• Title/Summary/Keyword: generator optimal operation

Search Result 85, Processing Time 0.02 seconds

Optimal Environmental and Economic Operation using Evolution Strategy (전력계통의 환경적.경제적운용을 위한 진화기법의 응용)

  • Lee, Won-Ju;Park, Chang-Joo;Kim, Kyu-Ho;You, Seok-Ku
    • Proceedings of the KIEE Conference
    • /
    • 1997.07c
    • /
    • pp.1088-1090
    • /
    • 1997
  • This paper presents an effective methodology of optimal environmental and economic operation using evolution strategy. In power systems, evolution strategy, based on natural selection and genetics, can analyze non-linear and discontinuous functions in global search techniques. The formulation using this search techniques is multi-objective function, which consists of fuel cost and environmental effects concerning the pollution of the Earth's atmosphere caused by the emission of $SO_2$ and $NO_x$ from thermal generator plants. The proposed algorithms are applied on system with 6 generator.

  • PDF

Development of algorism to optimal operation of Power Generation considering Regional Regulation of CO2 Emission (지역별 CO2 배출량규제를 고려한 발전소 최적운전 알고리즘의 개발)

  • Kim, Yong-Ha;Kim, Young-Gil;Lee, Pyong-Ho;Jo, Hyun-Mi;Woo, Sung-Min
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.59 no.11
    • /
    • pp.1936-1941
    • /
    • 2010
  • This purpose of this paper is to propose a methodology for optimal generating operation in power system to minimize the cost of generation subject to not only system constraints but also regional $CO_2$ emission constraints. To solve this ELD problem calculated range limit on minimum and maximum power outputs by regional Equal Generator how each regional capacity is connected into one and expressed Equal Fuel Cost Function considering regional $CO_2$ emission constraints. Accordingly, being modified regional load, new power outputs considering regional $CO_2$ emission constraints were calculated by ELD. The proposed model for evaluating availability is tested on IEEE RTS(Reliability Test System)-24 in detail.

Optimal Allocation of Shunt Capacitor-Reactor Bank in Distribution System with Dispersed Generators Considering Installation and Maintenance Cost (분산전원을 포함한 배전계통에서 설치비용과 유지보수 비용을 고려한 병렬 캐패시터-리액터 Bank의 최적 설치 위치 선정)

  • Heo, Jae-Haeng;Lyu, Jae-Kun;Lee, Woo-Ri;Park, Jong-Young;Park, Jong-Keun
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.62 no.11
    • /
    • pp.1511-1519
    • /
    • 2013
  • This paper proposes the allocation method for capacitor-reactor banks in a distribution system with dispersed generators to reduce the installation costs, the maintenance costs and minimize the loss of electrical energy. The expected lifetime and maintenance period of devices with moving parts depends on the total number of operations, which affects the replacement and maintenance period for aging equipment under a limited budget. In this paper, the expected device lifetimes and the maintenance period are included in the formulation, and the optimal operation status of the devices is determined using a genetic algorithm. The optimal numbers and locations for capacitor-reactor banks are determined based on the optimal operation status. Simulation results in a 69-bus distribution system with the dispersed generator show that the proposed technique performs better than conventional methods.

Local-Generator-Based Virtual Power Plant Operation Algorithm Considering Operation Time

  • Park, Sung-Won;Park, Yong-Gi;Son, Sung-Yong
    • Journal of Electrical Engineering and Technology
    • /
    • v.12 no.6
    • /
    • pp.2127-2137
    • /
    • 2017
  • A virtual power plant (VPP) is a system that virtually integrates power resources based on the VPP participating customer (VPC) unit and operates as a power plant. When VPP operators manage resources to maximize their benefits, load reduction instructions may focus on more responsive VPCs, or those producing high profitability, by using VPC resources with high operation efficiency. VPCs may thus encounter imbalance problems during operation. This imbalance in operation time would bring more participation for some VPCs, causing potential degradation of their resources. Such an operation strategy would be not preferable for VPP operators in managing the relationship with VPCs. This issue impedes both continual VPC participation and economical and reliable VPP operation in the long term. An operation algorithm is therefore proposed that considers the operation time of VPC generators for mandatory reduction of power resource consumption. The algorithm is based on constraints of daily and annual operation times when VPP operators of local generators perform capacity-market power transactions. The algorithm maximizes the operator benefit through VPP operations. The algorithm implements a penalty parameter for imbalances in operation times spent by VPC generators in fulfilling their obligations. An evaluation was conducted on VPP operational effects by applying the algorithm to the Korean power market.

Efficiency Analysis of Switched Reluctance Generator According to Current Shape under Rated Speed

  • Yu, Siyang;Lee, Dong-Hee;Ahn, Jin-Woo
    • Journal of international Conference on Electrical Machines and Systems
    • /
    • v.2 no.4
    • /
    • pp.491-497
    • /
    • 2013
  • This paper introduces the high efficiency operation of switched reluctance generator (SRG). The proposed SRG operates under the rated speed. The high efficiency can be obtained by the optimal current shape which can make the total losses minimum. For this purpose, theoretical analysis of the copper and core loss is done. In addition, a modified angle position control (MAPC) method which can get the optimal current shape over wide speed condition is presented. In order to verity the theory, the experimental platform is set up. The feasibility of the theory is verified by the simulation and experimental results. The proposed method is simple, reliable and easy to achieve.

