Proceedings of the Korean Geotechical Society Conference
/
2008.03a
/
pp.884-893
/
2008
The purpose of this case study is cut-slope stability in pyroclastic-rock area. Pyroclastic-rock is very vulerable by Chemical and physical weathering. And risk increase of Pyroclastic-rock proportional to exposure time. This case of cut-slope located in Jeollabuk-do Jinan-gun and reserch order is topography character research, geological character research, field survey, measure method presentation.
Borehole radar reflection surveys were carried out in the horizontal borehole to detect EDZ while constructing the tunnel for the research facility of the nuclear waste disposal in Korea. The horizontal borehole has been bored at a length of 35 m from shelter to be parallel with the tunnel which would be planed. While the tunnel has been constructing with the explosive excavation, the borehole radar reflection surveys carried out 5 times with the interval of 2 or 4 days for monitoring EDZ. The most typical change of the reflection event resulted from the face of the wall of tunnel which had been produced newly by the excavation of the tunnel daily, EDZ has been detected with constructing images of difference between two measurement stages, and also the change of EDZ through the time has been done, which is due to the generation of crack and weakening of the rock strength of the face of the tunnel's wall near previous portion of the face of a blind end of tunnel according to explosive excavation.
Proceedings of the Korean Geotechical Society Conference
/
2005.03a
/
pp.179-184
/
2005
Shear strength parameters obtained from filed survey are important factors in the analysis of slope stability. In this study, sensitivity analysis was performed to evaluate the effect of input parameters on the analysis of slope stability. The input parameters selected for sensitivity analysis were slope angle, cohesion, and friction angle. Monte-Carlo Simulation method was used for calculating input parameters and the factor of safety was computed by means of limit equilibrium method. A rock slope, which has failed in the field, was used for the sensitivity analysis in the analysis of slope stability. The result of analysis shows that the factor of safety of the rock slope was a little low. From partial correlation coefficient(PPC) of input parameters determined from the sensitivity analysis, slope stability was dependant on cohesion and slope angle. The effect of friction angle was lower than that of cohesion and slope angle on slope stability.
Railroad geotechnical information management system was developed by using Web GIS and DB in this study. The standardization of railroad geotechnical information is progressed by classifying three groups as like basic informations, vibration informations along railway lines and design drawings. The basic informations consisted of basic and dynamic properties of soils, geophysical exploration and seismic survey/exploration. And the specification for 'human exposure to whole-body vibration' was adopted to construct the vibration informations along railway lines. The informations as like drawings and photographs were saved by changing to graphic files in the standardization of design drawings. In the case of standardization of geographical information, the topographical maps(NGIS, 1:5000) were primarily used as digital maps. Another digital maps(KRRI, 1:5000) and their geographical DB based on NGI code system were added on this maps. The standardized informations were used to construct their database. And railroad information management system was developed using Entity-Relation(ER) model which had a good feasibility for expansion and transition to other system in designing stage of database. This system consisted of layer selection, search and analysis of geotechnical informations and Zeus DB was adopted for GIS operating and user interface. This system could be a good tool for saving, searching and analyzing the geotechnical and geophysical informations. These DB systems would offered the basic informations to plans, design and construction of railroad lines etc. in practical use.
Journal of Korean Society of Disaster and Security
/
v.10
no.1
/
pp.11-17
/
2017
The case study on ground subsidence was conducted and the cause of ground subsidence was evaluated, main cause were insufficient site exploration, inaccurate strength parameters, defective temporary wall, insufficient reaction for boiling and heaving, excessive excavation and so on. Risk factors during excavation were identified from the cause of ground subsidence and risk factors were site exploration, selecting excavation method, structure analysis, measurement plan, excavation method construction, underground water level change, natural disaster and construction management. The survey of the experts on risk factors identified was conducted to evaluate the importance of risk factors, and confidence analysis was performed to evaluate the significance level between survey result and survey respondent using Chi-square Test.
