• Title/Summary/Keyword: graph construction

Search Result 203, Processing Time 0.022 seconds

Calculation of Unit Hydrograph from Discharge Curve, Determination of Sluice Dimension and Tidal Computation for Determination of the Closure curve (단위유량도와 비수갑문 단면 및 방조제 축조곡선 결정을 위한 조속계산)

  • 최귀열
    • Magazine of the Korean Society of Agricultural Engineers
    • /
    • v.7 no.1
    • /
    • pp.861-876
    • /
    • 1965
  • During my stay in the Netherlands, I have studied the following, primarily in relation to the Mokpo Yong-san project which had been studied by the NEDECO for a feasibility report. 1. Unit hydrograph at Naju There are many ways to make unit hydrograph, but I want explain here to make unit hydrograph from the- actual run of curve at Naju. A discharge curve made from one rain storm depends on rainfall intensity per houre After finriing hydrograph every two hours, we will get two-hour unit hydrograph to devide each ordinate of the two-hour hydrograph by the rainfall intensity. I have used one storm from June 24 to June 26, 1963, recording a rainfall intensity of average 9. 4 mm per hour for 12 hours. If several rain gage stations had already been established in the catchment area. above Naju prior to this storm, I could have gathered accurate data on rainfall intensity throughout the catchment area. As it was, I used I the automatic rain gage record of the Mokpo I moteorological station to determine the rainfall lntensity. In order. to develop the unit ~Ydrograph at Naju, I subtracted the basic flow from the total runoff flow. I also tried to keed the difference between the calculated discharge amount and the measured discharge less than 1O~ The discharge period. of an unit graph depends on the length of the catchment area. 2. Determination of sluice dimension Acoording to principles of design presently used in our country, a one-day storm with a frequency of 20 years must be discharged in 8 hours. These design criteria are not adequate, and several dams have washed out in the past years. The design of the spillway and sluice dimensions must be based on the maximun peak discharge flowing into the reservoir to avoid crop and structure damages. The total flow into the reservoir is the summation of flow described by the Mokpo hydrograph, the basic flow from all the catchment areas and the rainfall on the reservoir area. To calculate the amount of water discharged through the sluiceCper half hour), the average head during that interval must be known. This can be calculated from the known water level outside the sluiceCdetermined by the tide) and from an estimated water level inside the reservoir at the end of each time interval. The total amount of water discharged through the sluice can be calculated from this average head, the time interval and the cross-sectional area of' the sluice. From the inflow into the .reservoir and the outflow through the sluice gates I calculated the change in the volume of water stored in the reservoir at half-hour intervals. From the stored volume of water and the known storage capacity of the reservoir, I was able to calculate the water level in the reservoir. The Calculated water level in the reservoir must be the same as the estimated water level. Mean stand tide will be adequate to use for determining the sluice dimension because spring tide is worse case and neap tide is best condition for the I result of the calculatio 3. Tidal computation for determination of the closure curve. During the construction of a dam, whether by building up of a succession of horizontael layers or by building in from both sides, the velocity of the water flowinii through the closing gapwill increase, because of the gradual decrease in the cross sectional area of the gap. 1 calculated the . velocities in the closing gap during flood and ebb for the first mentioned method of construction until the cross-sectional area has been reduced to about 25% of the original area, the change in tidal movement within the reservoir being negligible. Up to that point, the increase of the velocity is more or less hyperbolic. During the closing of the last 25 % of the gap, less water can flow out of the reservoir. This causes a rise of the mean water level of the reservoir. The difference in hydraulic head is then no longer negligible and must be taken into account. When, during the course of construction. the submerged weir become a free weir the critical flow occurs. The critical flow is that point, during either ebb or flood, at which the velocity reaches a maximum. When the dam is raised further. the velocity decreases because of the decrease\ulcorner in the height of the water above the weir. The calculation of the currents and velocities for a stage in the closure of the final gap is done in the following manner; Using an average tide with a neglible daily quantity, I estimated the water level on the pustream side of. the dam (inner water level). I determined the current through the gap for each hour by multiplying the storage area by the increment of the rise in water level. The velocity at a given moment can be determined from the calcalated current in m3/sec, and the cross-sectional area at that moment. At the same time from the difference between inner water level and tidal level (outer water level) the velocity can be calculated with the formula $h= \frac{V^2}{2g}$ and must be equal to the velocity detertnined from the current. If there is a difference in velocity, a new estimate of the inner water level must be made and entire procedure should be repeated. When the higher water level is equal to or more than 2/3 times the difference between the lower water level and the crest of the dam, we speak of a "free weir." The flow over the weir is then dependent upon the higher water level and not on the difference between high and low water levels. When the weir is "submerged", that is, the higher water level is less than 2/3 times the difference between the lower water and the crest of the dam, the difference between the high and low levels being decisive. The free weir normally occurs first during ebb, and is due to. the fact that mean level in the estuary is higher than the mean level of . the tide in building dams with barges the maximum velocity in the closing gap may not be more than 3m/sec. As the maximum velocities are higher than this limit we must use other construction methods in closing the gap. This can be done by dump-cars from each side or by using a cable way.e or by using a cable way.