Over-Excitation Protection Relaying using the 345kV Power System Modeling Data (345kV 계통 모델링 데이터를 활용한 과여자 보호계전기법)

  • Park, Chul-Won;Ban, Yu-Hyeon
    • The Transactions of the Korean Institute of Electrical Engineers P
    • /
    • v.60 no.4
    • /
    • pp.175-180
    • /
    • 2011
  • A large AC generator is an important component of the power system. It is a need for research of AC generator protection relay for the next-generation ECMS and an efficient operation of protection control system. However, most of protection and control systems used in power plants have been still imported as turn-key and operated in domestic. This may cause the lack of the correct understanding on the protection systems and methods, and thus have difficulties in optimal operation. In this paper, over-excitation protection relaying is one of the protective factors in generator protection IED was presented. The cause and protection principles were dealt and, DFT-based gain compensation algorithm was adopted for the frequency measurement. The Republic of Korea 345kV modeling data by EMTP-RV was used for performance evaluation.

Power Closed-loop Control of Switched Reluctance Generator for High Efficiency Operation

  • Li, Zhenguo;Gao, Dongdong;Ahn, Jin-Woo
    • Journal of international Conference on Electrical Machines and Systems
    • /
    • v.1 no.3
    • /
    • pp.397-403
    • /
    • 2012
  • This paper describes a control method of turn-on/off angles to improve the efficiency of the switched reluctance generator(SRG) with a power closed-loop control system, and the inner-loop of the system is current hysteresis control. The SRG control system is constituted by the PI power controller and the two-level current hysteresis controller. By measuring and analyzing the system losses of different reference powers, speeds and turn-on/off angles, selection strategy of optimal turn-on/off angles is discussed. The proposed method is simple, reliable, and easy to achieve.

Characteristics on Stand-alone Operation of a Doubly-fed Induction Generator Applied to Adjustable Speed Gas Engine Cogeneration System

  • Daido, Tetsuji;Miura, Yushi;Ise, Toshifumi;Sato, Yuki
    • Journal of Power Electronics
    • /
    • v.13 no.5
    • /
    • pp.841-853
    • /
    • 2013
  • An application of doubly-fed induction generator (DFIG), which is one of adjustable speed generators, to a gas engine cogeneration system has been investigated. To operate during a blackout as an emergency power supply is one of important roles for the gas engine cogeneration system. However, the DFIG requires initial excitation for startup during a blackout because the DFIG has no excitation source. In this paper, we propose the "blackout start" as a new excitation method to generate a rated voltage at the primary side during a blackout. In addition, a stand-alone operation following a blackout has been investigated by using experimental setup with a real gas engine. Power flows in the generating set with the DFIG at the stand-alone operation have been investigated experimentally. Experimental investigation of the power flow suggests that the generating set with DFIG has optimal speed in minimizing whole system losses.

The study on the optimal control of generators on the single operation of electric power system in Gwangyang steel works (광양제철소 전력계통 단독 운전시 발전기 최적제어방안 연구)

  • Kwak, In-Cheol;Shin, Min-Kyo;Coi, Yun-Jong;Park, Poo-Gyeon
    • Proceedings of the KIEE Conference
    • /
    • 2006.10c
    • /
    • pp.357-359
    • /
    • 2006
  • The electric power system of Kwangyang steel works needs to keep the parallel operation with the system of KOPEC(Korea Electric Power Corporation) for supplying the power with safety. Once it is separated from KOPEC due to an accident, it operates the automatic Mill trip system to prevent huge fluctuating loads from the serious frequency drop. In spite of that, it is recent situations that the continuous growth of electric loads facilitates the frequency drop. Therefore, this paper proposes a model of generator control system so as to quantitatively analyze the response characteristics to the frequency change under the single operation, and also suggests the strategy for minimizing the frequency changes. The simulation results show it is desirable to operate the generators by 3% speed droop and 10% load limiter.

  • PDF

A Study on Optimal Electric Load distribution of Generators on board using a Dynamic Programming (동적계획법을 이용한 선내 발전시스템의 최적부하분담 방법에 관한 연구)

  • 유희한
    • Journal of Advanced Marine Engineering and Technology
    • /
    • v.24 no.3
    • /
    • pp.106-112
    • /
    • 2000
  • Since the oil crisis, we have been concerned about the energy saving techniques of electric generating systems. As a part of the effort to save energy, automatic electric load sharing device was developed. Usually, ship's electric generating system consists of two or three sets of generator. And, electric generating system is operated as single or parallel operation mode according to the demanded electric power. Therefore, it is important to investigate generators operating mode for the supply of required electric power in the ship in order to decrease the operating cost. So, this paper suggests the method to solve the optimal electric load distribution problem by dynamic programming. And, this thesis indicates that the proposed method is superior to the lagrange multiplier's method in obtaining optimal load distribution solution in the ship's electric generating system.

  • PDF