Lots of various utilities are buried under the surface. The effective management of underground utilities is becoming the very important subject for the harmonious administration of the city. Ground Penetrating Radar(GPR) survey including other various underground survey methods, is mainly used to detect the position and depth of buried underground utilities. However, GPR is not applicable, under the circumstances
of shallow depth and places, where subsurface materials are inhomogeneous and are composed of clay, salt and gravels. The aim of this study is to overcome these limitations of GPR and other underground surveys. High-frequency electromagnetic (HFEM) method is developed for the non-destructive precise deep surveying of underground utilities. The method is applied in the site where current underground
surveys are useless to detect the underground big pipes, because of poor geotechnical environment. As a result, HFEM survey was very successful in detecting the buried shallow and deep underground pipes and in obtaining the geotechnical information, although other underground surveys including GPR were not applicable. Therefore this method is a promising new technique in the lots of fields, such as underground surveying and archaeology.
Among the geophysical exploration methods, electromagnetic (EM) survey must have the broadest range of instrumental systems and remarkable range of applications. There is a plethora of available techniques and instruments, and the depth of investigation and resolution are highly dependent on the particular systems used according to their operating frequency and source-receiver configuration. This diversity of EM systems, however, provides a wide range of instruments or methodologies to choose in order to select the most appropriate tool for the task in hand. This rather than being a disadvantage, would be a major strength of EM methods. Modern EM equipments are remarkably portable, considering their sophistication. Coupled with major advances in recent computer technology, accurate modeling and interpretation techniques are on the way of continuous development and upgrade which, in turn, make the EM methods to become much more heavily used, especially for engineering and environmental applications. We aim to provide a brief theoretical principles, survey techniques and case histories of some selected EM methods that can be applied to geotechnical and environmental problems in Korea.
Kim, Jin-Hwan;Lee, Jeong-Yeob;Kim, Seung-Hyun;Koo, Ho-Bon
Journal of the Korean Geotechnical Society
/
v.25
no.12
/
pp.27-35
/
2009
KICT (Korea Institute of Construction and Technology) and KISTEC (Korea Infrastructure Safety and Technology Corporation) have been carrying out inventory survey on cut slopes along national roads since 2006. Unlike precision safety check, cut slope inventory survey is a simple check about cut slope's characteristics with the naked eye to collect the data base of slope maintenance. Inventory survey is classified into general status, cut slope characteristics and inspector opinions. The inventory data are analyzed to identify dangerous slopes and decide a safety ranking. In this paper, we performed a correlation analysis using SPSS (ver.15) about the 10,461 cut slope inventory data which are collected in Kangwondo and Chungcheongdo from 2006 to 2008. We calculated the correlation coefficient between cut slope inventory data and the danger score derived from the data. And we evaluated cut slope inventory data which have the more influence on the danger degree of cut slope. According to results of correlation analysis, we found that inventory data influencing cut slope danger degree are stuck and fallen rock, orientation of discontinuity and angle of upper slope. And these data are slightly different by regionally. Later on, if inventory research is finished, we will understand regional characteristics of cut slopes.
In tunnel design, geotechnical survey of over 200m tunnel depth is required because of its characteristical topography. For this reason, there are difficulties in collecting information of basic data in tunnel design because of large-scale costs in borehole tests, of limits to a geotechnical analysis by the existing refraction seismic survey and of analytical errors in steep mountainous area. Seismic tomography has many advantages as follows; 1) seismic velocity as absolute value is more reliable than electrical resistivity, 2) geotechnical analysis in deep tunnel depth is available by seismic velocity, 3) analytical errors is reduced in steep mountainous area. In this paper, it was found out a correlation of seismic velocity and Q in tunnel design in the neighborhood of the National Capital region and the reduction effect of tunnel construction cost using reliable rock quality by seismic tomography compared with by borehole data and electricity resistivity data.
Park, Sam-Gyu;Cho, Seong-Jun;Lee, Tae-Jong;Lee, Seong-Kon;Lee, Sang-Kyu
한국지구물리탐사학회:학술대회논문집
/
2007.06a
/
pp.285-290
/
2007
Electrical and electromagnetic methods were widely applied to survey of civil engineering, environment site assessments and maintenance of underground structures in Korea. Electro-physical properties measurements of soil and rock are necessary in order to quantitatively estimate the ground from these survey results. A few geotechnical researcher groups have been simplified measurement system of the electro-physical properties, which was intermittently operating by the necessity. Recent strong concern about $CO_2$ underground storage and development of gas hydrate projects have urged many advanced countries. The electro-physical properties estimation of the deep object stratum is very importance for basic information of these research. So, advanced countries have a high-end measurement system with high temperature(200 degrees) and pressure(300 MPa), also they have been a lot of experience and know-how on the electro-physical properties measurement.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.