that the least resistive (i.e., most conductive) section of the aquifer occurs in the northeast of the site, while the most resistive part of the aquifer occurs in the southeast. These results are interpreted to indicate a source of fresh (resistive) groundwater in the southeast of the site, with a possible further source of conductive groundwater in the northeast.

  • PDF

A study on monitoring the inner structure of dam body using high resolution seismic reflection method (고분해능 탄성파 반사법을 이용한 댐체 내부구조 모니터링 연구)

  • Kim Jungyul;Kim Hyoungsoo;Oh Seokhoon;Kim Yoosung
    • 한국지구물리탐사학회:학술대회논문집
    • /
    • 2005.05a
    • /
    • pp.15-20
    • /
    • 2005
  • Defects of dam body which can be induced in seepage or leakage procedure can directly affect dam safety. Therefore, a proper inspection method should be carried out in the first place to find out their positions and sizes, After that, some reinforcement works such as grouting and the corresponding assessment could be taken in a proper way. The dam(center core type earth dam) issued in this study has been in need for intensive diagnosis and reinforcement work, because a lot of slumps similar to cracks, seepage and some boggy area have been observed on the downstream slope. High resolution seismic reflection method was performed on the crest profile twice before and after grouting work(Aug. 2001 and Nov. 2004) aimed at the dam inspection and the assessment of grouting efficiency as well. To enhance the data resolution, P-beam energy radiation technique which can reduce the surface waves and hence to reinforce the reflection events was used. Strong reflection events were recognized in the stack section before grouting work, It seems that the events would be caused by e.g. horizontal cracks with a considerable aperture, Meanwhile such strong reflection events were not observed in the section after grouting. That is, the grouting work was dear able to reinforce the defects of dam body. Hence, the section showed an well arranged picture of dam inner structure. In this sense, seismic reflection method will be a desirable technique for dam inspection and for monitoring dam inner structure as well.

  • PDF

A study on Monitoring the Inner Structure of Dam Body Using High Resolution Seismic Reflection Method (고분해능 탄성파 반사법을 이용한 댐체 내부구조 모니터링 연구)

  • Kim, Jung-Yul;Kim, Hyoung-Soo;Oh, Seok-Hoon;Kim, Yoo-Sung
    • Journal of the Korean Geophysical Society
    • /
    • v.8 no.1
    • /
    • pp.1-6
    • /
    • 2005
  • Defects of dam body which can be induced in seepage or leakage procedure can directly affect dam safety. Therefore, a proper inspection method should be carried out in the first place to find out their positions and sizes. After that, some reinforcement works such as grouting and the corresponding assessment could be taken in a proper way. The dam(center core type earth dam) issued in this study has been in need for intensive diagnosis and reinforcement work, because a lot of slumps similar to cracks, seepage and some boggy area have been observed on the downstream slope. High resolution seismic reflection method was performed on the crest profile twice before and after grouting work(Aug. 2001 and Nov. 2004) aimed at the dam inspection and the assessment of grouting efficiency as well. To enhance the data resolution, P-beam energy radiation technique which can reduce the surface waves and hence to reinforce the reflection events was used. Strong reflection events were recognized in the stack section before grouting work, It seems that the events would be caused by e.g. horizontal cracks with a considerable aperture. Meanwhile such strong reflection events were not observed in the section after grouting. That is, the grouting work was dear able to reinforce the defects of dam body. Hence, the section showed an well arranged picture of dam inner structure. In this sense, seismic reflection method will be a desirable technique for dam inspection and for monitoring dam inner structure as well.

  • PDF