  • PDF

A study on characteristics of palace wallpaper in the Joseon Dynasty - Focusing on Gyeongbokgung Palace, Changdeokgung Palace and Chilgung Palace - (조선시대 궁궐 도배지 특성 연구 - 경복궁, 창덕궁, 칠궁을 중심으로 -)

  • KIM Jiwon;KIM Jisun;KIM, Myoungnam;JEONG Seonhwa
    • Korean Journal of Heritage: History & Science
    • /
    • v.56 no.1
    • /
    • pp.80-97
    • /
    • 2023
  • By taking wallpaper specimens from Gyeongbokgung Palace, Changdeokgung Palace, and Chilgung Palace preserved from the late Joseon Dynasty to the present, we planned in this study to determine the types and characteristics of the paper used as wallpaper in the Joseon royal family. First, we confirmed the features of paper hanging in the palaces with old literature on the wallpaper used by the royal family based on archival research. Second, we conducted a field survey targeting the royal palaces whose construction period was relatively clear, and analyzed the first layer of wallpaper directly attached to the wall structure after sampling the specimens. Therefore, we confirmed that the main raw material was hanji, which was used as a wallpaper by the royal family, and grasped the types of substances(dyes and pigments) used to produce a blue color in spaces that must have formality by analyzing the blue-colored paper. Based on the results confirmed through the analysis, we checked documents and the existing wallpaper by comparing the old literature related to wallpaper records of the Joseon Dynasty palaces. We also built a database for the restoration of cultural properties when conserving the wallpaper in the royal palaces. We examined the changes in wallpaper types by century and the content according to the place of use by extracting wallpaper-related contents recorded in 36 cases of Uigwe from the 17th to 20th centuries. As a result, it was found that the names used for document paper and wallpaper were not different, thus document paper and wallpaper were used without distinction during the Joseon Dynasty. And though there are differences in the types of wallpaper depending on the period, it was confirmed that the foundation of wallpaper continued until the late Joseon Dynasty, with Baekji(white hanji), Hubaekji(thick white paper), jeojuji(common hanji used to write documents), chojuji(hanji used as a draft for writing documents) and Gakjang(a wide and thick hanji used as a pad). As a result of fiber identification by the morphological characteristics of fibers and the normal color reaction(KS M ISO 9184-4: Graph "C" staining test) for the first layer of paper directly attached to the palace wall, the main materials of hanji used by the royal family were confirmed and the raw materials used to make hanii in buildings of palaces based on the construction period were determined. Also, as a result of analyzing the coloring materials of the blue decorative paper with an optical microscope, ultraviolet-visible spectroscopic analysis(UV-Vis), and X-ray diffraction analysis(XRD), we determined that the type of blue decorative paper dyes and pigments used in the palaces must have formality and identified that the raw materials used to produce the blue color were natural indigo, lazurite and cobalt blue.

Construction of Gene Network System Associated with Economic Traits in Cattle (소의 경제형질 관련 유전자 네트워크 분석 시스템 구축)

  • Lim, Dajeong;Kim, Hyung-Yong;Cho, Yong-Min;Chai, Han-Ha;Park, Jong-Eun;Lim, Kyu-Sang;Lee, Seung-Su
    • Journal of Life Science
    • /
    • v.26 no.8
    • /
    • pp.904-910
    • /
    • 2016
  • Complex traits are determined by the combined effects of many loci and are affected by gene networks or biological pathways. Systems biology approaches have an important role in the identification of candidate genes related to complex diseases or traits at the system level. The gene network analysis has been performed by diverse types of methods such as gene co-expression, gene regulatory relationships, protein-protein interaction (PPI) and genetic networks. Moreover, the network-based methods were described for predicting gene functions such as graph theoretic method, neighborhood counting based methods and weighted function. However, there are a limited number of researches in livestock. The present study systemically analyzed genes associated with 102 types of economic traits based on the Animal Trait Ontology (ATO) and identified their relationships based on the gene co-expression network and PPI network in cattle. Then, we constructed the two types of gene network databases and network visualization system (http://www.nabc.go.kr/cg). We used a gene co-expression network analysis from the bovine expression value of bovine genes to generate gene co-expression network. PPI network was constructed from Human protein reference database based on the orthologous relationship between human and cattle. Finally, candidate genes and their network relationships were identified in each trait. They were typologically centered with large degree and betweenness centrality (BC) value in the gene network. The ontle program was applied to generate the database and to visualize the gene network results. This information would serve as valuable resources for exploiting genomic functions that influence economically and agriculturally important traits in cattle.